Companies
Reactor developers, site sponsors, operators, and delivery partners linked to tracked U.S. projects.
TerraPower
Lead developer of the Natrium demonstration project at Kemmerer, Wyoming.
2 tracked projects · Sodium-cooled fast reactorKairos Power
Developer of the Hermes 2 low-power test reactors in Oak Ridge, Tennessee.
1 tracked project · Fluoride salt-cooled high-temperature reactorX-energy
Technology developer for the Xe-100 project under review at Dow's Seadrift site in Texas.
1 tracked project · High-temperature gas-cooled reactorBWXT
Prime industrial partner delivering the Project Pele transportable microreactor for the Department of Defense.
1 tracked project · Transportable high-temperature gas reactorRadiant Industries
Developer of the Kaleidos experiment conditionally selected for testing in the DOME facility.
2 tracked projects · Gas-cooled microreactorValar Atomics
Developer of the Ward 250 zero-power critical experiment in Utah.
1 tracked project · Zero-power critical experimentAalo Atomics
Developer of the Aalo Critical Test Reactor and the planned 10 MWe Project Ascension power reactor.
1 tracked project · Sodium-cooled modular reactorAntares Nuclear
Developer of the Mark-0 zero-power experiment, the first Reactor Pilot Program project to report criticality.
1 tracked project · High-temperature heat-pipe microreactorAtomic Alchemy
Developer of the Groves pilot project in Caldwell County, Texas.
1 tracked project · Test and isotope-production reactorDeep Fission
Developer of a deep-borehole test reactor selected for DOE's pilot pathway.
1 tracked project · Deep-borehole reactorLast Energy
Developer of the PWR-5 pilot project at Texas A&M's RELLIS campus.
1 tracked project · Small pressurized-water reactorOklo
Developer of the Aurora and Pluto pilot projects selected by DOE.
2 tracked projects · Fast microreactorsNatura Resources
Developer of the university-based pilot project at Abilene Christian University.
1 tracked project · Molten-salt research reactorTerrestrial Energy
Developer of the TETRA-1 pilot project at Texas A&M's RELLIS campus.
1 tracked project · Molten-salt reactorDeployable Energy
Developer of the Unity zero-power experiment authorized through NRIC's Nuclear Energy Launch Pad.
1 tracked project · Microreactor experimentTexas A&M University System
Sponsor of the multi-reactor RELLIS campus site now in NRC pre-application engagement.
1 tracked project · Multi-design advanced-reactor siteTennessee Valley Authority
Applicant for the first U.S. utility-led BWRX-300 construction permit at Clinch River.
1 tracked project · Gen III+ BWRX-300 SMRHoltec International
Developer of the dual-unit Pioneer SMR-300 project at the Palisades Energy Center.
1 tracked project · Gen III+ pressurized-water SMRWestinghouse
Developer of the eVinci DOME experiment and AP1000 technology delivered at Vogtle.
2 tracked projects · Heat-pipe microreactor and AP1000 PWRNANO Nuclear Energy
Technology provider for the UIUC KRONOS research-reactor construction-permit application.
1 tracked project · High-temperature gas-cooled microreactorDuke Energy
Applicant for the Belews Creek early site permit in North Carolina.
1 tracked project · Advanced-reactor site; design not selectedConstellation Energy
Leads the Crane restart and a DOE-backed New York Gen III+ SMR siting effort.
2 tracked projects · Existing large PWR and future Gen III+ SMRNebraska Public Power District
DOE-selected applicant for a future Nebraska Gen III+ SMR early site permit.
1 tracked project · Gen III+ light-water SMR; design not selectedGeorgia Power
Largest owner of Vogtle Units 3 and 4, the first two U.S. AP1000 units in commercial operation.
1 tracked project · Gen III+ AP1000 pressurized-water reactorNuScale Power
Holds the only NRC-approved U.S. SMR design; ENTRA1 Energy is its exclusive commercial partner for plant development.
0 tracked projects · Integral pressurized-water SMRGE Vernova Hitachi
Developer of the BWRX-300, the design under NRC construction-permit review at TVA's Clinch River site and under construction at Darlington, Ontario.
0 tracked projects · Boiling-water SMR