TL;DR

CVE-2026-130766 says Obot 0.26.0 lets a malicious remote MCP server obtain a user's access token for a different service. Four more records cover SSRF, command injection and an open redirect in older versions. All are fixed in 0.27.0. The vendor advisories are dated 2026-10-31 and the CVE ids arrived on 2026-11-18. A separate record covers SQL injection in the mssql-mcp packages.

Obot

Obot is a platform for running and connecting to MCP servers. VulnCheck published five records on 2026-11-18. Each references a vendor advisory that the vendor's tab dates 2026-10-31. Scores are VulnCheck's.

CVE Vendor advisory What the record says Affected CVSS 4.0 / 3.1
CVE-2026-130766 GHSA-x3hf-v55x-jcp6 a remote MCP server names a different service in its resource metadata, and Obot fetches the victim's token for that service and forwards it 0.26.0 before 0.27.0 8.8 / 8.0
CVE-2026-130764 GHSA-57qx-69p6-3w3g a Power User points the OAuth token endpoint at internal hosts or cloud metadata services and reads error bodies 0.8.0 before 0.27.0 8.3 / 7.6
CVE-2026-130767 GHSA-2mfp-9vv3-q737 an authenticated user runs shell commands through file-type MCP server configuration values 0.9.0 before 0.27.0 5.3 / 6.4
CVE-2026-130768 GHSA-r3m3-5rmh-h3fm a Power User bypasses outbound address checks to probe internal services 0.14.0 before 0.27.0 5.1 / 4.1
CVE-2026-130765 GHSA-cv8w-jqg2-jg55 an unauthenticated open redirect on sign-in and sign-out links before 0.27.0 5.3 / 4.7

Notes on the table:

  • The vendor tab rates the first two High and the other three Moderate.
  • The token theft record has UI:P in its vector. A user has to connect to the attacker's MCP server.
  • The 0.27.0 release notes, as read through a truncated page, include "fix: reject protected resource metadata for a different origin".
  • The releases page showed v0.28.1 as latest on 2026-11-19. The 0.27.0 release date was not read.

The tab's first page holds five more advisories from 2026-09-17 to 2026-10-07 that have no file here and no CVE in the sources read:

  • GHSA-6fwv-3h4c-37j9, High, an authorization bypass on /mcp-connect-composite/.
  • GHSA-2qcm-3gv6-2mfc, High, "CLI login flow could be used to steal another user's API key".
  • GHSA-929v-v9hq-5xhr, GHSA-xhpw-65qw-wj6m and GHSA-q5wf-87f5-cxgq, Moderate.

Their fixed versions were not read. Page 2 of the tab was not opened.

mssql-mcp-core

CVE-2026-63129 was published by GitHub's CNA on 2026-11-18 and scores 8.8 (CVSS 3.1, PR:L). The record says several write tools build T-SQL from caller-supplied table names, columns and a free-form whereClause. It also says row-count and preview queries run before confirmUpdate or confirmDelete is checked.

Package Fixed in, per the record On npm Newest on npm, read 2026-11-19
@connorbritain/mssql-mcp-core 0.6.0 2026-06-29 0.7.0
@connorbritain/mssql-mcp-server 0.6.0 2026-06-29 0.7.0
@connorbritain/mssql-mcp-reader 0.5.0 2026-06-29 0.6.1
@connorbritain/mssql-mcp-writer 0.5.0 2026-06-29 0.6.0

The fixed versions were on npm on 2026-06-29, before the record's 2026-11-18 date. The record says malicious arguments bypass the confirmation step.

Am I affected?

npm ls @connorbritain/mssql-mcp-core @connorbritain/mssql-mcp-server @connorbritain/mssql-mcp-reader @connorbritain/mssql-mcp-writer 2>/dev/null
  • Obot. Check the version of the running deployment. Anything before 0.27.0 is affected by at least one id. Only 0.26.x is affected by the token theft bug.
  • mssql-mcp. Core or server below 0.6.0, reader or writer below 0.5.0.

If you are affected

  • Obot. Upgrade to the current release. Review the remote MCP servers users have added, and revoke OAuth grants made through any server you do not recognise.
  • mssql-mcp. Upgrade to the newest versions. Give the server a database login that can only do what the tools should do.
  • See if an MCP server was malicious.

Prevention

  • Limit who can add remote MCP servers to a shared platform. Three of the five Obot records need a Power User or an authenticated user.
  • A database MCP server's safety comes from the database login's permissions, not from tool-level confirmation. See MCP hygiene.

Sources