n8n — thirteen advisories on 2026-09-30 (eight High): an MCP workflow-validation interpreter that lets a read-only user become instance owner via prototype mutation, code execution through the Git node's log operation, an HMAC bypass that approves waiting executions without a signature, a cross-user hijack of pending agent tool approvals, unauthenticated OAuth-client disk exhaustion, SQL injection in the Microsoft SQL node, two stored XSS, credential checks that miss nested sub-workflows; fixed 1.123.83 / 2.42.1 / 2.41.4
TL;DR #
n8n published ten security advisories on 2026-09-30 (thirteen once the three found on 2026-10-15 are counted, see the update below) — its fifth batch since July — all fixed in 1.123.83 (v1 line), 2.42.1 (stable) and 2.41.4 (legacy 2.x), which npm shows were published between 06:03 and 06:18 UTC the same morning. None carries a CVE yet. The ones that matter most to this audience: a user with nothing but workflow:read on the instance-level MCP server could push untrusted code through the MCP workflow-validation interpreter, mutate a shared prototype, and escalate to instance owner (GHSA-5jr4-xmvf-frmj, 7.7; MFA on the owner account blocks it); the Git node's log operation executes an external program it did not neutralise, so a repository the node is pointed at can run code as the n8n process — "compounded" by the node's use as an agent tool (GHSA-x8wx-g24x-3549, 7.7); and a Send-and-Wait HMAC bypass lets anyone holding a resume token approve a waiting execution without the signature, triggering whatever the workflow does next under the owner's credentials (GHSA-728h-pmr2-7cgh, 7.0). Three of the ten are in the AI surface specifically: the MCP interpreter, a cross-user hijack of another user's pending agent tool approval (GHSA-p3pg-xw4f-m72c, 6.1), and prototype pollution in the AI Workflow Builder (GHSA-3p2g-2wpm-8h3g, 6.0). Upgrade, then enable MFA on every admin.
What happened #
n8n's advisory tab carried ten new entries on 2026-09-30, each published with "No known CVE" and a set of "incomplete protection, short-term only" workarounds. Ranked by CVSS 4.0:
- GHSA-3qcw-p65v-c7vq — Unauthenticated Unbounded OAuth Client Persistence via the Authorize Endpoint (8.2, High). The unauthenticated authorize endpoint resolved OAuth clients by URL path but keyed rows on the caller's raw identifier, so varying a query string created a new first-party record every time — exempt from the registration cap, with no size limit, expiry or deletion path. Unauthenticated disk exhaustion. Fixed 2.42.1 / 2.41.4. Workaround: deactivate Form/Chat Trigger nodes using
n8nUserAuth, alert on database growth. - GHSA-5jr4-xmvf-frmj — Shared Prototype Mutation Through the MCP Workflow-Validation Interpreter Allows Owner Account Takeover (7.7, High). The MCP workflow-validation tool ran untrusted code through an interpreter that allowed shared prototype mutation; a caller with only read permission could override built-in methods, bypass server-side permission checks and become instance owner. MFA-protected owners are not affected. Fixed 2.42.1 / 2.41.4. Workarounds: deactivate the instance-level MCP server, drop unneeded
workflow:readMCP OAuth permissions, enable MFA on admins. - GHSA-x8wx-g24x-3549 — Code Execution in the Git Node Log Operation via Unneutralized Repository Configuration (7.7, High). One Git-node operation "invokes an external program" and did not strip dangerous repository configuration, so an attacker controlling a repository the node touches executes code as the n8n process user; the advisory notes the node's usability as an agent tool compounds the risk. Fixed 1.123.83 / 2.42.1 / 2.41.4. Workaround:
NODES_EXCLUDEthe Git node, audit local git configs for program-execution keys. This is the GitSpawn class landing in a workflow engine. - GHSA-r6g9-5cpp-ppwr — Shared-Workflow Credential Check Misses Nested and Tool Inline Sub-Workflows (7.2, High; v1 only). Save-time validation "inspected only one node type, one level deep," so an editor could embed credentials they may not use inside inline workflow definitions in Workflow Tool / Workflow Retriever nodes and run them with the owner's values. Fixed 1.123.83.
- GHSA-29xw-66fq-4xc3 — Stored XSS via Same-Origin Blob URL in the Binary-Data File Preview (7.2, High). The file-preview modal republished binary data as a same-origin URL in an unsandboxed iframe, stripping protective headers; a member uploading a crafted file runs script as whoever previews it, "typically the instance owner reviewing execution output." Fixed all three lines. Workaround: a restrictive
N8N_CONTENT_SECURITY_POLICY. - GHSA-728h-pmr2-7cgh — Send-and-Wait HMAC Bypass Allows Unauthenticated Approval of Waiting Executions (7.0, High). The waiting-webhook endpoint accepted two reference formats and validated before normalising the second, so a resume-token holder approves "without the signature approvals require" — and the downstream actions run under the workflow owner's credentials, "including possible command execution." Fixed 2.42.1 / 2.41.4. Workaround: no Send-and-Wait gates on high-consequence actions behind public triggers.
- GHSA-5qpp-pqww-h7fp — SQL Injection in the Microsoft SQL Node via Expression Interpolation into the Query Field (7.0, High). Node typeVersion 1 substituted resolved expressions straight into SQL text. Fixed 2.42.1 / 2.41.4; or move to typeVersion ≥ 1.1 with Query Parameters.
- GHSA-x5cw-hm7v-q7mj — Chat Trigger Stored XSS via
customCsson the Hosted-Chat Page (7.0, High). A workflow author's custom CSS was interpolated into the page as markup; on chats published without n8n authentication on the instance's own origin it executes for every visitor. Fixed all three lines. - GHSA-p3pg-xw4f-m72c — Cross-User Agent Chat Resume Allows Hijacking Another User's Pending Tool Approval (6.1, Moderate). The endpoint that resumes a suspended agent tool call "accepted a run identifier from the request body without checking that the checkpoint belonged to the caller": a project member could read another user's private agent conversation and approve pending tools on their behalf, with results written into the victim's chat. Fixed 2.42.0 / 2.41.4. Workaround:
N8N_ENABLED_MODULESwithout the Agents module. - GHSA-3p2g-2wpm-8h3g — Prototype Pollution in the AI Workflow Builder Connection Merge (6.0, Moderate). Connections were merged using node names as object members with no reserved-key check, so a node named
__proto__/constructor/prototypereached the global prototype, process-wide until restart. Fixed all three lines.
Context: this is the fifth n8n batch in three months — the July 8 and July 22 batches, the August 19 nine-advisory batch and the September 16 sixteen-advisory batch (fixed 1.123.80 / 2.40.1 / 2.39.6) — and the second in a row where the AI surface (MCP server, agent approvals, workflow builder) supplies the privilege-escalation path. Community-published n8n nodes are also being impersonated on npm this month (n8n-nodes-sysdiag2, n8n-nodes-buildcheck, n8n-nodes-data-transformer-utils, per Xygeni's September digest), which is the other half of the same story: the platform that holds every integration credential is the platform worth both a CVE and a typosquat. No community-forum "Security update — 30 September" post existed at sweep time; the GHSA pages and the npm publish timestamps are the record.
Am I affected? #
n8n --version # or: docker exec <n8n> n8n --version
npm view n8n time --json | grep -E '"(1\.123\.83|2\.42\.1|2\.41\.4)"' # all three published 2026-09-30
# Exposed if < 1.123.83 (v1) / < 2.42.1 (stable) / < 2.41.4 (legacy 2.x), and especially if any of:
# - the instance-level MCP server is enabled and any OAuth client holds workflow:read
# - the Agents module is on and projects have more than one member
# - a Git node runs against repositories other people can push to
# - Send-and-Wait approvals sit behind public webhook / chat triggers
# - Chat Triggers are published without authentication
# - the instance owner has no MFA
grep -rE 'N8N_ENABLED_MODULES|NODES_EXCLUDE|N8N_CONTENT_SECURITY_POLICY' /path/to/n8n/.env docker-compose.yml 2>/dev/null
If you are affected #
- Upgrade to 1.123.83 / 2.42.1 / 2.41.4 (all three lines shipped 2026-09-30).
- Turn on MFA for the instance owner and every admin — it is the only workaround the vendor calls a real mitigation for the owner-takeover bug.
- If the instance-level MCP server was enabled with read-scoped OAuth clients, or projects had multiple members with the Agents module on: review the audit log for owner-role changes and approved tool calls you did not make, and rotate every credential the instance stores — n8n is a credential hub, and owner is everything. playbooks/rotating-cloud-credentials.md, playbooks/if-your-webapp-was-compromised.md.
- Audit workflows with Git nodes for repositories you do not control; audit the git configs on the n8n host.
Prevention #
- Keep n8n on the current patch within days, not weeks: five batches in twelve weeks means a two-week-old install is behind two of them. prevention/supply-chain-attack-surface.md.
- The AI features are the new privilege boundary: treat the MCP server, agent tool approvals and the AI builder as admin-grade surfaces — scope MCP OAuth clients minimally, keep shared agents out of multi-member projects, and never let an approval gate be the only control on a command-execution step. prevention/mcp-hygiene.md, prevention/agent-sandboxing.md.
- Run n8n behind an identity-aware proxy; unauthenticated endpoints (authorize, waiting-webhook, hosted chat) keep appearing in these batches. prevention/credential-hygiene.md.
Update 2026-10-15: VulnCheck assigned six CVE ids on 2026-10-14, and three more 2026-09-30 advisories surfaced through them #
The mcp and agent database listings on 2026-10-15 carried six n8n rows with VulnCheck as CNA, all published 2026-10-14, each referencing one vendor advisory. The vendor pages still say "No known CVE". The pairing, from each record's references:
| CVE | Vendor advisory | VulnCheck title | CVSS 4.0 |
|---|---|---|---|
| CVE-2026-110842 | GHSA-5jr4-xmvf-frmj | Prototype pollution via MCP workflow-validation interpreter | 7.7 |
| CVE-2026-110845 | GHSA-x8wx-g24x-3549 | Code execution via Git node log operation | 7.7 |
| CVE-2026-110841 | GHSA-p3pg-xw4f-m72c | Authorization bypass in agent chat resume tool approval | 6.1 |
| CVE-2026-110850 | GHSA-x25p-9mr6-cwgp | Credential check bypass via agent node parameters | 7.2 |
| CVE-2026-110851 | GHSA-2r5r-xgvc-rj4p | Cross-project agent ownership transfer via Agents create endpoint | 6.1 |
| CVE-2026-110852 | GHSA-4c7j-qff5-r9cx | Unauthenticated workflow execution via dynamic-path webhook resolution | 6.3 |
The last three vendor advisories were not in this file. All three are dated 2026-09-30 on the tab and fixed in the same 1.123.83, 2.42.1 and 2.41.4 lines, so the batch was thirteen, not ten: the shared-workflow credential check did not inspect the agent node's model and per-tool credential parameters, so an editor could have the owner's credentials resolved for tools they control (GHSA-x25p-9mr6-cwgp, 7.2, reporter sm1ee); the Agents create endpoint accepted a caller-supplied id and overwrote an existing agent without checking which project owned it (GHSA-2r5r-xgvc-rj4p, 6.1, sm1ee); and the webhook resolver matched dynamic-path URLs on the path alone, ignoring the server-generated identifier that was the only unguessable part, so an unauthenticated caller could run workflows in unrelated projects with those projects' credentials, with form and MCP routes on the same resolver (GHSA-4c7j-qff5-r9cx, 6.3, reporter foxmiti). The VulnCheck records' ranges match the vendor pages (< 1.123.83, 2.0.0 < 2.41.4, 2.42.0 < 2.42.1). Status stays patched; the fix versions do not change.
Sources #
- CVE-2026-110842, CVE-2026-110845, CVE-2026-110841, CVE-2026-110850, CVE-2026-110851, CVE-2026-110852 — CVE Services records (VulnCheck CNA, 2026-10-14), fetched 2026-10-15; the GHSA pairing is from each record's references.
- GHSA-x25p-9mr6-cwgp, GHSA-2r5r-xgvc-rj4p, GHSA-4c7j-qff5-r9cx — the three 2026-09-30 advisories added 2026-10-15.
All vendor advisory pages fetched directly 2026-09-30; each shows "No known CVE" at fetch time.
- n8n — security advisories index — ten entries dated 2026-09-30 on page 1; three more surfaced 2026-10-15 through CVE references.
- GHSA-5jr4-xmvf-frmj — Shared Prototype Mutation Through the MCP Workflow-Validation Interpreter Allows Owner Account Takeover — 7.7, < 2.42.1 / < 2.41.4, the MFA note, credit @sm1ee.
- GHSA-x8wx-g24x-3549 — Code Execution in the Git Node Log Operation via Unneutralized Repository Configuration — 7.7, all three lines, the "invokes an external program" and agent-tool wording, credit tr4ce-ju.
- GHSA-728h-pmr2-7cgh — Send-and-Wait HMAC Bypass Allows Unauthenticated Approval of Waiting Executions — 7.0, credit @n0paew.
- GHSA-3qcw-p65v-c7vq — Unauthenticated Unbounded OAuth Client Persistence via the Authorize Endpoint — 8.2, credit Matsuuu.
- GHSA-5qpp-pqww-h7fp — SQL Injection in the Microsoft SQL Node — 7.0, credit Matsuuu.
- GHSA-p3pg-xw4f-m72c — Cross-User Agent Chat Resume Allows Hijacking Another User's Pending Tool Approval — 6.1, fixed 2.42.0 / 2.41.4, credit nlgbao1340.
- GHSA-r6g9-5cpp-ppwr — Shared-Workflow Credential Check Misses Nested and Tool Inline Sub-Workflows — 7.2, v1 only, credit SunKimsroul.
- GHSA-x5cw-hm7v-q7mj — Chat Trigger Stored XSS via customCss — 7.0, credit Antoine Di Stasi.
- GHSA-3p2g-2wpm-8h3g — Prototype Pollution in the AI Workflow Builder Connection Merge — 6.0, credit Matsuuu.
- GHSA-29xw-66fq-4xc3 — Stored XSS via Same-Origin Blob URL in the Binary-Data File Preview — 7.2, credit AdamKorcz.
- npm registry (npm view n8n time, 2026-09-30): 2.42.0 published 2026-09-29 07:28 UTC; 1.123.83 06:03, 2.41.4 06:10, 2.42.1 06:18 UTC on 2026-09-30.
- NVD API — keyword n8n, published 2026-09-25 → 09-30 — 0 results at sweep time; no CVEs assigned yet.
- n8n community — Security update — 16 September 2026 — the previous batch (sixteen advisories, fixed 1.123.80 / 2.40.1 / 2.39.6), fetched 2026-09-30 to confirm no later forum post existed.
- Xygeni — Malicious Code Digest, September 2026 — the three n8n-nodes-* impersonation packages (Sept 15 and 23). Fetched 2026-09-30.
- Related in this corpus: n8n July batches, n8n Ni8mare and the August/September batches, Metabase SQLi → n8n breach, GitSpawn git-config agent RCE cluster.