Pomerium 0.30.0 to below 0.34.0: MCP token endpoint skips the secret check for client_secret_basic clients (CVE-2026-135300); fixed in 0.34.0
TL;DR #
Pomerium 0.30.0 to below 0.34.0 does not check the client secret at its MCP token endpoint for client_secret_basic clients, per CVE-2026-135300. An attacker who already holds a victim's intercepted authorization code or refresh token can redeem it with any secret and get the victim's access tokens. Fixed in 0.34.0, tagged 2026-11-04. The upgrade is a breaking change for some MCP clients.
What happened #
The record names Pomerium's MCP token endpoint.
VulnCheck published the record on 2026-11-23 and credits Theodoros Lampropoulos. The record's public date is 2026-09-18. It scores the flaw 9.1 on CVSS 4.0, AV:N/AC:H/AT:P/PR:N/UI:N/VC:H/VI:H/VA:N/SC:N/SI:N/SA:N. This file rates it high. The record's own description requires an intercepted code or token first, and its vector marks attack complexity high.
The v0.34.0 release notes list the fix under breaking changes as "mcp: verify the client secret for client_secret_basic" (pull request 6787). The notes carry no CVE or advisory id. The Go module proxy dates v0.34.0 at 2026-11-04 and lists v0.34.1 as the newest version on 2026-11-24.
Am I affected? #
- You run Pomerium 0.30.0 to below 0.34.0 and route MCP clients through it.
- The record names clients that authenticate with
client_secret_basic. - The endpoint is
/.pomerium/mcp/token.
Check the version of the binary or the image tag you deploy.
If you are affected #
- Upgrade to 0.34.0 or later.
- Test MCP clients after the upgrade. The release notes say clients with no
token_endpoint_auth_methodset now receiveinvalid_clientunless they send their secret. - If authorization codes or refresh tokens could have leaked through logs, a proxy or a shared machine, revoke the sessions and have users sign in again. This step is this file's advice.
Prevention #
- Keep authorization codes and refresh tokens out of logs and URLs that other systems store.
- See MCP hygiene and credential hygiene.
Sources #
- CVE-2026-135300: CNA VulnCheck, published 2026-11-23. Description, range, score and vector, references.
- VulnCheck advisory, read 2026-11-24: credit, fixed version.
- Pomerium v0.34.0 release notes, read 2026-11-24: the breaking-change entry and the client behaviour after upgrade.
proxy.golang.orgforgithub.com/pomerium/pomerium, read 2026-11-24: v0.34.0 time and the version list.- Not opened: pull request 6787, the fix commit and Pomerium's own advisory tab. OSV has a record under the CVE id and none under the database row's GHSA id on 2026-11-24.