TerraPower

Lead developer of the Natrium demonstration project at Kemmerer, Wyoming.

Reactor developer and project sponsor

Deployment stage6 / 8Physical

Race position

Megawatts at their strongest documented state, as of 2026-08-06.

DesignNatrium
Per unit345 MWe
LaneGrid-scale SMR
ListingPrivate

Up to 500 MWe for 5+ hours with the molten-salt storage boost.

3,490 MWe announced, non-binding, runs past the line

Nuclear construction · 345 MWe

One gigawatt is 3 × 345 MWe units. 345 MWe rest on an executed action, 35% of the way there.

Why this company is on the board: NRC construction permit issued for Kemmerer Unit 1 and construction underway in Wyoming. Source ↗

Funding

Three frames, never added together.

Raised

Private and public equity. Never added to federal money.

  • 2025-06$650M roundVenture equity · NVentures (NVIDIA), Bill Gates, HD HyundaiSource ↗
  • 2022-08$750M minimum equity raiseVenture equity · SK Inc. and SK InnovationSource ↗

Awarded

Federal awards and cost share. A ceiling, not cash received.

  • Date not statedUp to $2B DOE ceiling, 50% of project costsCost share · DOE Advanced Reactor Demonstration ProgramSource ↗

Borrowed

Debt, repayable. Never counted as a raise, federal or private.

No borrowed money on record.

Filed, not raised

A registration filed with the SEC. The filing itself raises nothing.

No filed, not raised money on record.

Cash on hand

A balance, not a raise. Reported by the company at a stated date.

No reported cash position on record.

Licensing

Applications, permits and authorizations, naming the authority in each case.

Physical progress

Work at a site. Criticalities are proof the physics works, not electricity.

Program selections and agreements

Being chosen for a program, or signing one. Neither is a permit nor work at a site.

Nothing on record in this lane as of 2026-08-06.

Design proof outside the U.S.

Real progress on the same design abroad. Contributes 0 MWe to the U.S. race.

Nothing on record in this lane as of 2026-08-06.

Pipeline

Executed first. Announcements are labeled as announcements and never added to them.

Backed by an executed action

Announced, non-binding

Company-stated targets

What the company says, printed beside what a regulator has documented. The site never averages a target into a prediction.