Kairos Power

Developer of the Hermes 2 low-power test reactors in Oak Ridge, Tennessee.

Reactor developer and test-reactor licensee

Deployment stage6 / 8Physical

Race position

Megawatts at their strongest documented state, as of 2026-08-06.

DesignKP-FHR
Per unit140 MWe
LaneGrid-scale SMR
ListingPrivate

Commercial product rating. Hermes 2 is a ~20 MWe demonstration plant.

480 MWe announced, non-binding

Nuclear construction · 20 MWe

One gigawatt is 8 × 140 MWe units. 20 MWe rest on an executed action, 2% of the way there.

Why this company is on the board: Hermes 2 holds the first NRC construction permit for a power-producing Gen IV reactor and is under construction. Source ↗

Funding

Three frames, never added together.

Raised

Private and public equity. Never added to federal money.

No raised money on record.

Awarded

Federal awards and cost share. A ceiling, not cash received.

  • 2026-02$27M agreementFederal award · Oak Ridge National LaboratorySource ↗
  • 2024-02Up to $303M of a $629M project, milestone-basedCost share · DOE Advanced Reactor Demonstration ProgramSource ↗

Borrowed

Debt, repayable. Never counted as a raise, federal or private.

No borrowed money on record.

Filed, not raised

A registration filed with the SEC. The filing itself raises nothing.

No filed, not raised money on record.

Cash on hand

A balance, not a raise. Reported by the company at a stated date.

No reported cash position on record.

Licensing

Applications, permits and authorizations, naming the authority in each case.

Physical progress

Work at a site. Criticalities are proof the physics works, not electricity.

Program selections and agreements

Being chosen for a program, or signing one. Neither is a permit nor work at a site.

Nothing on record in this lane as of 2026-08-06.

Design proof outside the U.S.

Real progress on the same design abroad. Contributes 0 MWe to the U.S. race.

Nothing on record in this lane as of 2026-08-06.

Pipeline

Executed first. Announcements are labeled as announcements and never added to them.

Backed by an executed action

Announced, non-binding

Company-stated targets

What the company says, printed beside what a regulator has documented. The site never averages a target into a prediction.

TechnologyFluoride salt-cooled high-temperature reactor
Reactor classesGen IV · Test reactor
Tracked projects1
Highest deployment stage6 · Physical
Primary sourceNRC Hermes 2 record ↗

Projects and next steps

1 tracked