Dependency-confusion recon campaign — 4 waves, 9+ corporate-scope impersonations, escalated to full credential theft (May–Jul 2026)
TL;DR #
Microsoft Threat Intelligence disclosed a dependency-confusion campaign: a single operator, publishing under three npm aliases (mr.4nd3r50n, ce-rwb, t-in-one), published 33 malicious packages in an initial pair of bursts on May 28, 2026, then a further 12 in a third burst on May 29, 2026 (45 total) under 9 organizational scopes that mirror real internal corporate namespaces (e.g. @cloudplatform-single-spa, @data-science, @payments-widget, @travel-autotests, @sber-ecom-core, @wb-track, and three matching the actor aliases). Each package's postinstall hook fetches and runs an obfuscated reconnaissance-only payload — no destructive or credential-exfiltration action confirmed at the time. Update (2026-07-04): SafeDep's independent tracking shows this is one template reused across at least four waves through July 1, 2026, and the most recent wave has escalated from reconnaissance to full credential exfiltration (SSH keys, cloud credentials, Kubernetes/Docker config). npm has taken down the accounts and packages disclosed so far, but the template is still being reused by new actors/scopes.
What happened #
Dependency confusion occurs when a build system is configured to resolve a package name from the public registry even though an identically-named package is meant to be private/internal — an attacker who registers the public name gets installed instead. Microsoft's Threat Intelligence team found this actor doing exactly that at scale: pre-staging some packages as early as 2026-05-04, then publishing in three timed bursts:
mr.4nd3r50n— 26 packages, version100.100.100, 2026-05-28 18:47–18:51 UTCce-rwb— 7 packages, version3.5.22, 2026-05-28 19:02–19:03 UTCt-in-one— 12 packages across three scopes, 2026-05-29 09:01–09:02 UTC
Each malicious package's postinstall script fetches an obfuscated payload from an attacker C2 (oob.moika.tech) that harvests system information, environment variables, and developer/build context — Microsoft describes it as operating in "reconnaissance-only mode" by default, with the C2 architecture capable of pushing further payloads to specific targets later. Microsoft attributes the campaign to a single operator across all three aliases based on shared C2 infrastructure, identical endpoints, matching authentication tokens, and matching publishing-toolchain fingerprints — but does not name a known threat-actor group.
Per Microsoft: "Based on our investigation and feedback to the npm team these repos and users were taken down."
Update 2026-07-04 — same template, four waves, escalation to credential theft #
SafeDep's independent tracking (SafeDep) found that the README lure text used by Microsoft's May 28–29 disclosure ("Internal package — Platform Engineering Team"-style marker) is a reused template now confirmed across four separate waves:
- 2026-05-27 —
@cloudplatform-single-spa,@mlspace,@car-loans(version99.99.99) - 2026-05-29 —
@t-in-one,@capibar.chat,@sber-ecore-core(the wave Microsoft's disclosure covers) - 2026-06-01 —
@emcd-vuescope - 2026-07-01 —
@marketfront(25 packages, all version7.0.0, published in a single burst at ~22:59:33 UTC) and@tqm-mfescopes
The @marketfront wave impersonates an e-commerce internal registry with package names like @marketfront/header, @marketfront/footer, @marketfront/navbar, @marketfront/bannerpopup, and @marketfront/designsystemdevtool, plus the same fictional-internal-registry lure (npm.marketfront.io, jira.marketfront.io, docs.marketfront.io) referencing "telemetry collection."
This wave is a material escalation, not a repeat. Where Microsoft characterized the May wave as reconnaissance-only, the @marketfront wave's postinstall runs a ~160KB obfuscated script that actively harvests and exfiltrates roughly 20 credential file types — SSH keys, AWS credentials, Kubernetes config, Docker config, npm/git credentials, .env files, and shell history — compresses the haul with gzip, and exfiltrates it via HTTPS POST with a custom X-Secret header to a /api/v1/events endpoint, with the C2 host itself obscured via RC4+XOR encryption. This confirms the prior sweep's triage note that a reconnaissance-only first-stage payload is often a precursor to a larger campaign — here, the same actor/template graduated to full credential theft within about five weeks.
Am I affected? #
# Check whether any of the actor-linked scopes were ever installed
npm ls --all 2>/dev/null | grep -E '@cloudplatform-single-spa|@wb-track|@data-science|@ce-rwb|@payments-widget|@travel-autotests|@t-in-one|@capibar\.chat|@sber-ecom-core|@mlspace|@car-loans|@sber-ecore-core|@emcd-vue|@marketfront|@tqm-mfe'
# Audit for any postinstall reaching oob.moika.tech (May wave) or making requests
# with an X-Secret header to a /api/v1/events path (July @marketfront wave)
grep -r "oob.moika.tech" node_modules/*/package.json 2>/dev/null
grep -rl "X-Secret" node_modules/*/package.json node_modules/*/*.js 2>/dev/null
You're at risk if your build pulls packages from any of the scopes above from the public npm registry rather than an internal/private registry, or if you (coincidentally) use one of these scope names for your own internal packages without registry-scoping enforcement. Given the template is being reused with new scope names roughly every 3–5 weeks, treat any npm scope with a README claiming "Internal package — Platform Engineering Team"-style ownership as suspect, not just the specific scopes listed here.
If you are affected #
- Remove any installed package from the listed scopes and purge lockfile entries.
- For the May wave (recon-only): treat any host that ran
npm installagainst these packages as having had system/environment information disclosed — rotate CI secrets and developer credentials as a precaution, per playbooks/if-you-ran-malicious-postinstall.md. - For the July
@marketfront/@tqm-mfewave (active credential exfiltration): treat the host as fully compromised — rotate SSH keys, AWS/cloud credentials, Kubernetes/Docker config, npm/git tokens, and anything in.envfiles immediately, per playbooks/rotating-cloud-credentials.md. - Check outbound network logs for connections to
oob.moika.tech, and for POST requests carrying anX-Secretheader to any/api/v1/eventspath. - Configure npm/Yarn/pnpm to always resolve your internal scope names from your private registry, never falling back to the public registry (
.npmrcscope-to-registry mapping).
Prevention #
- Register your internal package scope names on the public npm registry too (even as empty placeholder packages), or configure explicit scope-to-registry mapping in
.npmrcso internal scopes can never resolve publicly. - Use
npm config set install-links trueequivalents / lockfile registry pinning to prevent silent registry substitution. - See prevention/npm-hardening.md and prevention/supply-chain-attack-surface.md for dependency-confusion-specific hardening steps.
Sources #
- Microsoft Security Blog — "Malicious npm packages abuse dependency confusion to profile developer environments" — primary vendor disclosure: package counts, scopes, aliases, timeline, payload behavior, attribution assessment, takedown confirmation.
- SafeDep — "@marketfront: 25 npm Packages Reuse a Known Lure" — fourth-wave discovery, cross-wave timeline (May 27 → Jul 1), escalation from recon-only to full credential exfiltration, IOC detail (
X-Secretheader, RC4+XOR C2 obfuscation).