NuScale Power

Holds the only NRC-approved U.S. SMR design; ENTRA1 Energy is its exclusive commercial partner for plant development.

Reactor technology provider

Race position

Megawatts at their strongest documented state, as of 2026-08-06.

DesignNuScale Power Module / VOYGR
Per unit77 MWe
LaneGrid-scale SMR
ListingNYSE: SMR

The earlier certified design was 50 MWe. A six-module VOYGR-6 plant is 462 MWe.

6,000 MWe announced, non-binding, runs past the line

No executed megawatts · announced pipeline only

One gigawatt is 13 × 77 MWe units. No megawatts rest on an executed action yet.

Why this company is on the board: Holds the only NRC-approved SMR design in the United States, a standard design approval for the 77 MWe module. Source ↗

Funding

Three frames, never added together.

Raised

Private and public equity. Never added to federal money.

  • 2022-05~$380M proceeds including a $235M PIPEIPO / listing · Spring Valley Acquisition Corp (NYSE)Source ↗

Awarded

Federal awards and cost share. A ceiling, not cash received.

No awarded money on record.

Borrowed

Debt, repayable. Never counted as a raise, federal or private.

No borrowed money on record.

Filed, not raised

A registration filed with the SEC. The filing itself raises nothing.

No filed, not raised money on record.

Cash on hand

A balance, not a raise. Reported by the company at a stated date.

  • 2026-03-31$1.0B cash, equivalents and investmentsSource ↗

Licensing

Applications, permits and authorizations, naming the authority in each case.

Physical progress

Work at a site. Criticalities are proof the physics works, not electricity.

Nothing on record in this lane as of 2026-08-06.

Program selections and agreements

Being chosen for a program, or signing one. Neither is a permit nor work at a site.

Nothing on record in this lane as of 2026-08-06.

Design proof outside the U.S.

Real progress on the same design abroad. Contributes 0 MWe to the U.S. race.

Pipeline

Executed first. Announcements are labeled as announcements and never added to them.

Backed by an executed action

No executed megawatts on record as of 2026-08-06.

Announced, non-binding

Company-stated targets

What the company says, printed beside what a regulator has documented. The site never averages a target into a prediction.

TechnologyIntegral pressurized-water SMR
Reactor classesNo tracked project records
Tracked projects0
Highest deployment stageNo tracked project records
Primary sourceDOE record of the 77 MWe design approval ↗

Projects and next steps

0 tracked

No project record is tracked for this company yet. It appears on the race board through the roster rule rather than through a sited project.