NVIDIA BioNeMo Framework: two deserialization CVEs (CVE-2026-24164, 8.8) fixed by commit, first tagged in v3.0.0
TL;DR #
NVIDIA's BioNeMo Framework, used for protein and molecule models, has two flaws in how it loads serialized data. CVE-2026-24164 is scored 8.8 and CVE-2026-24165 is scored 7.8, both by NVIDIA, and both can lead to code execution when a user loads crafted data. NVIDIA gives the fix as two commits, not a version. The first tagged release that contains both is v3.0.0 (2026-06-24). Use v3.0.0 or later, or a checkout of main, and load only model and dataset files from sources you trust.
What happened #
NVIDIA's bulletin 5808, "Security Bulletin: NVIDIA BioNeMo Framework - March 2026", is dated 2026-03-31.
| CVE | NVIDIA score | Vector | Affected | Fix |
|---|---|---|---|---|
| CVE-2026-24164 | 8.8 | AV:N/AC:L/PR:N/UI:R/S:U/C:H/I:H/A:H |
all versions that do not include commit f2c2b14 | any branch that includes f2c2b14 |
| CVE-2026-24165 | 7.8 | AV:L/AC:L/PR:N/UI:R/S:U/C:H/I:H/A:H |
all versions that do not include commit e5e58c8 | any branch that includes e5e58c8 |
Both are classed as deserialization of untrusted data (CWE-502). The bulletin's summary line says to update to commit e5e58c8 or later, while the CVE-2026-24164 row names f2c2b14. You need both.
Mapping the commits to releases. The repository NVIDIA/bionemo-framework now resolves to NVIDIA-BioNeMo/bionemo-recipes. Commit f2c2b14 is dated 2026-01-20 and e5e58c8 is dated 2026-01-22. The GitHub compare API shows both are in tag v3.0.0 (published 2026-06-24) and are not in v2.7 or v2.7.1. Between January and June no tagged release contained them, so a user who installed the newest release during that time was unpatched for five months after the commits landed.
A scanner cannot match on these records. The affected field is a sentence about a commit, not a version range.
Am I affected? #
git -C /path/to/bionemo merge-base --is-ancestor f2c2b14 HEAD && echo "has f2c2b14"
git -C /path/to/bionemo merge-base --is-ancestor e5e58c8 HEAD && echo "has e5e58c8"
- A source checkout is affected unless both lines print.
- Tags v2.7 and v2.7.1 do not contain these two commits. Not checked: whether a backport exists under another commit.
- Containers and downstream packages that bundle the framework were not checked for this file.
If you are affected #
- Move to v3.0.0 or later, or to a checkout that contains both commits.
- If an affected install loaded checkpoints or datasets from an untrusted source, treat the machine as you would after running untrusted code. See if your local AI agent was exploited.
- None of the sources below reports exploitation.
Prevention #
- Treat a model checkpoint or a pickled dataset as code. Load only files you produced or that come from a source you trust.
- Run training and inference jobs for downloaded models with no credentials in the environment. See agent sandboxing and credential hygiene.
Sources #
- NVIDIA product-security mirror, bulletin 5808, read through the GitHub API on 2026-11-16: title, date, both CVE rows, the summary line, credits to Thomas Keefer, Dan Aridor and CheN.
- CVE Services: CVE-2026-24164, fetched 2026-11-16: NVIDIA CNA, published 2026-03-31, the affected sentence, 8.8 and the vector.
- Repository
NVIDIA-BioNeMo/bionemo-recipes, read through the GitHub API on 2026-11-16: the two commit dates, the compare results againstv3.0.0,v2.7.1andv2.7, and the release date ofv3.0.0. - Not opened: NVIDIA's support-site page for the bulletin, which blocks fetches, and the CVE record for CVE-2026-24165.