Raised
Private and public equity. Never added to federal money.
- Date not stated~$1.7M raised to date alongside substantial founder self-fundingVenture equity · Blue Corridor Ventures, Capital Factory, Nucleation CapitalSource ↗
Developer of the Unity zero-power experiment authorized through NRIC's Nuclear Energy Launch Pad.
Megawatts at their strongest documented state, as of 2026-08-06.
No executed or announced megawatts on record
One gigawatt is 1000 × 1 MWe units. No megawatts rest on an executed action yet.
Why this company is on the board: Reached DOE-authorized criticality with the Unity reactor at Idaho National Laboratory. Source ↗
Three frames, never added together.
Private and public equity. Never added to federal money.
Federal awards and cost share. A ceiling, not cash received.
No awarded money on record.
Debt, repayable. Never counted as a raise, federal or private.
No borrowed money on record.
A registration filed with the SEC. The filing itself raises nothing.
No filed, not raised money on record.
A balance, not a raise. Reported by the company at a stated date.
No reported cash position on record.
Applications, permits and authorizations, naming the authority in each case.
Nothing on record in this lane as of 2026-08-06.
Work at a site. Criticalities are proof the physics works, not electricity.
Being chosen for a program, or signing one. Neither is a permit nor work at a site.
Real progress on the same design abroad. Contributes 0 MWe to the U.S. race.
Nothing on record in this lane as of 2026-08-06.
Executed first. Announcements are labeled as announcements and never added to them.
No executed megawatts on record as of 2026-08-06.
No announced pipeline on record as of 2026-08-06.
What the company says, printed beside what a regulator has documented. The site never averages a target into a prediction.
No company-stated target on record as of 2026-08-06.