Aalo Atomics

Developer of the Aalo Critical Test Reactor and the planned 10 MWe Project Ascension power reactor.

Reactor developer and DOE-authorized operator

Deployment stage7 / 8Operational

Race position

Megawatts at their strongest documented state, as of 2026-08-06.

DesignAalo-X
Per unit10 MWe
LaneMicroreactor
ListingPrivate

30 MWt. The commercial Aalo Pod bundles units into a 50 MWe plant.

Announced framework on record, capacity not disclosed

No executed megawatts · announced pipeline only

One gigawatt is 100 × 10 MWe units. No megawatts rest on an executed action yet.

Why this company is on the board: Reached DOE-authorized criticality with its Critical Test Reactor at Idaho National Laboratory, the fourth and last before the July 4 2026 goal. Source ↗

Funding

Three frames, never added together.

Raised

Private and public equity. Never added to federal money.

  • 2025-08$100M Series BVenture equity · Valor Equity Partners (lead), NRG Energy, Hitachi VenturesSource ↗

Awarded

Federal awards and cost share. A ceiling, not cash received.

No awarded money on record.

Borrowed

Debt, repayable. Never counted as a raise, federal or private.

No borrowed money on record.

Filed, not raised

A registration filed with the SEC. The filing itself raises nothing.

No filed, not raised money on record.

Cash on hand

A balance, not a raise. Reported by the company at a stated date.

No reported cash position on record.

Licensing

Applications, permits and authorizations, naming the authority in each case.

Nothing on record in this lane as of 2026-08-06.

Physical progress

Work at a site. Criticalities are proof the physics works, not electricity.

Program selections and agreements

Being chosen for a program, or signing one. Neither is a permit nor work at a site.

Design proof outside the U.S.

Real progress on the same design abroad. Contributes 0 MWe to the U.S. race.

Nothing on record in this lane as of 2026-08-06.

Pipeline

Executed first. Announcements are labeled as announcements and never added to them.

Backed by an executed action

No executed megawatts on record as of 2026-08-06.

Announced, non-binding

Company-stated targets

What the company says, printed beside what a regulator has documented. The site never averages a target into a prediction.