TL;DR

Arize Phoenix versions 13.0.0 to before 15.7.0 let anyone who can reach the server read its environment variables through the applyChatTemplate GraphQL query. The endpoint needs no login on a default install. The environment includes PHOENIX_SECRET, which signs session tokens and protects stored provider keys. Upgrade to 15.7.0 or later, then change PHOENIX_SECRET and every key the server held. The fix reached PyPI on 2026-05-13, six months before the CVE record of 2026-11-16.

What happened

The CNA record, published by GitHub on 2026-11-16, says the applyChatTemplate query passed an attacker-controlled F-string template to the server's formatter. A crafted field could walk Python object internals and return process environment variables and module state.

The record says: "The endpoint is unauthenticated on default installations, and any account can reach it when authentication is enabled." It adds that exposure of PHOENIX_SECRET "can allow administrative session-token forgery and decryption of credentials protected by keys derived from that secret."

The vendor advisory text, read through OSV, says the secret protects stored "LLM API keys, OAuth tokens". It includes a proof of concept. This file does not reproduce it.

Dates and versions

Fact Value Source
Vendor advisory published 2026-11-09 vendor page, read 2026-11-18
CNA record published 2026-11-16 CVE Services
Advisory database row 2026-11-17 OSV published
Score 10.0, CVSS:3.1/AV:N/AC:L/PR:N/UI:N/S:C/C:H/I:H/A:L vendor page and CNA record (GitHub), read 2026-11-18
Affected >= 13.0.0, < 15.7.0 CNA record. The vendor page prints >= 13.0.0 and patched v15.7.0
First 13.x release on PyPI 13.0.2, 2026-02-13 PyPI. No 13.0.0 is listed
Fixed release on PyPI 15.7.0, 2026-05-13 PyPI
Newest release on PyPI 21.0.0, 2026-10-30 PyPI, read 2026-11-18

The advisory text names 14.8.0 as the "latest confirmed vulnerable release". The CNA range runs to 15.7.0. Treat every release from 13.0.0 up to 15.7.0 as affected.

Scanners keyed on CVE ids began to flag this on 2026-11-16 or 11-17. A server that ran an affected version between February and its upgrade was exposed for that whole period with no advisory.

Am I affected?

pip show arize-phoenix 2>/dev/null | grep -i '^version'
pip freeze 2>/dev/null | grep -i '^arize-phoenix'
grep -rnE 'arize-phoenix' requirements*.txt pyproject.toml uv.lock poetry.lock 2>/dev/null

A version from 13.0.0 up to, but not including, 15.7.0 is affected. For a container deployment, check the image tag against the same range.

Exposure depends on who can reach the server. A Phoenix server on the public internet, or on a shared network, with an affected version should be treated as read.

If you are affected

  • Upgrade to 15.7.0 or later. The newest release when read was 21.0.0.
  • Set a new PHOENIX_SECRET. The old value lets a holder forge administrator sessions after the upgrade.
  • Rotate every LLM provider key and OAuth token stored in Phoenix, and every secret in the server's environment.
  • Review provider usage for the period the affected version ran.
  • See rotating cloud credentials.

Prevention

  • Do not expose an observability server to the internet. Put it behind a private network or an authenticating proxy.
  • Turn authentication on. The default install has none.
  • Keep provider keys out of the process environment of tools that do not need them. See credential hygiene.

Sources