Optimizely Web: injected Project JavaScript reached 178 organisations' visitors on 2026-11-16; Optimizely says an Experimentation vulnerability was exploited and is fixed
TL;DR #
On 2026-11-16 an attacker wrote code into the Project JavaScript field of many unrelated Optimizely Web customer projects. Report URI found it in 188 snippets belonging to 178 organisations, 32 of them in banking and finance, including HSBC sites in 11 countries, Equifax and ABN AMRO. The code swapped cryptocurrency addresses, skimmed card numbers typed into a site's own forms, sent readable cookies and a page screenshot to the attacker, and loaded iOS exploit kit pages on iPhones and iPads. Report URI found 1 of 188 snippets still infected at 21:52 UTC. On 2026-11-17 Optimizely said an unauthorized party "exploited a vulnerability in Experimentation" and that the flaw is fixed. It gave no detail, and no CVE id exists. If your site loads Optimizely Web, audit every project's Project JavaScript and rotate Optimizely credentials now.
What happened #
Optimizely Web works by having each customer load a JavaScript snippet, normally from cdn.optimizely.com. The snippet carries an optional Project JavaScript field (projectJS), custom code that runs on every page. Report URI says the attacker wrote into that field and left the rest of each snippet untouched. The file was still served from Optimizely's host with Optimizely's certificate. Report URI states this was not CDN cache poisoning. Sites that host the snippet on their own domain were affected too, because the content comes from the same project.
This is not a flaw in a JavaScript library and there is no package to upgrade. No source cites a CVE id. The researchers name three possible causes and confirm none: a compromised Optimizely system, a compromised credential with access across customers, or something else. Report URI says it contacted Optimizely and had no response at publication. StepSecurity found no statement as of 21:44 UTC. Optimizely's status page, read on 2026-11-16, lists two unrelated incidents and nothing about this.
Report URI saw three loader versions:
- A plain script tag for
track.json1688360[.]cc. Most snippets carried this one. - The same URL in base64, decoded with
atob(). A text search for the domain does not find it. Smartsheet's snippet was cleaned and then re-infected with this version, so the attacker still had access at that time. - A full inline copy of the payload that runs through
evalwhen the domain is blocked. Hudson Rock found this copy in the BBC and HSBC UAE snippets.
Times are UTC on 2026-11-16 unless dated, from Report URI's timeline.
| Time | Event |
|---|---|
| 2026-11-13 to 2026-11-16 | Earlier wave. An injector on webshell[.]lol is added through Kissmetrics, StorifyMe and Minute Media scripts. |
| 04:21 | First Optimizely injection seen, in the BBC snippet. Hudson Rock's archive record is 04:31. |
| 05:23 | 1688360[.]cc registered. |
| 08:10 | First build of track.js, the address swapper. |
| 13:43 | Card skimmer added. |
| 17:13 to 17:57 | Second iOS host added. A Coruna iframe is injected into every visit from iOS 18.6 or earlier. |
| 19:24 to 19:59 | Report URI's sweep finds 186 of 1,611 snippets infected. |
| about 20:40 to 21:10 | Mass clean-up. |
| 21:52 | 1 of 188 snippets still infected. |
Report URI says the payload was rebuilt 26 times that day. StepSecurity puts the exposure window at "at least 13 hours".
What the payload does #
- Address swapping. It replaces BTC, ETH and other EVM, TRON, Solana, TON, LTC, BCH and DOGE addresses with the attacker's. It covers page text, form fields, links, the clipboard, outgoing requests and the iOS share sheet. This runs inside the page, so no network rule stops it.
- Card skimming. It watches form submissions and
fetchand XHR POST bodies for a Luhn-valid card number, an expiry date and a CVV, then sends them to/card.phpon the attacker's host withnavigator.sendBeacon. Cards typed into a hosted payment iframe on another origin, such as Stripe or Adyen fields, were out of reach. Cards typed into a site's own form fields were not. - Cookie and screenshot theft. After a swap it sends the page URL,
document.cookieand an html2canvas screenshot to/hit.php. HttpOnly cookies are not readable by this code. - iOS exploit kit loading. On iPhone and iPad it loads
boot.jsfrom.icuhosts, which read the iOS version and open an exploit page in a hidden iframe. Report URI names the kits as Coruna for iOS 13 to 17 and DarkSword for iOS 18.x. It says the kit's own comments list iOS 18.7.3 and later, and 26.3 and later, as patched. Hudson Rock's tests used headless Chrome with iOS user-agent strings. They show what the router served. They do not show that any device was compromised.
Report URI counts about $7,040 received by the attacker's wallets by 19:25 UTC. StepSecurity counts about $6,600. Neither can see how many cards or cookies reached the attacker.
Who was named #
Report URI's list has 178 organisations in 20 sectors. The real number is likely higher, because it could check only the snippets it found. Banking and finance has 32 entries:
Paychex, HSBC US, Equifax (including my.equifax.com and signin.my.equifax.com), SmartAsset, HSBC Hong Kong, ABN AMRO (Germany, Netherlands, MeesPierson Belgium), TaxAct, HSBC Mexico, HSBC Singapore insurance, NetCredit, Associated Bank, S-Pankki, Equifax Canada, Equifax UK, The Work Number, Funding Circle, HSBC Australia, CashNetUSA, OnDeck, ICS Cards, HSBC UAE, HSBC Malaysia, Rest Super, HSBC Taiwan, HSBC Vietnam, HSBC Egypt, HSBC Philippines, SmartAdvisor Match, Compare Club, ABN AMRO Lease, Energy Scout and Hang Seng Investment.
Other sectors include crypto and trading (Ledger, IG, OANDA, interactive investor), insurance (Mutual of Omaha, Admiral, Securian Financial), software (Zoom, Salesforce, GitLab, Bitly, Mixpanel, Typeform, Hootsuite, Smartsheet), news (BBC, CNN, Fox News, NPR) and retail (IKEA, ASOS). Report URI says the snippets for www.optimizely.com and login.optimizely.com carried the code as well.
A listing means the organisation's snippet carried the code when a researcher fetched it. It does not say which pages loaded the snippet, or whether a login or payment page did. None of the named organisations is quoted in the three reports.
What Content Security Policy did #
Report URI evaluated the policies of affected hosts and reports this breakdown:
| Result | Organisations |
|---|---|
| No CSP at all | 68 |
| CSP allowed the payload and the data theft | 50 |
Payload ran, connect-src blocked the data theft, address swapping still worked |
17 |
| Payload blocked | 24 |
Allowing cdn.optimizely.com did nothing, because the code came from that host. A script-src that lists only the hosts the site needs blocked track.js. Two settings let the payload through. 'strict-dynamic' trusts any script the Optimizely snippet inserts. 'unsafe-eval' let the inline copy run where track.js was blocked. Report URI says that is what happened at HSBC, whose policy blocked track.js and the data theft but not the inline copy. Report URI also says Optimizely's documentation tells customers to allow 'unsafe-eval'.
Am I affected? #
As a site owner:
- Your site loads Optimizely Web, from
cdn.optimizely.comor from a copy on your own domain. - Your site loads Kissmetrics, StorifyMe or minute-ly scripts. Hudson Rock documents poisoned responses from those providers from 2026-11-13.
- Check what visitors receive, not only the dashboard. Replace the project id and review every hit:
curl -s "https://cdn.optimizely.com/js/<PROJECT_ID>.js" | grep -noE '1688360|track\.js|[a-z0-9]{15}\.icu|atob\([^)]{0,80}|_k7'
curl -sI "https://cdn.optimizely.com/js/<PROJECT_ID>.js" | grep -i last-modified
- A
Last-Modifiedtime on 2026-11-16 that matches no change your team made is a signal. A clean result now does not show the snippet was clean earlier in the day. - Search DNS, proxy and CSP report logs from 2026-11-13 for the indicators below. A hit shows that a visitor's page carried the loader and tried to reach the attacker's host. A blocked request or a CSP violation report is an attempt your policy stopped, not proof that the payload ran. A completed request to
/card.phpor/hit.phpis the signal that data left the page.
As a visitor:
- You used a site on Report URI's list on 2026-11-16 and typed a card number into the site's own form, copied a cryptocurrency address, or browsed on an iPhone or iPad running iOS 18.6 or earlier.
Indicators #
Domains are attacker-owned and written defanged. Block them with subdomains. Do not open them.
| Indicator | Role |
|---|---|
1688360[.]cc, 136[.]113[.]106[.]136 |
Payload and collection host. Paths /track.js, /card.php, /hit.php, /html2canvas.min.js. |
5vobauua3ojpklx[.]icu, eil786npto9u5bq[.]icu |
iOS routers serving boot.js. |
l7bcsnwc7nzr3uo[.]icu |
Telemetry, POST /api/iptj. |
je4ft3gn8vxudum[.]icu, q1ls1ho9x7wsxlu[.]icu, ios-hack[.]icu |
Fallback hosts named in boot.js. |
p55abnw2pnsz0bo[.]icu, 1y69gy2mdzaltz1[.]icu, gm38duxoihbmy5o[.]icu |
Same certificates and addresses as the kit. |
webshell[.]lol, linkforge[.]cc |
Injector get.js and the script that carried it, earlier wave. |
window._k7, window._cc, window._qxc, window._shot |
Globals the payload sets. |
sessionStorage keys starting cc_ |
Captured card data held by the skimmer. |
data-channel-code="02111110", path /JIUJIU888/weifile.html |
iOS loader markers. |
f7b84b9a94f749f8ced3f0112d0a66894e8bbc3b4aa5592021d1b8976a9bad40 |
SHA-256 of track.js live from 17:56 UTC. The file changed 26 times, so match on behaviour and domains. |
Attacker wallets, identical in all three reports:
- BTC
19g9rZcPeiz8rUvyWpTRyXXhPnjsWrc3kW - ETH and EVM
0xC4026b06D82b0F0B363eda0642D61CfbDc17884e - TRON
THvs6p56XkUiMkJeSc51cAP64u2RsTYqxa - SOL
FVtL8NMYS9PA1v3HE67XUGCtGA9JaZUvqav2fU2LrV5n - TON
UQAgM1VqSZQiJLSG5w-ovurq5CZdxLEK3_7CMmwALTA5e09p - LTC
ltc1q3wp7g6ds0ggg6fl6kncpa4sepn0q3qfacgred5 - BCH
qzkaaf8n6grmpr0d9lx8xutn3r9lk722f566hhpe58 - DOGE
DBEGrxRF7KMSuhTS4c1MFviStU6efdMnu5
If you are affected #
Site owners:
- Save evidence first: the snippet bytes, hash, response headers, fetch time and the project's change history.
- Remove any code you did not write from every project's Project JavaScript and from every experiment's custom code. Fetch the public snippet again and confirm it is clean.
- Review every user, API token and integration with write access to your Optimizely account and rotate the credentials. The cause is unknown, and one snippet was re-infected after cleaning. Keep checking the snippet until Optimizely explains.
- Ask Optimizely which of your project ids changed, when, and through which account or token.
- Treat cards typed into your own form fields on 2026-11-16 as exposed. Start your card-data incident process with your acquirer.
- Treat session tokens and secrets in cookies without HttpOnly as exposed. End those sessions and rotate the secrets.
- Decide whether to notify customers. That is a legal decision for your organisation.
- Follow playbooks/if-your-webapp-was-compromised.md for the rest.
Visitors:
- Update iPhones and iPads to iOS 18.7.3 or later, or iOS 26.3 or later.
- Check any cryptocurrency transfer made on 2026-11-16 against the address you meant to pay. For new transfers, compare the address on the wallet or hardware-wallet screen with the intended one, not with what you copied.
- Watch card statements if you paid by card on a listed site, and ask your issuer for a replacement card if you typed it into the site's own form.
Prevention #
- Send a Content Security Policy whose
script-srclists only the hosts you need. Restrictconnect-srcandframe-src. Avoid'unsafe-eval'and do not rely on'strict-dynamic'to contain a tag manager or experimentation script. Turn on reporting and read the reports. - Keep third-party tags off login, payment and account pages. Load them only where the experiment runs.
- Take card data in the payment provider's hosted fields in an iframe on another origin. That kept cards out of reach here.
- Set HttpOnly on session cookies.
- Subresource Integrity cannot pin a snippet that the vendor rebuilds on every project change. For a script like that, CSP and page scoping are the controls.
- Apps built with coding agents often ship with no CSP and with analytics or experiment tags on every route. Check both with playbooks/auditing-a-vibe-coded-repo.md. The wider map is prevention/supply-chain-attack-surface.md.
Update 2026-11-17: Optimizely confirms a vulnerability in Experimentation was exploited and says it is fixed #
Optimizely posted a status incident on 2026-11-17 at 01:02 UTC, titled "Web Experimentation Security Incident", for the Snippet Delivery component. The page held one update when read, in the Monitoring state:
Earlier today, Optimizely identified a security incident in which an unauthorized party exploited a vulnerability in Experimentation and used it to add malicious JavaScript to some customer projects. We've fixed the vulnerability and removed the injected code from affected projects. We've also taken steps to secure affected user accounts and put additional protections in place to prevent unauthorized code from being delivered.
What the statement does not say: which vulnerability, how many projects, when the fix went in, and what customers should do. No CVE id exists. SecurityWeek reports that Optimizely has not said how many customers were affected. The Hacker News lists the same gaps.
status moves from active to contained on the vendor's sentence that the vulnerability is fixed and the code removed. The checks and the rotation steps in this file still apply, because the vendor has not named the affected projects. Ask Optimizely which of your projects were changed and when.
Update 2026-11-25: CVE-2026-132224 assigned, and CISA lists it as exploited #
- MITRE published CVE-2026-132224 on 2026-11-18. The record says Optimizely Web Experimentation "before 2026-11-17 mishandles the account signup flow", which led to attacker-controlled code in the Project JavaScript field of some
cdn.optimizely.comassets. - The record's score is 7.1,
CVSS:4.0/AV:N/AC:H/AT:N/PR:L/UI:N/VC:N/VI:H/VA:N/SC:H/SI:H/SA:N. This file stayscriticalbecause the code ran on visitors' pages at 178 organisations. - CISA added the id to its Known Exploited Vulnerabilities catalog on 2026-11-24.
- The record references an Optimizely incident report dated 2026-11-17, a PDF on
pages.optimizely.com. It was not opened for this file. - The affected entry is a date, not a version. The service was fixed by the vendor, and site owners have nothing to upgrade. The audit and rotation steps above still apply.
Sources #
Three researcher reports, read 2026-11-16. The vendor statement of 2026-11-17 is in the update above.
- Report URI: World's Largest Brands Infected With Malware Via Optimizely, Scott Helme, 2026-11-16. Source for the mechanism, the three loader versions, the timeline, 188 snippets and 178 organisations, the sector list, the CSP table, the wallet total and the actions. Its CSP table rows sum to 159 and its text gives 178 organisations. The post does not explain the difference.
- StepSecurity: OPTIMJACK, 2026-11-16. Source for the campaign name, the skimmer and screenshot detail, browser artifacts, the 13-hour window and the absence of a vendor statement. It lists 17 domains with a stored payload capture. It says the iOS stage was not verified and that its request to
www.optimizely.comfailed, where Report URI says that snippet was infected. - Hudson Rock: Poisoned Scripts on BBC, Zoom and Other Major Websites Linked to iPhone Exploit Loaders, 2026-11-16. Source for the four providers, the embedded fallback in the BBC and HSBC UAE snippets, and the limits of the iOS evidence.
- Optimizely status, read 2026-11-16. Two incidents that day, neither about this.
- Scott Helme's posts on X, 2026-11-16, read from screenshots supplied by the repository owner. The posts were not fetched. They give the count of 186 sites and the first indicator list.
- Conflicts kept as printed: the first BBC injection is 04:21 in Report URI and 04:31 in Hudson Rock. The wallet totals differ, about $7,040 in Report URI and about $6,600 in StepSecurity.
- Not covered: Optimizely's trust centre and customer email, statements from any named organisation, Apple's advisories for the exploit chains, and the Amirul Cyber post that StepSecurity cites.
- Optimizely status: Web Experimentation Security Incident, read 2026-11-17 through the page's JSON: the statement quoted in the update, its time and state.
- SecurityWeek, 2026-11-17 and The Hacker News, 2026-11-17: what the vendor statement leaves out.
- CVE-2026-132224, CNA MITRE, published 2026-11-18, read 2026-11-25. Description, score and the KEV entry of 2026-11-24, also in the CISA KEV JSON feed read the same day.