TL;DR

OpenUSD 26.08 and earlier has a double free in the code that reads binary USD files (.usdc, and .usdz packages that hold them). A crafted file can run code in the process that opens it (CVE-2026-92211, CVSS 7.8, found by Trend Micro's Zero Day Initiative). Pixar's advisory says it is fixed in 26.11. On PyPI that is usd-core 26.11, uploaded 2026-10-21. Two more Pixar advisories dated 2026-10-30, with no CVE, cover usdview and usdedit passing text from a file or a file name to os.system. Upgrade usd-core to 26.11 and open only USD files you created or trust. A scanner that reads the GitHub Advisory Database will not flag an old usd-core, because that database had no row for this CVE on 2026-11-16. Check Pixar's repository advisory tab instead.

What happened

CVE-2026-92211. ZDI's advisory ZDI-26-791 says the flaw is in the parsing of USDC and USDZ files and results from not checking that an object exists before freeing it. The vector is local with user interaction (AV:L/AC:L/PR:N/UI:R/S:U/C:H/I:H/A:H). ZDI's timeline: reported to Pixar on 2026-04-15, coordinated public release on 2026-10-26. The CVE record was published by ZDI on 2026-11-03.

Three statements of the affected range. They do not agree.

Source Versions named Fixed
CVE record (ZDI CNA) v26.03 only not stated; references commit 7c62a43
Pixar advisory GHSA-75r4-2rhh-hrxw (repository tab, 2026-10-30) <= 26.08 >= 26.11
ZDI report quoted in Pixar's advisory tested on usd-core 26.3, OpenUSD 26.03 and a 26.05 pre-release

Use Pixar's range. PyPI writes the releases as 26.3, 26.5 and 26.8, and Pixar writes 26.03, 26.05 and 26.08. They are the same releases. The fix commit, "sdf: Fix crate file loading code to reject obsolete versions early", is dated 2026-09-28, after the 26.05 and 26.08 releases. PyPI shows usd-core 26.5 uploaded 2026-04-24, 26.8 on 2026-07-20 and 26.11 on 2026-10-21. A scanner that reads only the CVE record's v26.03 would call 26.5 and 26.8 clean. Pixar's advisory says they are affected.

Two more advisories, 2026-10-30, High, no CVE.

  • GHSA-qgc5-vc49-x7jw: two usdview context menu items call os.system on identifiers taken from an opened layer's content. Pixar's text says a command embedded in the identifier may run when the user selects the menu item.
  • GHSA-5hf7-7jmm-gqcf: usdedit puts the file name the user supplies into os.system calls.

Both list affected <= 26.08 and patched >= 26.11, fixed by commit 05f0191.

Version labels. PyPI's newest usd-core is 26.11. The newest GitHub release is tagged v26.11.1, published 2026-10-21. Both are inside Pixar's patched range of 26.11 and later.

Earlier rows. The GitHub Advisory Database lists two older usd-core advisories: GHSA-58p5-r2f6-g2cj (fixed 25.8) and GHSA-grjp-54v3-c442 (fixed 25.11). Pixar's repository tab held 13 published advisories on 2026-11-16.

Why this matters for agent users. OpenUSD is the scene format under NVIDIA Omniverse and most digital-twin pipelines. An agent told to convert, inspect or import a .usdz it downloaded opens the file for you, so "local, user interaction required" describes an ordinary agent task.

Am I affected?

pip show usd-core 2>/dev/null | grep -E '^(Name|Version)'
  • Affected by CVE-2026-92211: usd-core before 26.11, and source builds of OpenUSD 26.08 and earlier.
  • The usdview and usdedit advisories apply to source and full builds only. Pixar's usdedit advisory says usd-core is unaffected because it does not include the tools.
  • Applications that bundle their own OpenUSD (DCC tools, viewers, converters) carry the bundled version, not the one pip shows. Not checked: any application that bundles OpenUSD. Read that vendor's release notes.
  • You are exposed when the process opens a .usdc or .usdz file from someone else. The advisory names only .usdc and .usdz. It does not say whether .usda files are safe, and the usdview and usdedit bugs do not depend on the file type.

If you are affected

  • Upgrade usd-core to 26.11, or build OpenUSD 26.11 or later.
  • Do not run usdview or usdedit from 26.08 or earlier on files or file names from someone else.
  • If an affected build opened USD files from an untrusted source, treat the machine as you would after running untrusted code. See if your local AI agent was exploited.
  • None of the sources below reports exploitation in the wild.

Prevention

  • Pin usd-core with hashes and check it against Pixar's repository advisory tab, because the advisory database row can be missing. See the package vetting checklist.
  • Treat scene and asset files as untrusted input: .usd, .usdc, .usdz, .blend, glTF with external references.
  • Run converters and agent-driven asset imports in a directory and environment with no credentials. See agent sandboxing.

Sources

  • ZDI-26-791, fetched 2026-11-16: CVE-2026-92211, 7.8 and the vector, USDC and USDZ parsing, the two timeline dates, credit Brandon Evans, link to commit 7c62a43.
  • CVE Services: CVE-2026-92211, fetched 2026-11-16: ZDI CNA, published 2026-11-03, affected v26.03, CVSS 3.0 7.8, two references.
  • Pixar repository advisory GHSA-75r4-2rhh-hrxw, read through the GitHub API (repos/PixarAnimationStudios/OpenUSD/security-advisories) on 2026-11-16: published 2026-10-30, CVE-2026-92211, High 7.8, affected <= 26.08, patched >= 26.11, the versions ZDI tested. The advisory body links a proof-of-concept file, which this file does not link.
  • Pixar repository advisories GHSA-qgc5-vc49-x7jw and GHSA-5hf7-7jmm-gqcf, same API call, 2026-11-16: published 2026-10-30, High, no CVE, the os.system descriptions, commit 05f0191, "fix available in USD 26.11 and onwards".
  • OpenUSD commit 7c62a43, read through the GitHub API on 2026-11-16: dated 2026-09-28, the commit message, pxr/usd/sdf/crateFile.cpp and a malformed-file test.
  • OpenUSD security advisories tab, the page the API call above reads: 13 published advisories on 2026-11-16.
  • PyPI usd-core, queried 2026-11-16: 26.3 on 2026-02-24, 26.5 on 2026-04-24, 26.8 on 2026-07-20, 26.11 on 2026-10-21.
  • GitHub Advisory Database, queried 2026-11-16 through the API: no row for CVE-2026-92211; two rows for usd-core (GHSA-58p5-r2f6-g2cj, GHSA-grjp-54v3-c442).
  • GitHub compare API, 2026-11-16: commit 7c62a43 is an ancestor of tag v26.11.1.
  • Not checked: the contents of the usd-core 26.11 wheel (Pixar's advisory is the source for "patched in 26.11"), and any application that bundles OpenUSD.