TL;DR

Security researcher Oren Yomtov (Accomplish AI) disclosed SharedRoot: a chain that lets code running inside Claude Cowork's local Linux VM sandbox on macOS escape to read-write access on the host Mac's entire filesystem — SSH keys, cloud credentials, and user files included — via a real Linux kernel privilege-escalation bug (CVE-2026-46331). Anthropic closed the report as "Informative" without a fix; the practical mitigation is that current Cowork defaults to cloud execution, which sidesteps the local escape path entirely. Anyone still running local Cowork sessions on macOS is exposed.

What happened

Claude Cowork's local execution mode runs the agent inside a Linux VM (via Apple's Virtualization framework) for isolation. To let the agent read and write files in the connected folder, Cowork mounts the entire host root filesystem (/) into the VM via virtiofs at /mnt/.virtiofs-root — intended to be visible only to guest-root inside the VM, not to the unprivileged session user the agent's own code runs as.

Yomtov's exploit chain gets from unprivileged code inside the VM to guest-root, then to the host filesystem, in four steps:

  1. Namespace escalation — the unprivileged session user calls unshare to create a new user namespace, becoming "root" inside it with a full capability set, including CAP_NET_ADMIN.
  2. Kernel module trigger — with CAP_NET_ADMIN, the attacker configures a traffic-control action using the act_pedit kernel module over a netlink socket, forcing it to autoload.
  3. Memory corruption via CVE-2026-46331 ("pedit COW") — a partial copy-on-write flaw in act_pedit: tcf_pedit_act() computes the COW range for skb_ensure_writable() once, before its key loop, without accounting for runtime header offsets, leaving part of the write region unprotected. This lets the attacker poison the page cache of a file they should only be able to read — targeting a root-owned helper binary. CVE-2026-46331 is a real Linux kernel CVE (CVSS 7.8 per the kernel.org CNA), affecting kernel branches from 4.19.244 through 7.0.x, published 2026-06-16.
  4. Privilege escalation to guest-root — Cowork's root-owned coworkd daemon re-execs the now-corrupted helper binary. Because coworkd is already root and NoNewPrivs does not block privilege gain across an exec of a setuid/root-owned binary, the session user's code ends up running as guest-root inside the VM — with full read-write access to /mnt/.virtiofs-root, i.e., the entire host Mac filesystem.

Yomtov described the practical trigger as trivial: connecting a folder to a fresh Cowork session and sending "one short message" was enough to demonstrate the escape. Accomplish AI estimates roughly 500,000 macOS users were running local Cowork sessions exposed to this chain before mitigation.

Anthropic's response, per the researcher's writeup, was to close the report as "Informative" rather than issue a dedicated fix, framing further hardening as "defense-in-depth" rather than a required patch. The de facto mitigation is that the current version of Cowork defaults to cloud execution, which does not use this local VM/virtiofs architecture — but any user still on local execution mode remains exposed, since Anthropic did not patch the underlying mount design or the exploit path itself.

Am I affected?

You're potentially affected if you run Claude Cowork on macOS in local execution mode (as opposed to the newer cloud-execution default):

# Check whether Cowork is configured for local vs. cloud execution
# (consult Cowork's own settings/preferences UI — no single file check applies across versions)

# Look for the virtiofs mount characteristic of local-mode sessions
mount | grep -i virtiofs
ls -la /mnt/.virtiofs-root 2>/dev/null

If you cannot confirm you're on cloud execution mode, treat local Cowork sessions as exposed until you verify your version and settings directly with Anthropic's current documentation.

If you are affected

  1. Switch Claude Cowork to cloud execution mode if a local-mode option is still presented — this is the only mitigation Anthropic has shipped for this class of issue.
  2. Avoid connecting folders containing SSH keys, cloud credential files, or other sensitive material to a local-mode Cowork session until you've confirmed you're on cloud execution.
  3. If you ran local-mode sessions on untrusted or agent-directed content (e.g., a prompt injection could trigger the same VM/shell access an unprivileged escape would rely on), treat the host as potentially exposed and review for unexpected file modifications outside the connected folder.

→ Playbook: if your local AI agent was exploited

Prevention

  • Prefer cloud execution mode for Claude Cowork where available — it does not share the host filesystem into a VM the agent's own code can escalate within.
  • Treat "runs in a local VM sandbox" as a mitigation for accidental mistakes, not a security boundary against a determined escape chain — the VM's value depends entirely on what it shares back to the host and how.
  • Don't grant a local sandboxed agent access to folders containing credentials, SSH keys, or other high-value secrets, regardless of vendor sandboxing claims.

→ Prevention: agent sandboxing

IOCs

This is a design/architecture flaw exploited locally, not a remote campaign — there are no network IOCs. Relevant artifacts for detection/audit:

Type Value
CVE (underlying kernel bug) CVE-2026-46331 ("pedit COW", Linux act_pedit traffic-control subsystem)
Affected kernel branches 4.19.244 through 7.0.x (multiple stable branches, incl. 5.4, 5.10, 5.15, 5.17, 6.13+)
Host mount point (local Cowork VM) /mnt/.virtiofs-root
Vulnerable daemon coworkd (runs as root inside the Cowork Linux VM)
Vendor status Anthropic closed the report as "Informative"; no dedicated patch for the escape chain — mitigation is the shift to cloud-execution-by-default

Technique note

This is a sibling of the "localhost is not a security boundary" and connector-chaining lethal-trifecta classes this repo already tracks (OpenClaw CVE-2026-25253, OpenCode CVE-2026-22812 and CVE-2026-22813, and Claude Cowork's own earlier Windows/Hyper-V escape, tracked separately) — except here the trust boundary is a VM/virtiofs mount rather than a network port, and the vendor's response ("Informative," no fix) is another documented case of a major AI vendor declining to treat a local-sandbox escape as in-scope, consistent with the pattern already noted for Claude Desktop Extensions and the account-wide personalization-sync RCE.

Sources