Valar Atomics

Developer of the Ward 250 zero-power critical experiment in Utah.

Reactor developer

Deployment stage7 / 8Operational

Race position

Megawatts at their strongest documented state, as of 2026-08-06.

DesignWard 250
Per unit5 MWe
LaneMicroreactor
ListingPrivate

Commercial scale-up target. The Utah test unit ran at 100 kWt.

30 MWe announced, non-binding

No executed megawatts · announced pipeline only

One gigawatt is 200 × 5 MWe units. No megawatts rest on an executed action yet.

Why this company is on the board: Reached DOE-authorized criticality in Utah, the only pilot reactor built outside a national laboratory. Source ↗

Funding

Three frames, never added together.

Raised

Private and public equity. Never added to federal money.

  • 2026-08$1B Series B at a $6B valuationVenture equity · Sequoia Capital (lead)Source ↗
  • 2026-03$340M equity within a $450M round at a $2B valuationVenture equity · Not disclosedSource ↗
  • 2025-11$130M Series AVenture equity · Not disclosedSource ↗

Awarded

Federal awards and cost share. A ceiling, not cash received.

No awarded money on record.

Borrowed

Debt, repayable. Never counted as a raise, federal or private.

  • 2026-08$200M credit facility, announced alongside the Series BVenture debt · Erebor Bank (lead), J.P. Morgan, Crescent Cove, Hercules CapitalSource ↗
  • 2026-03$110M debt within the same $450M roundVenture debt · Not disclosedSource ↗

Filed, not raised

A registration filed with the SEC. The filing itself raises nothing.

No filed, not raised money on record.

Cash on hand

A balance, not a raise. Reported by the company at a stated date.

No reported cash position on record.

Licensing

Applications, permits and authorizations, naming the authority in each case.

Physical progress

Work at a site. Criticalities are proof the physics works, not electricity.

Program selections and agreements

Being chosen for a program, or signing one. Neither is a permit nor work at a site.

Nothing on record in this lane as of 2026-08-06.

Design proof outside the U.S.

Real progress on the same design abroad. Contributes 0 MWe to the U.S. race.

Nothing on record in this lane as of 2026-08-06.

Pipeline

Executed first. Announcements are labeled as announcements and never added to them.

Backed by an executed action

No executed megawatts on record as of 2026-08-06.

Announced, non-binding

Company-stated targets

What the company says, printed beside what a regulator has documented. The site never averages a target into a prediction.

No company-stated target on record as of 2026-08-06.

TechnologyZero-power critical experiment
Reactor classesExperimental / unclassified · Critical experiment
Tracked projects1
Highest deployment stage7 · Operational
Primary sourceDOE criticality announcement

Projects and next steps

1 tracked