Claude Code deny-rule bypass via 50-subcommand parser cap (silently patched in v2.1.90)
TL;DR #
Adversa AI found that Claude Code's bash-command permission checker (bashPermissions.ts) stopped enforcing configured deny rules entirely on any compound shell command with more than 50 subcommands — instead of blocking, it fell back to a generic "allow?" prompt. Discovered via the leaked Claude Code source, disclosed 2026-04-02, and traced to the same release — v2.1.90 (2026-04-01/04) — that silently fixed the unrelated SOCKS5 null-byte sandbox bypass. No CVE assigned.
What happened #
Claude Code lets users configure deny rules — commands the agent should never be allowed to run regardless of what it's asked to do. The legacy regex-based parser in bashPermissions.ts analyzed each subcommand in a compound shell string (chained with &&, ||, or ;) individually against those rules. Anthropic's internal ticket CC-643 documents that this per-subcommand analysis caused the UI to freeze on very long compound commands, so a hard cap of 50 subcommands was added: past that threshold, the parser stops enforcing deny rules and falls back to a generic permission prompt instead of refusing the command.
Adversa AI's proof of concept: a shell command consisting of 50 harmless no-op subcommands followed by a curl command that should have hit a deny rule. Claude Code, having exhausted its 50-subcommand analysis budget, presented a normal "allow this?" prompt instead of blocking outright — meaning any deny rule a developer or org configured could be defeated simply by padding the command with enough no-ops. Anthropic's codebase reportedly already contained a safer tree-sitter-based parser that handles this correctly regardless of command length, but it had not shipped to public builds at time of disclosure.
This is a different bug from the SOCKS5 sandbox null-byte bypass disclosed by a different researcher (Aonan Guan) — different root cause (parser resource cap vs. hostname-matcher/OS disagreement), different subsystem (deny-rule permission checks vs. network egress allowlist) — but both were fixed in the same release, v2.1.90, and neither shipped with a CVE, public advisory, or changelog note. This is now the third silently-patched Claude Code security-relevant bug tracked in this repo (after CVE-2025-66479 and the SOCKS5 bypass), reinforcing the standing guidance: assume "latest" carries undisclosed fixes and don't pin old Claude Code versions.
Am I affected? #
claude --version # fixed in v2.1.90 and later
If you relied on permissions.deny rules in .claude/settings.json as a hard security boundary on any version before v2.1.90, and ever ran (or an agent ever constructed) a compound command with 50+ chained subcommands, treat any deny-listed action from that session as potentially having executed.
If you are affected #
→ playbooks/auditing-a-vibe-coded-repo.md → playbooks/rotating-cloud-credentials.md — if a denied command could have exfiltrated credentials.
Prevention #
→ prevention/agent-sandboxing.md — deny-list permission checks inside an agent are not a substitute for OS/network-level enforcement; a single parser limitation can silently disable them. → Keep Claude Code on auto-update. See also the SOCKS5 sandbox bypass for the pattern of silently-shipped security fixes in this tool.
Sources #
- Adversa AI — Critical Claude Code vulnerability: Deny rules silently bypassed because security checks cost too many tokens
- The Register — Claude Code bypasses safety rule if given too many commands
- SC Media — Claude Code vulnerable to prompt injection due to subcommand limit
- Cybersecurity News — Critical Claude Code Vulnerability Silently Bypasses Developer-Configured Security Rules