Antares Nuclear

Developer of the Mark-0 zero-power experiment, the first Reactor Pilot Program project to report criticality.

Microreactor developer

Deployment stage7 / 8Operational

Race position

Megawatts at their strongest documented state, as of 2026-08-06.

DesignR1
Per unit0.3 MWe
LaneMicroreactor
ListingPrivate

200–300 kWe.

No announced pipeline on record

No executed or announced megawatts on record

One gigawatt is 3334 × 0.3 MWe units. No megawatts rest on an executed action yet.

Why this company is on the board: First DOE Reactor Pilot Program participant to reach criticality, at INL with the U.S. Army. Source ↗

Funding

Three frames, never added together.

Raised

Private and public equity. Never added to federal money.

  • 2026-07$370M equity within a $470M Series CVenture equity · Paradigm and Caffeinated CapitalSource ↗
  • 2025-12$71M equity within a $96M Series BVenture equity · Shine CapitalSource ↗

Awarded

Federal awards and cost share. A ceiling, not cash received.

No awarded money on record.

Borrowed

Debt, repayable. Never counted as a raise, federal or private.

  • 2026-07$100M debt within the same $470M Series CVenture debt · Not disclosedSource ↗
  • 2025-12$25M debt within the same $96M Series BVenture debt · Not disclosedSource ↗

Filed, not raised

A registration filed with the SEC. The filing itself raises nothing.

No filed, not raised money on record.

Cash on hand

A balance, not a raise. Reported by the company at a stated date.

No reported cash position on record.

Licensing

Applications, permits and authorizations, naming the authority in each case.

Nothing on record in this lane as of 2026-08-06.

Physical progress

Work at a site. Criticalities are proof the physics works, not electricity.

Program selections and agreements

Being chosen for a program, or signing one. Neither is a permit nor work at a site.

Design proof outside the U.S.

Real progress on the same design abroad. Contributes 0 MWe to the U.S. race.

Nothing on record in this lane as of 2026-08-06.

Pipeline

Executed first. Announcements are labeled as announcements and never added to them.

Backed by an executed action

No executed megawatts on record as of 2026-08-06.

Announced, non-binding

No announced pipeline on record as of 2026-08-06.

Company-stated targets

What the company says, printed beside what a regulator has documented. The site never averages a target into a prediction.