TL;DR

NVIDIA Isaac Lab, the robot-learning framework built on Isaac Sim, evaluates untrusted input as code in versions 0.0 through 2.3.2 (CVE-2026-65141, CVSS 7.8, scored by NVIDIA). A user has to load crafted input, and the result is code execution as that user. Upgrade to 3.0.0, which reached PyPI on 2026-10-19, six days after the bulletin. Until then the fix existed only in beta tags.

What happened

NVIDIA's bulletin 5902, "Security Bulletin: NVIDIA Isaac Lab - October 2026", is dated 2026-10-13 and holds this one CVE. It classes the flaw as eval injection (CWE-95), with the vector AV:L/AC:L/PR:N/UI:R/S:U/C:H/I:H/A:H. The bulletin and the CVE record give the same affected range, 0.0 through 2.3.2. Neither describes which input reaches the evaluation.

Fixed version. The bulletin's table says "3.0-beta2" and its text says to install the latest version. The CVE record names no fixed version.

Release Date On PyPI as isaaclab
v2.3.2, last affected 2026-02-02 yes
v3.0.0-beta2, the bulletin's fix 2026-06-17 no beta version was listed
v3.0.0-beta2.patch1 2026-07-02 no beta version was listed
v3.0.0 2026-10-20 on GitHub, 2026-10-19 on PyPI yes

On the day of the bulletin, the newest version pip would install was 2.3.2.post1, a repackaging of the last affected release. This file did not check that the v3.0.0-beta2 tag contains the fix. The bulletin is the source for that.

Am I affected?

pip show isaaclab 2>/dev/null | grep -E '^(Name|Version)'
  • Affected: 2.3.2 and earlier. The bulletin does not mention 2.3.2.post1. Treat it as affected, because it was uploaded eight months before the bulletin.
  • A source checkout is affected unless it is at v3.0.0-beta2 or later.

If you are affected

  • Upgrade to 3.0.0. Version 3 is a major release, so check your tasks and extensions against it.
  • If an affected install loaded task files, configurations or assets from an untrusted source, treat the machine as you would after running untrusted code. See if your local AI agent was exploited.
  • None of the sources below reports exploitation.

Prevention

  • Load simulation tasks, configurations and assets only from sources you trust.
  • Run simulation and training jobs with no cloud credentials in the environment. See agent sandboxing.

Sources

  • NVIDIA product-security mirror, bulletin 5902, read through the GitHub API on 2026-11-16: title, date, the one CVE, the range, "3.0-beta2", credit to Renan Malafatti.
  • CVE Services: CVE-2026-65141, fetched 2026-11-16: NVIDIA CNA, published 2026-10-13, product Isaac Lab, version "0.0-2.3.2", 7.8 and the vector, no fixed version.
  • Isaac Lab releases (isaac-sim/IsaacLab), read through the GitHub API on 2026-11-16: the tags and dates above.
  • PyPI isaaclab, queried 2026-11-16: 2.3.2 on 2026-02-02, 2.3.2.post1 on 2026-02-11, 3.0.0 on 2026-10-19, no pre-release versions listed.
  • Not checked: the contents of the v3.0.0-beta2 tag.