n8n Ni8mare + RCE cluster — CVSS 10.0 unauth takeover of workflow automation (Nov 2025 → August 2026)
TL;DR #
Ni8mare (CVE-2026-21858, CVSS 10.0) is an unauthenticated remote code execution vulnerability in n8n, the popular self-hosted workflow automation platform, letting any network-reachable attacker take full control of an n8n instance — and everything it has OAuth access to (Google Drive, Slack, GitHub, HubSpot, etc.). ~26,500 exposed instances observed in the wild. Patched in n8n 1.121.0 (November 18, 2025). A follow-on authenticated bypass (CVE-2026-25049) was found in February 2026 and exploited in the wild. A separate five-CVE sandbox-escape batch (CVE-2026-27493 / -27494 / -27495 / -27497 / -27577) was published 2026-02-25, headlined by an unauthenticated expression-evaluation bug in the Form node (CVE-2026-27493, CVSS 9.5) — all five fixed in 1.123.22 / 2.9.3 / 2.10.1. (Corrected 2026-08-21: this advisory previously dated that batch to June 2026 and gave no fixed versions.) A further nine-advisory batch landed 2026-08-19, none carrying a CVE, including two more sandbox escapes to host RCE — fixed in 1.123.73 / 2.35.4 / 2.36.2. An eighteen-advisory batch followed on 2026-09-02 (five High, including two more expression-sandbox escapes to code execution, CVE-2026-86076 and CVE-2026-86083, and an unauthenticated OAuth-DCR storage-exhaustion DoS) — fixed in 1.123.76 / 2.37.7 / 2.38.2. Upgrade to the latest n8n release, and bump the isolated-vm sandbox underneath it at the same time (see the August 2026 sandbox-escape advisory).
What happened #
Ni8mare (CVE-2026-21858)
Security researcher Dor Attias reported CVE-2026-21858 on November 9, 2025. The vulnerability allowed a remote, unauthenticated attacker to execute arbitrary system commands on the host running n8n and achieve full host compromise — without any valid credentials. n8n patched it in 1.121.0 released November 18, 2025.
Estimated exposed instances at disclosure: ~26,512 to 100,000 (GreyNoise and SecurityWeek estimates vary). GreyNoise observed potentially malicious scanning activity targeting exposed n8n endpoints between January 27 and February 3, 2026, logging at least 33,000 requests.
CVE-2026-25049 (February 2026)
A second critical flaw (CVSS 9.4, some sources report 9.9) was disclosed on 2026-02-04. It bypasses mitigations added for the prior December 2025 fix (CVE-2025-68613): that earlier fix added a FunctionThisSanitizer to block direct property-access patterns like obj.constructor, but the sanitizer only recognized regular-function AST nodes. Arrow functions (const {constructor} = () => {}) produce a different AST node type — an ObjectPattern via destructuring, rather than a MemberExpression — that the sanitizer never checked, and because arrow functions inherit this lexically from their enclosing scope, the payload reaches the unsanitized global context anyway. Update (added 2026-08-10, no new CVE — additional technical depth on an already-tracked finding): researchers note this is actually exploitable unauthenticated, not just by an authenticated workflow editor as originally summarized — an attacker configures a workflow with a public, no-auth webhook, embeds the destructuring-based payload in a connected node, and activates it; any subsequent HTTP request to the webhook URL executes attacker-chosen system commands as the n8n process, with no login required at all. Patched in n8n 1.123.17 / 2.5.2. Public PoCs are available; researchers describe the failure as "every layer said 'this looks safe,' and together they allowed something that was not safe at all" — n8n's expression sandbox has now had this same class of AST-node gap patched at least twice.
March 2026 RCE + credential exposure cluster
The Hacker News reported additional critical n8n flaws in March 2026 that allow RCE and exposure of stored credentials. These appear to be separate from the Nov/Feb cluster.
April 2026 (backfilled this sweep) — CVE-2026-42232: XML node prototype pollution → RCE, the bug CVE-2026-44791 (below) later bypassed
Published to n8n's own GitHub Security Advisories page on 2026-04-22 as GHSA-hqr4-h3xv-9m3r (CVSS 9.4): an authenticated user with workflow create/modify permissions could achieve global prototype pollution via the XML node — the parser fails to sanitize keys such as __proto__, constructor, and prototype when converting XML structures into JavaScript objects, and chaining the polluted prototype with other nodes yields arbitrary code execution. Fixed in n8n 1.123.32 / 2.17.4 / 2.18.1. Confirmed independently via SentinelOne's vulnerability database and Singapore's CSA advisory AL-2026-057. This predates and is distinct from the June 2026 cluster below — CVE-2026-44791 (below) is n8n's own follow-up fix for a bypass of this same patch.
June 2026 — n8n node-level RCE cluster (CVE-2026-44789, CVE-2026-44790, CVE-2026-44791)
Three additional critical flaws were disclosed in June 2026, all fixed in n8n 1.123.43 / 2.20.7 / 2.22.1: - CVE-2026-44789 (HTTP Request node prototype pollution): user-controlled pagination parameters in the HTTP Request node pollute the JavaScript prototype, bypassing sandbox restrictions and enabling arbitrary code execution. - CVE-2026-44790 (Git node argument injection): the Git node passes user-supplied branch and tag names directly into shell arguments without sanitization, allowing a workflow editor to inject shell commands that read arbitrary files or execute code on the n8n host. - CVE-2026-44791 (XML node patch bypass): despite the April 2026 fix for CVE-2026-42232 above, attackers could still reach prototype pollution through the XML node via an alternate code path.
Affected: n8n < 1.123.43 (v1 release line) / < 2.20.7 / < 2.22.1 (v2 release lines). Upgrade immediately.
June 2026 additional — CVE-2026-21877 (CVSS 10.0): authenticated arbitrary file write → RCE
A second CVSS 10.0 vulnerability (CVE-2026-21877, GHSA-v364-rw7m-3263) was disclosed in June 2026 and affects n8n in the same era as Ni8mare. An authenticated n8n user with workflow-creation privileges can craft a workflow that causes the n8n process to write arbitrary content to arbitrary paths on the host filesystem. Because n8n typically runs as a system-level service with broad filesystem access, writing a malicious file to /etc/cron.d/, a startup script directory, or any path that gets auto-executed yields persistent remote code execution. Fixed in n8n 1.121.3; upgrade to ≥ 1.121.3 (or the latest release) immediately.
CISA KEV — CVE-2025-68613 added March 2026
CVE-2025-68613 (the December 2025 authentication-bypass patch that preceded Ni8mare) was added to the CISA Known Exploited Vulnerabilities (KEV) catalog in March 2026 after CISA observed active exploitation targeting approximately 24,700 exposed n8n instances. If you are a US federal agency or contractor, this CVE carried a mandatory remediation deadline; consult your compliance team.
February 2026 (five-CVE sandbox-escape batch — dating and patched versions corrected 2026-08-21)
Earlier revisions of this advisory dated the five-CVE February sandbox-escape cluster to June 2026 and said only "fixed in the latest n8n release." Both were wrong. Fetching each advisory directly (GHSA and NVD, links below) shows all five were published 2026-02-25 as one coordinated batch, and all five share the same affected range and the same fix:
- Affected: n8n
< 1.123.22,>= 2.0.0 < 2.9.3,>= 2.10.0 < 2.10.1 - Patched: 1.123.22 / 2.9.3 / 2.10.1
The five:
- CVE-2026-27493 (GHSA-75g8-rv7v-32f7, CVSS 9.5) — Unauthenticated Expression Evaluation via Form Node. A double-evaluation bug: user input is interpolated into an HTML template on the first evaluation pass, and the second pass scans that rendered output for expression syntax and evaluates it as code. An unauthenticated attacker submitting crafted form data to a public Form node gets arbitrary expression evaluation — and, chained with any of the sandbox escapes below, RCE. Note the precondition the earlier write-up omitted: it requires a workflow where a form field value begins with
=and interpolates user-provided input, so not every public Form node is exploitable. - CVE-2026-27577 (GHSA-vpcf-gvg4-6qwr, CVSS 9.4) — Expression Sandbox Escape Leads to RCE. An authenticated workflow editor escapes the expression sandbox and runs system commands on the host. Root cause: the AST rewriter's
switchstatement was missing theSpreadElementnode type, so theprocessidentifier survived rewriting unmodified and reached the runtime as a bare global. - CVE-2026-27494 (CVSS 3.1: 9.9 / CVSS 4.0: 7.1) — Python Code node sandbox escape. Not "pending coordinated disclosure" as this advisory previously stated; NVD published full details 2026-02-25 with NIST's own CVSS 3.1 assessment added 2026-03-05. File exfiltration or RCE; full host compromise on instances using internal Task Runners.
- CVE-2026-27495 (CVSS 3.1: 9.9 / CVSS 4.0: 9.4, CWE-94) — JavaScript Task Runner sandbox escape. Same shape as CVE-2026-27494 but via the JS runner rather than the Python one.
- CVE-2026-27497 (CVSS 3.1: 8.8, not 9.4 as previously stated here; CWE-89 + CWE-94) — Merge node SQL query mode. An authenticated workflow editor executes arbitrary code and writes arbitrary files on the n8n host.
Practical consequence of the correction: if you read the earlier version of this page and concluded you were covered because you upgraded at some point in June, check your actual version against 1.123.22 / 2.9.3 / 2.10.1 — the fix landed months earlier than this advisory claimed, but so did the disclosure, meaning the exposure window for anyone on an older line has been open considerably longer than stated.
Why this matters for vibe coders and AI agent builders:
n8n is widely used as an AI workflow orchestration layer — it brokers connections between AI models and dozens of downstream services (Google Drive, Gmail, Slack, GitHub, HubSpot, Notion, Jira, Airtable, Telegram, and more) via OAuth grants and API keys stored in its credential store. A full host compromise via Ni8mare gives an attacker: - All stored OAuth tokens for every connected service - All API keys in the n8n credential store - Full workflow execution — attacker can trigger any configured workflow as if they were the operator - LLM API keys if n8n is orchestrating Claude / GPT-4 / Gemini calls
This is structurally equivalent to the Composio breach pattern: a single foothold in a workflow-broker platform is upstream of every service it touches.
Am I affected? #
# Check n8n version
npx n8n --version 2>/dev/null
docker exec <n8n-container> n8n --version 2>/dev/null
# Vulnerable: any n8n < 1.121.0 (Ni8mare), < 1.127.x (CVE-2026-25049),
# < 1.123.43/2.20.7/2.22.1 (June 2026 node-level cluster CVE-2026-44789 / CVE-2026-44790 / CVE-2026-44791),
# and additional versions affected by CVE-2026-27577 + CVE-2026-27493 (June 2026) —
# upgrade to the latest available release.
# Check if your instance is network-exposed
curl -s -o /dev/null -w "%{http_code}" http://localhost:5678/healthz
# Check for anomalous workflow executions (n8n admin panel)
# Admin → Executions → sort by date, look for unfamiliar triggered workflows
If you're running n8n < 1.121.0 and it's network-reachable: treat the instance as fully compromised and rotate all credentials it had access to.
Exposure check: Run your n8n host/port through Shodan or Censys to confirm whether it's publicly exposed.
If you are affected #
- Upgrade to the latest n8n release (addresses Ni8mare CVE-2026-21858, CVE-2026-25049, the March 2026 RCE cluster, the authenticated file-write CVE-2026-21877, and the June 2026 node-level cluster; minimum: ≥ 1.123.43 / 2.20.7 / 2.22.1 for the node-level cluster, but upgrade to the latest available version).
- Rotate all OAuth tokens and API keys stored in n8n's credential store — attacker had full access.
- Revoke and re-authorize every service connection under Settings → Credentials.
- Review execution logs for unusual workflow triggers, especially to external webhooks.
- Place n8n behind a VPN or reverse proxy with authentication — it should never be directly internet-exposed.
Prevention #
- Never expose n8n directly to the internet. Use a reverse proxy (nginx, Caddy, Traefik) that requires authentication, or put it behind a VPN/tailnet.
- Enable n8n's built-in user management and two-factor auth if you must have it web-accessible.
- Keep n8n on the latest release. Like other AI/data tools (Langflow, Marimo, LiteLLM), n8n has a pattern of security patches without always prominent release-note callouts.
- Apply least-privilege OAuth grants. Don't grant n8n
service_roleor full write access to services where read-only would suffice for your workflows. - Audit stored credentials regularly — run
Settings → Credentials → listand remove any you no longer use.
Update — 2026-08-19: a nine-advisory batch, none with a CVE, including two more sandbox escapes to host RCE #
n8n published nine security advisories on its own GHSA index on 2026-08-19, none of which carry a CVE — so CVE-driven scanning will not surface any of them. All nine share the same affected range and fix:
- Affected: n8n
< 1.123.73,< 2.35.4,< 2.36.2 - Patched: 1.123.73 / 2.35.4 / 2.36.2
The four most serious, each verified on its own advisory page:
- GHSA-9x83-43r8-5hwc (CVSS 8.7) —
$fromAIprototype leak → RCE in the n8n main process. The AI-tool-argument helper resolved placeholder names without ownership validation and permitted reserved keys, leaking live host-prototype references on primitive inputs. A low-privileged workflow builder walks the prototype chain to theFunctionconstructor and executes arbitrary code in the main process. Note what this one is: the helper that exists specifically to let an LLM supply tool arguments. - GHSA-fg85-4wv2-p98j (CVSS 7.2) — expression-sandbox bypass with process-wide persistence. Free identifiers in spread, computed-key, switch-case, and class-extension positions resolved to process globals instead of being rewritten, exposing 30+ host globals. Mutations persist process-wide across all later expression evaluations until restart — so one hostile expression contaminates every subsequent workflow run in that process. (Structurally the same missing-AST-case family as CVE-2026-27577 above, which suggests the rewriter's node coverage is worth auditing rather than patching case-by-case.)
- GHSA-mwp5-2m32-r54h (CVSS 7.7) — Git node command execution from a malicious repository. The node reset only a fixed list of command-bearing git config keys, omitting the content-filter and merge-driver families, so a malicious repo executes commands during ordinary Add/Commit/Checkout/Pull as the n8n process user. Third distinct Git-node finding in this advisory.
- GHSA-4r56-g65c-fm83 (CVSS 7.2) — credential exfiltration via inline workflow JSON. Credential validation didn't inspect inline workflow JSON across all sub-workflow-executing node types, so a shared-workflow editor — or any user creating workflows via the REST API, Public API, or MCP — embeds a node referencing a credential they don't hold; when a user who does hold it runs the workflow, the secret resolves and can be shipped to an attacker destination. The MCP path is the one to notice: an agent with workflow-creation access is enough.
Also in the batch (titles and severities from n8n's advisory index): GHSA-wxwj-8wv6-vpw2 (Elasticsearch/Firestore query injection, Moderate), GHSA-95ph-833c-4wrp (Gmail/Brevo local file read + SSRF, High), GHSA-vrv8-j27g-g7cr (Strapi/SeaTable/Mailcheck leak decrypted credentials, High), GHSA-jp9j-jr97-w9pj (SSRF check validates uri while axios dispatches url — a textbook instance of this repo's "two parsers, one string" class, Moderate), and GHSA-jmmj-93rg-6j39 (Insights API authorization, Moderate).
Separately — a CVE was assigned to the August 5 MCP node-schema path traversal. n8n disclosed it on 2026-08-05 as GHSA-6h4x-896x-fw5m (CVSS 8.7, affected < 2.33.4 and < 2.34.1, fixed 2.33.4 / 2.34.1) with no CVE at the time. On 2026-08-20 the GitHub Advisory Database published GHSA-h5rm-9fhh-5phj carrying CVE-2026-77068 (CVSS 8.7, CWE-22) for the same underlying issue: @n8n/workflow-sdk's node-schema loader derives a schema module path from an attacker-supplied node-type string with no traversal check, giving a basic member RCE in the n8n main process. Two GHSA ids, one vulnerability — flagged here so a reader tracking both doesn't double-count or assume the second is a new bug.
Do not patch this in isolation. n8n runs untrusted JavaScript in isolated-vm, which shipped its own critical sandbox escape in the same window — see the vm2 / isolated-vm sandbox-escape advisory. Treat the n8n upgrade and the sandbox dependency bump as one event.
Update 2026-09-02 — a credential-hygiene research finding, not a new CVE: thousands of n8n API tokens and weak encryption keys sitting in public GitHub commits give attackers a way in that skips every patch above entirely. GitGuardian scanned public GitHub commits since April 2025 and found 4,576 unique n8n API tokens across 1,255 hostnames; of 896 instances still reachable at test time, 321 (≈36%) accepted at least one leaked token outright — no exploit required. Separately, scanning 31,793 internet-facing n8n instances found via Shodan, GitGuardian identified 129 instances still using previously-leaked, known-weak N8N_ENCRYPTION_KEY values. That key is described as the instance's "central trust anchor": it protects stored credentials at rest, feeds JWT signing, and derives the public instance ID — recovering it (by testing candidate weak keys against leaked JWTs) enables offline decryption of every credential the instance holds plus forged session tokens. GitGuardian lists four concrete attack pathways stacking on top of the CVEs already documented above: weak-key recovery via offline JWT verification, direct abuse of a leaked API token (workflow creation, credential inspection, execution-data access), exploiting CVE-2026-25053 (the Git-node arbitrary file read from the July batch above) once inside, and session forgery against OIDC/pending users with predictable password components (GitGuardian). Note: The Hacker News' coverage of this research additionally claims leaked n8n tokens turn up alongside .claude/settings.json files specifically — that specific claim does not appear in GitGuardian's own post as fetched for this update, so it is not repeated here as a sourced fact (per this repo's rule that a search summary's attribution must be verified against the outlet it names before repeating). The practical takeaway holds regardless: an N8N_ENCRYPTION_KEY or API token committed to a public (or formerly-public) repo is a full-instance compromise independent of whether the instance is patched, because n8n tokens issued before 1.78.0 (February 2025) have no expiration and remain valid indefinitely once leaked.
Update 2026-09-09 — two authorization-bypass CVEs, both medium severity: the same "which permission gate did I check" mistake in two different execution paths.
- CVE-2026-86996 / GHSA-7hgx-277f-7vmg (CVSS 3.1 6.4, Medium, CWE-862 Missing Authorization). The "This workflow can be called by" setting that restricts who may invoke a workflow was enforced by the Execute Workflow node — but not when the same workflow was attached to an Agent as a tool (
packages/cli/src/modules/agents/tools/workflow-tool-factory.tsomitted theSubworkflowPolicyChecker.checkForProjectcall that the Execute Workflow path makes). A user able to build an Agent could therefore call — and read back the output of — a workflow its owner had explicitly restricted. Affects < 2.37.7 and 2.38.0–2.38.1; fixed in 2.37.7 / 2.38.2. Directly relevant to this repo's audience: it's an AI-agent-tool code path, not the conventional workflow-execution path, that missed the check. - GHSA-h3jj-5f3v-3685 (CVSS 6.4, Medium, CWE-863 Incorrect Authorization, no CVE assigned). The n8n Public API's execution-retry endpoint authorized on
workflow:readinstead ofworkflow:execute, letting a user with only read access to a shared workflow trigger execution retries through the API — bypassing the read/execute permission separation. Affects < 2.25.7 and 2.26.0–2.26.1; fixed in 2.25.7 / 2.26.2.
Both were confirmed directly against GitLab's Advisory Database mirror of the underlying GHSA pages rather than an aggregator summary. Neither is part of the same disclosure batch as the 2026-08-19 nine-advisory set above — they entered the advisory database independently on 2026-09-02 (GHSA-h3jj-5f3v-3685) and 2026-09-08 (CVE-2026-86996/GHSA-7hgx-277f-7vmg). Correction, 2026-09-13: GHSA-7hgx-277f-7vmg was in fact one of the eighteen advisories in n8n's 2026-09-02 batch (below); the 09-08 date is when its CVE reached the advisory database.
Update 2026-09-13 — the 2026-09-02 eighteen-advisory batch: two more expression-sandbox escapes to code execution in the n8n process, an unauthenticated storage-exhaustion DoS, and an AI-node domain-restriction bypass. n8n's community-forum security post of 2026-09-02 (Matthew von Zweigbergk) enumerates eighteen advisories — five High, thirteen Medium — all fixed in 1.123.76 / 2.37.7 / 2.38.2. The five High, each verified on its own GHSA page:
- CVE-2026-86076 / GHSA-hw8v-xxg5-vvvx (CVSS 8.7) — Expression sandbox escape via class-field sanitizer rebinding. The expression compiler's sanitizer was resolved through a dynamically-scoped
thisand did not reject reserved class-member names, so a class field named__sanitizerebinds the sanitizer and reaches theFunctionconstructor. On the backend, any expression author runs code in the n8n process; in the editor preview, a member's expression runs as JavaScript in the browser session of whoever opens the workflow. Reporter Masofgon. Third sandbox-escape-to-RCE in the expression engine this file tracks (after CVE-2026-27577 and GHSA-fg85-4wv2-p98j); the fix rejects reserved class-member names. - CVE-2026-86083 / GHSA-6xcw-7xm6-48c6 (CVSS 7.7) — Expression sandbox escape via shared-builtin tampering and code-printer injection. The legacy expression engine called the mutable global
JSON.stringifywhile printing string literals and interpolating timezone data into generated source; replacing that global from an expression turns data literals into executable code. Arbitrary code execution in the n8n process. Legacy engine only — instances on the defaultvmengine are not affected, andN8N_EXPRESSION_ENGINE=vmis the vendor's listed workaround. Reporter hiddingtrojans. - CVE-2026-86075 / GHSA-hh89-3r9w-qj3j (CVSS 8.7) — Unauthenticated persistent storage exhaustion via the OAuth Dynamic Client Registration endpoint.
client_nameandgrant_typeswere persisted with no size validation, so an attacker "without any account on the instance" registers clients in a loop until the database fills. Affects 2.x only (< 2.37.7,< 2.38.2). Reporter Masofgon. Relevant to this repo because the DCR endpoint exists to let MCP clients self-register — it is the agent-onboarding surface, and it was reachable pre-auth. - CVE-2026-86081 / GHSA-j535-v25q-vx3q (CVSS 7.1) — ReDoS in the Git node's default blocked-file-pattern match via a crafted clone destination path; the match runs synchronously in the main process, so "an authenticated user could freeze the instance for everyone with a single workflow execution." Fourth distinct Git-node finding in this file. Reporter Masofgon.
- CVE-2026-86082 / GHSA-34ff-336r-5q23 (CVSS 7.1) — Domain-restriction bypass in the OpenAI Chat Model node: the custom-base-URL allowlist that administrators configure was enforced on completions but not on the model-search dropdown, so requests — with the credential attached — reach arbitrary hosts. Reporter yadhukrishnam. The fix centralizes every OpenAI call behind one validation layer.
The thirteen Medium, by title from the forum post (GHSA ids there; not individually fetched): disabled OIDC SSO endpoints still issuing sessions (GHSA-pf83-w3f9-8m37); anonymous approval-gate bypass via resumeToken reuse over the chat WebSocket (GHSA-35jj-42hp-8gmq); log-streaming destination credential decryption without ownership checks (GHSA-pq6c-vh67-xpm3); cross-tenant project-member PII disclosure (GHSA-cqr2-h44g-v75v); cross-user active-workflow-ID disclosure (GHSA-65xw-2v52-jhxc); prototype pollution via workflow structure summary (GHSA-679f-58pq-4v2c); Git node branch..remote config sandbox bypass (GHSA-qgpw-8g46-w95v); path injection in the Elasticsearch/ElasticSecurity nodes (GHSA-f2cp-m7mv-8jpv); instance AI-credential setup URL validation failure (GHSA-q5wm-mgqx-fv2f); GitHub Trigger webhook-secret bypass on 422 reuse (GHSA-5m98-cgcr-xx3q); the Agent-tool sub-workflow caller-policy bypass already tracked above (GHSA-7hgx-277f-7vmg); cross-project workflow/credential deletion via source-control push (GHSA-hvrx-jc5j-pg3w); and a Git node file-sandbox escape via relative URLs (GHSA-fm93-2x43-6676).
Status stays patched. The count for readers keeping score: this file now tracks five distinct expression-engine or $fromAI sandbox escapes to host code execution across four batches, plus the Pyodide, isolated-vm, and JSONata sandbox findings cross-linked above. If your threat model for n8n is "workflow editors are trusted," that has been the load-bearing assumption every single time.
Update — 2026-09-15: a nineteenth advisory a day after the batch — OAuth refresh tokens not bound to the approved resource (CVE-2026-86073) #
GHSA-cw9w-vv67-hf73 / CVE-2026-86073 (Moderate, CVSS 4.0 5.9; published 2026-09-03, the day after the eighteen-advisory batch above). n8n bound OAuth authorization codes and initial access tokens to the specific resource the user consented to, but refresh tokens carried no such binding: a registered OAuth client approved for one workflow could refresh into a token for a different workflow URL the same user could access. Affects < 2.38.2 and < 2.37.7; fixed 2.38.2 / 2.37.7. Because refresh tokens issued before the fix carry no binding, n8n's guidance is to require re-authorization of connected OAuth clients after upgrading and to audit the connected-client list. Reporter: bariskececi. Relevant to anyone exposing n8n workflows as MCP tools or OAuth-protected endpoints to agents — the consent screen named one workflow; the token worked for another.
Update — 2026-09-16: a fourth-week batch of sixteen advisories (eleven High), heavy on injection into the DB and agent nodes #
n8n's bi-weekly Security update — 16 September 2026 enumerates sixteen advisories (eleven High, five Medium), all fixed in 1.123.80 / 2.40.1 / 2.39.6; cloud instances are patched automatically. The theme this round is untrusted input reaching a database or an agent's credential store. The High set, by title/GHSA:
- GHSA-9rhv-fhr8-7q5r (CVSS 8.3) — inline agent node-tool introspection decrypts any instance credential without an ownership check, so an ordinary member reads the owner's secrets in plaintext and can send them to an external host. The one to patch first.
- GHSA-xrqg-3xcp-h45x — Supabase node "Filters (String)" mode inserts the field into the query with no escaping (PostgREST filter injection; single request can delete a whole table).
- GHSA-rqch-9jrh-cr8w — path traversal + query injection via the Supabase node table name.
- GHSA-w24g-6454-7w7f — unauthenticated NoSQL injection in the MongoDB Chat Memory node (a MongoDB operator in place of
sessionIdreads other sessions' chat history). - GHSA-4wf3-rgqr-xcp3 — SQL injection in the Oracle Database node's delete/drop path.
- GHSA-fmmv-p585-7c8x — in Redis queue mode, an internal PubSub handler installs a community npm package skipping every name/permission/checksum/npm-safety check — arbitrary package install cluster-wide with no n8n account (mitigate with
N8N_COMMUNITY_PACKAGES_ENABLED=false+ Redis auth). - GHSA-7gjv-rcf8-x5qc (duplicate node IDs bypass the credential tamper guard), GHSA-597w-c3jh-g8fg (path traversal in signed resume URLs → cross-project approval forgery), GHSA-7gvh-q9w3-wqqx (credential test endpoint resolves project-scoped vars from an attacker-controlled project ID), GHSA-rx55-8qhx-4hwx (dynamic-credentials authorize endpoint leaks the session token), GHSA-gx6g-2hm7-c4xf (Wekan/Baserow credentials leak the account password), GHSA-89p4-6h98-c7xm (path traversal redirects public-API calls).
Medium: Webflow-trigger missing webhook-signature verification, stored DOM XSS in the resource-locator dropdown, unescaped parameter interpolation into third-party query languages, and a Send-and-Wait "approve within chat" bypass. This is the fourth biweekly n8n batch this repo has folded in (2026-08-19, 09-02, and the 09-03 straggler above), and the count of DB/expression-injection findings keeps climbing — the "workflow editors and their inputs are trusted" assumption remains the load-bearing one. Upgrade to 1.123.80 / 2.40.1 / 2.39.6.
Update — 2026-10-01: VulnCheck assigns CVEs to three of the 09-16 batch — the inline-agent credential decryption is CVE-2026-103246 (8.3), the Supabase node filter injection CVE-2026-103248 (7.1) and the Supabase node table-name traversal CVE-2026-103255 (7.1); NVD's text adds what the traversal reaches #
Published 2026-10-01 (CNA VulnCheck), the three ids map to GHSA-9rhv-fhr8-7q5r, GHSA-xrqg-3xcp-h45x and GHSA-rqch-9jrh-cr8w above; the vendor advisories themselves still read "No known CVE." Same fix versions (1.123.80 / 2.39.6 / 2.40.1, all npm 2026-09-16). NVD's description of CVE-2026-103255 is more specific than the vendor's about the blast radius: workflows binding the Supabase node's tableId to untrusted input let an attacker "traverse to Auth and Storage APIs using the administrative serviceRole key, bypassing Row Level Security" — i.e. the n8n integration holds the one Supabase key that RLS does not apply to, and the node let a request path escape the table endpoint. For readers of the UpGuard / Supabase RLS advisory: an n8n workflow is a place your service-role key lives, and below these versions a crafted field value in any untrusted trigger reached it. The practical effect of the CVE assignment is that CVE-driven scanners now flag n8n below 2.39.6 / 2.40.1 for the agent-credential bug they previously missed.
Update — 2026-10-04: VulnCheck assigned the remaining thirteen ids for the 09-16 batch on 10-01 (CVE-2026-103245 … -103260), so every one of the sixteen now has a CVE; the 09-30 ten-advisory batch still has none #
Published 2026-10-01 (CNA VulnCheck), all with the same affected ranges as the three ids in the 10-01 update ("before 1.123.80, from 2.0.0 before 2.39.6, and from 2.40.0 before 2.40.1", or the 2.x-only subset) and the same fixes: CVE-2026-103259 (8.5) — Dynamic Credentials authorize/revoke endpoints leak collaborators' session tokens to an attacker-set fallback resolver; CVE-2026-103257 (8.1) — path traversal in the n8n node's resource validation; CVE-2026-103251 (7.5) — community-package installation validation bypass; CVE-2026-103252 (7.1) — credential-test endpoint authorization bypass; CVE-2026-103256 (7.1, 2.x only) — Wekan and Baserow username/password credentials sent unencrypted; CVE-2026-103250 (7.0) — NoSQL injection in the MongoDB Chat Memory node; CVE-2026-103253 (7.0) — SQL injection in the Oracle Database node's drop-table operation; CVE-2026-103254 (7.0) — path traversal in signed resume-URL generation for Send-and-Wait; CVE-2026-103245 (6.9) — Webflow Trigger webhook does not verify x-webflow-signature; CVE-2026-103249 (6.9) — stored DOM XSS in Resource Locator parameters; CVE-2026-103258 (6.9, 2.x) — unescaped parameter interpolation in the SendGrid, Freshservice and ServiceNow nodes; CVE-2026-103260 (6.3, 2.x) — Send-and-Wait "Approve Within Chat" approval bypass; CVE-2026-103247 (5.8, 1.x) — duplicate node IDs bypass the workflow credential tamper guard. With the three from 10-01 (-103246, -103248, -103255) that is sixteen ids for sixteen advisories; the vendor pages still read "No known CVE" and the n8n tab (walked 2026-10-04) has nothing after 09-30. Scanners now flag n8n < 1.123.80 / 2.39.6 / 2.40.1 for all of them; the 09-30 ten-advisory batch (fixed 1.123.83 / 2.42.1 / 2.41.4) remains CVE-less, so a clean npm audit on 2.40.1 is not a clean n8n.
Sources #
- n8n Community — Security update — 16 September 2026 — fetched 2026-09-16; the vendor's batch index for the sixteen 2026-09-16 advisories with severities and fixed versions (1.123.80 / 2.40.1 / 2.39.6).
- GitHub Security Advisory — GHSA-9rhv-fhr8-7q5r (inline agent credential decryption without ownership check) — fetched 2026-09-16; CVSS 8.3, affected < 2.40.1 / < 2.39.6.
- GitHub Security Advisory — GHSA-xrqg-3xcp-h45x (Supabase node PostgREST filter injection) — fetched 2026-09-16; CVSS 7.1, table-wide delete from one request.
- GitLab Advisory Database — n8n: Agent Workflow Tool Bypasses Sub-Workflow Caller Policy (CVE-2026-86996) — fetched directly: GHSA-7hgx-277f-7vmg, CVSS 6.4, affected/patched versions, root-cause file path, publish date 2026-09-08.
- GitLab Advisory Database — n8n: Public API Execution Retry Authorization Bypass (GHSA-h3jj-5f3v-3685) — fetched directly: CVSS 6.4, affected/patched versions,
workflow:readvsworkflow:executeroot cause. - GitHub Security Advisories — n8n has XML Node Prototype Pollution that leads to RCE (GHSA-hqr4-h3xv-9m3r / CVE-2026-42232) — primary source for the April 2026 backfill: CVE↔GHSA pairing, CVSS score, affected/patched versions confirmed directly on n8n's own advisory page.
- SentinelOne Vulnerability Database — CVE-2026-42232 — independent corroboration.
- BleepingComputer — "Max severity Ni8mare flaw lets hackers hijack n8n servers" — Ni8mare CVE-2026-21858 detail, 26,512 instances, GreyNoise exploitation data.
- The Hacker News — "Critical n8n Vulnerability (CVSS 10.0) Allows Unauthenticated Attackers to Take Full Control" — broad coverage.
- CyberSecurityNews — "Ni8mare Vulnerability Let Attackers Hijack n8n Servers" — 26,512 hosts exposed figure.
- The Hacker News — "Critical n8n Flaw CVE-2026-25049 Enables System Command Execution" — authenticated bypass, February 2026.
- BleepingComputer — "Critical n8n flaws disclosed along with public exploits" — public exploit availability.
- NVD — CVE-2026-21858 — official CVE record.
- The Hacker News — "Critical n8n Flaws Allow Remote Code Execution and Exposure of Stored Credentials" — March 2026 follow-on cluster.
- SecurityWeek — "Critical Vulnerability Exposes n8n Instances to Takeover Attacks" — instance count and exploitation risk.
- Cross-reference: 2026-05-mcp-stdio-systemic-rce.md (n8n-mcp SSRF), 2026-05-composio-ai-agent-platform-breach.md (same "workflow broker as credential hub" pattern).
- GitLab Advisory Database — CVE-2026-44789: n8n HTTP Request Node pagination prototype pollution → RCE — June 2026 cluster (CVE-2026-44789 / CVE-2026-44790 / CVE-2026-44791); prototype pollution, Git-node argument injection, XML node RCE; fixed in 1.123.43 / 2.20.7 / 2.22.1.
- CyberSecurityNews — Critical n8n Vulnerabilities Expose Automation Nodes to Full RCE — CVE-2026-44789 / CVE-2026-44790 / CVE-2026-44791 prototype-pollution + node-RCE detail.
- GitGuardian — n8n Security: How Leaked API Keys Expose Your Encryption Key — fetched directly for the 2026-09-02 update: primary research source, token/instance/weak-key counts, four attack pathways,
N8N_ENCRYPTION_KEYrole. - The Hacker News — Leaked n8n API Tokens Exposed Live Instances to Credential Theft — corroborating coverage, published 2026-08-05.
- NVD — CVE-2026-44789, CVE-2026-44790, CVE-2026-44791 — official CVE records.
- GitHub Advisory — GHSA-v364-rw7m-3263 (CVE-2026-21877, authenticated file-write → RCE, fixed 1.121.3)
- NVD — CVE-2026-21877 — CVSS 10.0 authenticated arbitrary file write.
- SecureLayer7 — A Deep Dive into CVE-2026-25049: n8n Remote Code Execution — added 2026-08-10: AST-node root cause, arrow-function/destructuring bypass mechanics, unauthenticated-via-public-webhook exploitation path, relationship to CVE-2025-68613.
- Endor Labs — CVE-2026-25049 Expression Escape Vulnerability Leading to RCE in n8n — added 2026-08-10: independent confirmation, patched-version detail.
-
CISA KEV — CVE-2025-68613 — added March 2026; ~24,700 exposed instances observed. Sources for the 2026-08-21 correction of the February sandbox-escape batch (each fetched directly this sweep; the earlier "June 2026 / fixed in latest release" text was not supported by any of them):
-
GitHub Advisory Database — GHSA-75g8-rv7v-32f7 (CVE-2026-27493) — CVE↔GHSA pairing, CVSS 9.5, published 2026-02-25, affected ranges and patched versions, and the "form field value begins with
=" precondition. - GitHub Advisory Database — GHSA-vpcf-gvg4-6qwr (CVE-2026-27577) — CVSS 9.4, published 2026-02-25, same affected/patched ranges.
- Pillar Security — Zero Click Unauthenticated RCE in n8n: A Contact Form That Executes Shell Commands — primary researcher write-up; double-evaluation root cause for CVE-2026-27493 and the missing
SpreadElementAST-rewriter case for CVE-2026-27577. - NVD — CVE-2026-27494 — Python Code node sandbox escape; fully analyzed (not "pending disclosure"), CVSS 3.1 9.9, NIST assessment added 2026-03-05.
- NVD — CVE-2026-27495 — JS Task Runner sandbox escape, CVSS 3.1 9.9 / CVSS 4.0 9.4, CWE-94.
-
NVD — CVE-2026-27497 — Merge node SQL query mode, CVSS 3.1 8.8 (this advisory previously said 9.4), CWE-89 + CWE-94. Sources for the 2026-08-19 batch (added 2026-08-21):
-
n8n GitHub Security Advisories index — the nine same-day advisories, their severities, and the shared 1.123.73 / 2.35.4 / 2.36.2 fix line.
- GHSA-9x83-43r8-5hwc —
$fromAIprototype leak toFunctionconstructor, CVSS 8.7. - GHSA-fg85-4wv2-p98j — expression-sandbox bypass, 30+ host globals, process-wide persistence until restart, CVSS 7.2.
- GHSA-mwp5-2m32-r54h — Git node content-filter / merge-driver config keys not reset, CVSS 7.7.
- GHSA-4r56-g65c-fm83 — inline-workflow-JSON credential validation gap reachable via REST/Public API/MCP, CVSS 7.2.
- GitHub Advisory Database — GHSA-h5rm-9fhh-5phj (CVE-2026-77068) and n8n GHSA-6h4x-896x-fw5m — the two advisory ids covering the single
@n8n/workflow-sdknode-schema path-traversal issue.
2026-09-13 update sources — the batch index plus the five High advisories, each fetched directly from n8n's GHSA index:
- n8n Community — Security update — 02 September 2026 — fetched 2026-09-13; the vendor's own batch post listing all eighteen advisories with severities and the 1.123.76 / 2.38.2 / 2.37.7 fixed versions.
- GHSA-hw8v-xxg5-vvvx (CVE-2026-86076) — class-field sanitizer rebinding, CVSS 8.7, backend RCE and editor-preview JS execution.
- GHSA-6xcw-7xm6-48c6 (CVE-2026-86083) — JSON.stringify tampering in the legacy engine, CVSS 7.7, N8N_EXPRESSION_ENGINE=vm workaround.
- GHSA-hh89-3r9w-qj3j (CVE-2026-86075) — unauthenticated OAuth DCR storage exhaustion, CVSS 8.7, 2.x only.
- GHSA-j535-v25q-vx3q (CVE-2026-86081) — Git node blocked-file-pattern ReDoS, CVSS 7.1.
- GHSA-34ff-336r-5q23 (CVE-2026-86082) — OpenAI Chat Model node domain-restriction bypass, CVSS 7.1.
2026-09-15 update source:
- n8n — GHSA-cw9w-vv67-hf73: Per-Resource OAuth Consent Bypass via Unbound Refresh Token Resource Substitution (CVE-2026-86073) — fetched 2026-09-15; CVSS 5.9, < 2.38.2 / < 2.37.7, the re-authorization guidance.
- 2026-10-01 update sources — NVD API — CVE-2026-103246, CVE-2026-103248, CVE-2026-103255 (CNA VulnCheck, published 2026-10-01, CVSS 4.0 8.3 / 7.1 / 7.1, descriptions quoted; queried 2026-10-01); vendor advisories GHSA-9rhv-fhr8-7q5r, GHSA-xrqg-3xcp-h45x, GHSA-rqch-9jrh-cr8w (re-fetched 2026-10-01: published 2026-09-16, still "No known CVE", patched ≥ 1.123.80 / ≥ 2.39.6 / ≥ 2.40.1, "Build Manually" filter mode as the Supabase workaround); npm — n8n time (1.123.80, 2.39.6 and 2.40.1 all 2026-09-16; latest 2.41.5; queried 2026-10-01).
- 2026-10-04 update sources — NVD API keyword window 10-01 → 10-04, n8n — CVE-2026-103245, -103247, -103249 … -103254, -103256 … -103260 (CNA VulnCheck, published 2026-10-01, CVSS 4.0 scores and descriptions as quoted; -103259 vector AV:N/AC:L/AT:P/PR:H/UI:A/VC:H/VI:H/VA:H/SC:H), queried 2026-10-04; n8n-io/n8n advisory tab (walked 2026-10-04: newest 2026-09-30).