Lead developer of the Natrium demonstration project at Kemmerer, Wyoming.
Megawatts at their strongest documented state, as of 2026-08-06.
Up to 500 MWe for 5+ hours with the molten-salt storage boost.
Nuclear construction · 345 MWe
One gigawatt is 3 × 345 MWe units. 345 MWe rest on an executed action, 35% of the way there.
Why this company is on the board: NRC construction permit issued for Kemmerer Unit 1 and construction underway in Wyoming. Source ↗
Three frames, never added together.
Private and public equity. Never added to federal money.
Federal awards and cost share. A ceiling, not cash received.
Debt, repayable. Never counted as a raise, federal or private.
No borrowed money on record.
A registration filed with the SEC. The filing itself raises nothing.
No filed, not raised money on record.
A balance, not a raise. Reported by the company at a stated date.
No reported cash position on record.
Applications, permits and authorizations, naming the authority in each case.
Work at a site. Criticalities are proof the physics works, not electricity.
Being chosen for a program, or signing one. Neither is a permit nor work at a site.
Nothing on record in this lane as of 2026-08-06.
Real progress on the same design abroad. Contributes 0 MWe to the U.S. race.
Nothing on record in this lane as of 2026-08-06.
Executed first. Announcements are labeled as announcements and never added to them.
What the company says, printed beside what a regulator has documented. The site never averages a target into a prediction.
CurrentNRC issued construction permit CPAR-1; DOE later reported groundbreaking for the nuclear island.
Next stepSubmit and secure the separate NRC operating license before fuel loading or operation.Idaho National LaboratoryCurrentINL produced the first of an expected 72–75 fuel-salt batches required for criticality.
Next stepComplete fuel production, install the experiment in LOTUS, obtain authorization, and begin the planned test campaign.