mcp-gateway-registry before 1.35.0: a user who can register a server makes the gateway fetch internal addresses (CVE-2026-125926)
TL;DR #
mcp-gateway-registry 1.0.3 through 1.34.0 does not validate the upstream address of a registered MCP server. An authenticated user who can register or modify a server can point it at an internal service, and the gateway sends requests there and in some cases returns the responses. AWS names cloud instance metadata and the credentials it provides as what can be exposed. Version 1.35.0 fixes it for servers registered or modified after the upgrade. Stored server entries are not changed, so upgrade and then review them. CVE-2026-125926.
What happened #
AWS published bulletin 2026-180-AWS and the repository advisory GHSA-fc39-fwh3-wv5r on 2026-11-11. The AWS CNA record was published the same day and updated on 2026-11-13.
| Fact | Value | Source |
|---|---|---|
| Affected | 1.0.3 through 1.34.0, inclusive | bulletin, advisory, CNA record |
| Fixed | 1.35.0 | bulletin, advisory, CNA record |
| Who can exploit it | an authenticated user with permission to register or modify a server | bulletin |
| CVSS 3.1 | 8.5, AV:N/AC:L/PR:L/UI:N/S:C/C:H/I:L/A:N |
AWS as CNA, and the advisory page |
| CVSS 4.0 | 6.3, AV:N/AC:L/AT:N/PR:L/UI:N/VC:N/VI:N/VA:N/SC:H/SI:L/SA:N |
AWS as CNA |
| Credit | an external researcher under the handle novice-22 | bulletin |
severity is high on the 8.5 score and on what the bulletin says can be reached. The 4.0 score is lower because it counts the impact on other systems only.
What an upgrade alone gives you. The advisory says 1.35.0 validates upstream addresses when a server is registered or modified. It does not alter entries stored before the upgrade. An entry planted earlier keeps working until someone reviews it.
A separate earlier fix. The advisory notes that an unrelated issue in the external management API was fixed in 1.25.0. A deployment on 1.25.0 or later still needs 1.35.0 for this one.
Distribution. pip index versions mcp-gateway-registry returned no matching distribution on 2026-11-16. The CNA record references a 1.35.0 release tag on the repository. That release page was not opened in this run.
No report of exploitation was found. The id is in The Hacker News weekly recap's CVE list of 2026-11-16.
Am I affected? #
- You run mcp-gateway-registry at a version from 1.0.3 through 1.34.0.
- More than a small set of trusted accounts can register or modify servers.
- The registry or auth-server component can reach internal services, or runs with a cloud role attached.
If you are affected #
- Upgrade to 1.35.0 or later.
- Review every registered server's upstream address. Correct or remove any you did not intend. The advisory lists this as a required step after the upgrade.
- Review logs from the affected period for unexpected server registrations or changes.
- If the registry has a cloud role attached and the log review cannot rule out unexpected activity, review that role's activity and rotate its credentials. See playbooks/rotating-cloud-credentials.md.
If you cannot upgrade yet, the bulletin's workarounds are: limit the permission to register and modify servers to trusted accounts, restrict outbound network access from the registry and auth-server to the destinations they need, and on Amazon EC2 require IMDSv2 with a least-privilege role. The bulletin says these do not replace the steps above.
Prevention #
- Treat an MCP gateway as a server-side fetcher that users steer. Give it an egress allowlist.
- Keep the gateway's cloud role minimal. See prevention/mcp-hygiene.md and playbooks/if-an-mcp-server-was-malicious.md.
Sources #
Single source: the vendor, through three records.
- AWS security bulletin 2026-180-AWS, 2026-11-11, fetched 2026-11-16: the description, range, fix, workarounds, credit.
- GHSA-fc39-fwh3-wv5r on the repository, 2026-11-11, fetched 2026-11-16: the 8.5 score, the post-upgrade steps, the 1.25.0 note.
- CVE-2026-125926 (AWS CNA), published 2026-11-11, updated 2026-11-13, fetched 2026-11-16: both scores, the affected entry, the references.
- The Hacker News weekly recap, 2026-11-16, fetched 2026-11-16: the id in the CVE list.