Oklo

Developer of the Aurora and Pluto pilot projects selected by DOE.

Fast-reactor and fuel-cycle developer

Deployment stage3 / 8Development

Race position

Megawatts at their strongest documented state, as of 2026-08-06.

DesignAurora
Per unit75 MWe
LaneGrid-scale SMR
ListingNYSE: OKLO

Design scaled from 15 MWe through 50 MWe to a current 75 MWe maximum.

13,755 MWe announced, non-binding, runs past the line

DOE-authorized build · 75 MWe

One gigawatt is 14 × 75 MWe units. 75 MWe rest on an executed action, 8% of the way there.

Why this company is on the board: Aurora-INL under construction under the DOE Reactor Pilot Program, with a combined license application submitted to the NRC. Source ↗

Funding

Three frames, never added together.

Raised

Private and public equity. Never added to federal money.

  • 2026-05Up to $1B at-the-market program, replacing a prior program that placed ~$1.5B grossPublic offering · Public marketsSource ↗
  • 2024-05Up to $645M cash from the combination, including a $300M PIPEIPO / listing · AltC Acquisition Corp (NYSE)Source ↗

Awarded

Federal awards and cost share. A ceiling, not cash received.

No awarded money on record.

Borrowed

Debt, repayable. Never counted as a raise, federal or private.

No borrowed money on record.

Filed, not raised

A registration filed with the SEC. The filing itself raises nothing.

No filed, not raised money on record.

Cash on hand

A balance, not a raise. Reported by the company at a stated date.

  • 2026-03-31~$2.5B cash and marketable securities, no debtSource ↗

Licensing

Applications, permits and authorizations, naming the authority in each case.

Physical progress

Work at a site. Criticalities are proof the physics works, not electricity.

Program selections and agreements

Being chosen for a program, or signing one. Neither is a permit nor work at a site.

Nothing on record in this lane as of 2026-08-06.

Design proof outside the U.S.

Real progress on the same design abroad. Contributes 0 MWe to the U.S. race.

Nothing on record in this lane as of 2026-08-06.

Pipeline

Executed first. Announcements are labeled as announcements and never added to them.

Backed by an executed action

Announced, non-binding

Company-stated targets

What the company says, printed beside what a regulator has documented. The site never averages a target into a prediction.