BWXT

Prime industrial partner delivering the Project Pele transportable microreactor for the Department of Defense.

Reactor manufacturer and delivery contractor

Deployment stage6 / 8Physical

Race position

Megawatts at their strongest documented state, as of 2026-08-06.

DesignProject Pele / BANR
Per unit1.5 MWe
LaneMicroreactor
ListingNYSE: BWXT

The Pele demonstration unit is rated 1.5 MWe against a 1–5 MWe program target. BANR is 75 MWt.

Announced framework on record, capacity not disclosed

No executed megawatts · announced pipeline only

One gigawatt is 667 × 1.5 MWe units. No megawatts rest on an executed action yet.

Why this company is on the board: Prime contractor building the Project Pele transportable microreactor for the Department of Defense at INL. Source ↗

Funding

Three frames, never added together.

Raised

Private and public equity. Never added to federal money.

No raised money on record.

Awarded

Federal awards and cost share. A ceiling, not cash received.

  • 2020-12Share of a $30M DOE risk-reduction award split across five companiesCost share · DOE Advanced Reactor Demonstration ProgramSource ↗

Borrowed

Debt, repayable. Never counted as a raise, federal or private.

No borrowed money on record.

Filed, not raised

A registration filed with the SEC. The filing itself raises nothing.

No filed, not raised money on record.

Cash on hand

A balance, not a raise. Reported by the company at a stated date.

No reported cash position on record.

Licensing

Applications, permits and authorizations, naming the authority in each case.

Nothing on record in this lane as of 2026-08-06.

Physical progress

Work at a site. Criticalities are proof the physics works, not electricity.

Program selections and agreements

Being chosen for a program, or signing one. Neither is a permit nor work at a site.

Nothing on record in this lane as of 2026-08-06.

Design proof outside the U.S.

Real progress on the same design abroad. Contributes 0 MWe to the U.S. race.

Nothing on record in this lane as of 2026-08-06.

Pipeline

Executed first. Announcements are labeled as announcements and never added to them.

Backed by an executed action

No executed megawatts on record as of 2026-08-06.

Announced, non-binding

Company-stated targets

What the company says, printed beside what a regulator has documented. The site never averages a target into a prediction.

TechnologyTransportable high-temperature gas reactor
Reactor classesGen IV · Microreactor
Tracked projects1
Highest deployment stage6 · Physical
Primary sourceDOE Project Pele update ↗

Projects and next steps

1 tracked