Molten Chloride Reactor Experiment

A fast-spectrum, salt-fueled experiment intended to inform commercial molten-chloride reactor deployment.

Idaho National Laboratory · Government-reported

Lead company · TerraPower →

Program · MCRE · LOTUS

Fuel production underwayHigh confidence
Deployment stage6 / 8Physical

Deployment trajectory

1Interest
2Preliminary
3Development
4Contractual
5Ready
6Physical
7Operational
8Replication

Latest milestone

INL produced the first of an expected 72–75 fuel-salt batches required for criticality.

2025-12 · DOE MCRE fuel milestone

Open primary source ↗

Next milestone

Complete fuel production, install the experiment in LOTUS, obtain authorization, and begin the planned test campaign.

Responsible
INL, Southern Company, TerraPower, and DOE
Key blocker
Fuel-salt production, facility integration, authorization, and 2028 test readiness
GenerationGen IV
ScaleTest reactor
Reactor familyMSR
RoleResearch / test
CapacityNon-power experiment
Reporting basisGovernment-reported