NANO Nuclear Energy

Technology provider for the UIUC KRONOS research-reactor construction-permit application.

Microreactor technology developer

Deployment stage3 / 8Development

Race position

Megawatts at their strongest documented state, as of 2026-08-06.

DesignKRONOS MMR
Per unit15 MWe
LaneMicroreactor
ListingNasdaq: NNE

Rated up to 45 MWt.

No announced pipeline on record

No executed or announced megawatts on record

One gigawatt is 67 × 15 MWe units. No megawatts rest on an executed action yet.

Why this company is on the board: NRC accepted the KRONOS construction-permit application for the University of Illinois site. Source ↗

Funding

Three frames, never added together.

Raised

Private and public equity. Never added to federal money.

No raised money on record.

Awarded

Federal awards and cost share. A ceiling, not cash received.

  • 2025-09~$1.25M AFWERX Direct-to-Phase-II contract, a feasibility study rather than a unit orderFederal award · U.S. Air ForceSource ↗

Borrowed

Debt, repayable. Never counted as a raise, federal or private.

No borrowed money on record.

Filed, not raised

A registration filed with the SEC. The filing itself raises nothing.

No filed, not raised money on record.

Cash on hand

A balance, not a raise. Reported by the company at a stated date.

  • 2026-03-31$568.7M cash and short-term investmentsSource ↗

Licensing

Applications, permits and authorizations, naming the authority in each case.

Physical progress

Work at a site. Criticalities are proof the physics works, not electricity.

Nothing on record in this lane as of 2026-08-06.

Program selections and agreements

Being chosen for a program, or signing one. Neither is a permit nor work at a site.

Nothing on record in this lane as of 2026-08-06.

Design proof outside the U.S.

Real progress on the same design abroad. Contributes 0 MWe to the U.S. race.

Nothing on record in this lane as of 2026-08-06.

Pipeline

Executed first. Announcements are labeled as announcements and never added to them.

Backed by an executed action

No executed megawatts on record as of 2026-08-06.

Announced, non-binding

No announced pipeline on record as of 2026-08-06.

Company-stated targets

What the company says, printed beside what a regulator has documented. The site never averages a target into a prediction.

TechnologyHigh-temperature gas-cooled microreactor
Reactor classesExperimental / unclassified · Microreactor
Tracked projects1
Highest deployment stage3 · Development
Primary sourceNRC KRONOS application record ↗

Projects and next steps

1 tracked