Vite dev-server WebSocket arbitrary file read + fs.deny bypasses (CVE-2026-39363, CVE-2026-39364, CVE-2026-39365) — mass-scanned in the wild from August 2026 for .env, AWS and Terraform secrets
TL;DR #
Three related flaws in Vite's dev server let an attacker who can reach it over the network (e.g. it was started with --host or otherwise exposed) read arbitrary files on the machine — including .env secrets — by talking to the HMR WebSocket directly or by appending query parameters that dodge the server.fs.deny/server.fs.allow checks. Fixed in Vite 6.4.2 / 7.3.2 / 8.0.5. Update 2026-09-14: F5 Labs measured a ~20× jump in exploitation attempts against CVE-2026-39364 in August 2026 — 807 attack sessions, ~32,000 events — hunting .env, AWS credential files, Azure profiles, Terraform state and /proc/self/environ; status moved to active. Update 2026-09-15: a further Windows-only server.fs.deny bypass (CVE-2026-53571, NTFS alternate data streams / 8.3 names, vendor advisory 2026-06-01) moves the fix line to 6.4.3 / 7.3.5 / 8.0.16 — see the update below.
What happened #
Vite's dev server exposes an HMR WebSocket alongside its HTTP interface, and the two don't enforce the same access controls:
- CVE-2026-39363 (CVSS 8.2) — the WebSocket's
vite:invokeevent can call the internalfetchModulemethod directly.fetchModuledoesn't apply theserver.fsrestrictions that gate the HTTP request path. An attacker who can open a WebSocket connection to the dev server without anOriginheader can request afile://path with a query suffix like?rawor?inlineand get the raw file contents back as a JS module string — bypassing the HTTP-level file-access allowlist entirely. - CVE-2026-39364 (CVSS 8.2) —
server.fs.deny(Vite's denylist for sensitive files like.envor TLS keys) can be bypassed by appending query parameters — files that should 404 are instead returned with an HTTP 200 when the request carries a suffix like?raw,?import&raw, or?import&url&inline. - CVE-2026-39365 (CVSS 5.3 medium) — the dev server's handling of
.map(source map) requests for optimized dependencies resolves file paths and callsreadFilewithout stripping../segments from the URL, letting a request walk outside the project root and outside theserver.fs.strictallowlist to fetch arbitrary.mapfiles. Also affects thevite-pluspackage (≤ 0.1.15).
All three require the dev server to be network-reachable (started with --host, or otherwise not bound to loopback-only) — the default vite dev on localhost without --host is not exposed to this from outside the machine, but any container, Codespace, VM, or shared dev environment where Vite listens on a non-loopback interface is in scope, as is any browser tab on the same host/network per the broader "localhost is not a security boundary" pattern this repo tracks for local dev servers.
Am I affected? #
npm ls vite
Vulnerable ranges: CVE-2026-39363 and CVE-2026-39365 affect 6.0.0 – 6.4.1, 7.0.0 – 7.3.1, and 8.0.0 – 8.0.4; CVE-2026-39364 affects 7.1.0 – 7.3.1 and 8.0.0 – 8.0.4 (6.x branch not affected). Fixed in 6.4.2, 7.3.2, 8.0.5 (and later). If you (or a CI/preview environment) ever run vite dev --host or otherwise expose the dev server beyond localhost, treat any secrets in .env files in that project as potentially read during the exposure window.
If you are affected #
→ playbooks/rotating-cloud-credentials.md — rotate anything in a .env the dev server could reach.
→ playbooks/if-your-webapp-was-compromised.md
Prevention #
→ Upgrade to a patched Vite release; don't run --host / expose the dev server beyond 127.0.0.1 unless you also gate it behind auth or a VPN.
→ prevention/credential-hygiene.md — keep secrets out of files a dev server could ever serve; prefer environment injection at the process level over .env files in the project root.
Update — 2026-09-14: exploited in the wild at scale — F5 Labs sees mass scanning for exposed Vite dev servers #
F5 Labs published telemetry on 2026-09-11 ("Cloud Takeover: Mass Scanning for Exposed Vite Endpoints (CVE-2026-39364)") showing the server.fs.deny bypass moved from disclosure to commodity scanning five months after the patch:
- Volume: 807 session-grouped attacks / ~32,000 raw events in the August 2026 analysis window, against 1,732 events across the entire prior three months — roughly a twentyfold escalation.
- Technique: exactly the disclosed query-suffix bypass (
?raw,?import&raw,?import&url&inline) againstserver.fs.deny. - What they want: environment files, AWS credential directories, Azure profiles, Infrastructure-as-Code state files (Terraform), and
/proc/self/environ— i.e. the cloud keys a developer's laptop or a preview container holds, not the app's source. - Where from: the top sources were Google Cloud Platform infrastructure, concentrated in the United States (17,297 events), Belgium (4,407) and the Netherlands (4,011) — rented cloud capacity, the same scanning posture this repo sees for Langflow and GitLab.
F5's version framing (affects 7.1.0 → < 7.3.2 and 8.x < 8.0.5, CVSS 7.5, published 2026-04-07) matches the ranges above. Status here moves patched → active under this repo's "confirmed exploited in the wild" rule: the fix has existed since April, but the population being scanned is the one that never applied it — vite dev --host inside a Codespace, a Docker container with the port published, a Vercel/Netlify-style preview on a VM, or a vibe-coding platform's "run it in the cloud" button. It is not in CISA's KEV catalog as of 2026-09-14.
Practical reading: if a Vite dev server on any version below the fix line was ever reachable from outside the machine during or after April 2026, assume the .env and any ~/.aws/credentials on that host were read, and rotate — the scanners are automated, and the window was five months long.
Update — 2026-09-15: a further server.fs.deny bypass on Windows (CVE-2026-53571) moves the fix line to 6.4.3 / 7.3.5 / 8.0.16 #
Vite's own advisory tab carries GHSA-fx2h-pf6j-xcff / CVE-2026-53571 (High, CVSS 8.2; published 2026-06-01), not previously logged here: on Windows the deny logic did not normalise NTFS alternate data stream syntax or 8.3 short filenames before matching, so a request such as /.env::$DATA?raw resolved to the file's default stream and bypassed the denylist. Affects ≤ 6.4.2, 7.0.0 – 7.3.4, 8.0.0 – 8.0.15 and vite-plus ≤ 0.1.23; fixed 6.4.3 / 7.3.5 / 8.0.16 and vite-plus 0.1.24. Preconditions are the same as above — dev server exposed to the network, sensitive files inside allowed directories — plus an NTFS volume or 8.3 name generation enabled. Correction to the guidance above: on Windows, 6.4.2 / 7.3.2 / 8.0.5 are not sufficient; use the June line or later. Reporters: TazmiDev, 332QAQ. By the vendor's own index this is the sixth distinct server.fs.deny bypass since April 2025 (.svg / relative paths, an invalid request-target, /./, backslashes on Windows, query suffixes, now ADS and 8.3 names): the denylist is a string filter over an operating-system namespace, and the OS keeps having more spellings than the filter. The durable fix is not exposing the dev server.
Update — 2026-10-06: three more dev-server advisories published today — a project import whose path matches an absolute system path served the host's file instead (GHSA-rq7h-c2jc-7f22, 6.3), ?vite-wasm-instance leaks the first four bytes of any file outside server.fs through an error message (GHSA-vfpm-58rq-9qcg, 6.3), and middleware-mode servers could execute a cross-origin script via transformIndexHtml (GHSA-9jrq-w75r-8gcw, 2.1); fix line moves to 6.4.4 / 7.3.7 / 8.1.6 / 8.2.4 / 8.3.3 and vite-plus 1.1.0 #
Vite's tab (fetched 2026-10-06) carries three advisories dated 2026-10-06, none with a CVE yet:
- GHSA-rq7h-c2jc-7f22 — Moderate 6.3. On non-Windows hosts,
fsPathFromUrlprocessed URLs without resolving them against the project root, so an absolute path could be recorded insafeModulePaths; when a project imports a file whose path happens to match an absolute system path, the dev server returned the host's file. Three conditions: the dev server exposed to the network, a project import matching a host absolute path, and the target not covered byserver.fs.deny. Affected≤ 8.3.2 / ≤ 8.2.3 / ≤ 8.1.5 / ≤ 7.3.6 / ≤ 6.4.3. Reporter Kushalkhemka. - GHSA-vfpm-58rq-9qcg — Moderate 6.3. The internal WebAssembly plugin's load hook skipped the
server.fscheck; appending?vite-wasm-instanceto a request for a restricted file returned its first four bytes inside the WASM parse error. Affected8.2.0 – 8.3.2(andvite-plus0.2.8 – 1.0.0). Four bytes is enough to fingerprint a file type, not to read a secret; it is on the same denylist-bypass lineage as the rest of this file. Reporter zer0d4y5. - GHSA-9jrq-w75r-8gcw — Low 2.1. Dev servers in middleware mode that pass the unmodified browser request URL to
transformIndexHtmlalongside inline module scripts could be made to execute "JavaScript from the attacker server … in the Vite page" through a crafted URL whose traversal sequences the browser reads as a query and Vite as a path. Reporter deevashwer.
Fix line: vite 6.4.4 / 7.3.7 / 8.1.6 / 8.2.4 / 8.3.3 (npm latest 8.3.3 on 2026-10-06), vite-plus 1.1.0. By the vendor's own index that is the ninth and tenth server.fs boundary bug since April 2025; the guidance at the top of this file stands — the mass scanning F5 Labs documented in September is for the WebSocket read and the older deny bypasses, and the mitigation for all of them is the same: do not expose the dev server, and set server.fs.allow to the project.
Sources #
- F5 Labs — Cloud Takeover: Mass Scanning for Exposed Vite Endpoints (CVE-2026-39364) — fetched 2026-09-14 for the 2026-09-14 update; published 2026-09-11: event/session counts, the August-vs-prior-quarter comparison, targeted file categories, source-country breakdown, the query-suffix technique.
- CISA — Known Exploited Vulnerabilities Catalog (JSON feed) — fetched 2026-09-14: no Vite entry as of this date.
- GitHub Advisory Database — GHSA-p9ff-h696-f583 (CVE-2026-39363, Vite arbitrary file read via dev server WebSocket)
- GitHub Advisory Database — GHSA-v2wj-q39q-566r (CVE-2026-39364, Vite server.fs.deny bypassed with queries)
- NVD — CVE-2026-39365 (Vite source-map path traversal)
- SentinelOne Vulnerability Database — CVE-2026-39363
2026-09-15 update source:
- Vite — GHSA-fx2h-pf6j-xcff: server.fs.deny bypass on Windows alternate paths (CVE-2026-53571) — fetched 2026-09-15; CVSS 8.2, affected/patched ranges, the ::$DATA example, CWE-22/58/69/200; the Vite advisory index for the bypass history.
- GHSA-rq7h-c2jc-7f22 — Files outside server.fs.allow could be served when project paths match system paths on non-Windows machine — fetched 2026-10-06: 6.3 (4.0), affected and patched lines as listed, the fsPathFromUrl / safeModulePaths mechanism, the three conditions, reporter Kushalkhemka, published 2026-10-06.
- GHSA-vfpm-58rq-9qcg — First 4 bytes of files outside of server.fs setting is exposed by ?vite-wasm-instance — fetched 2026-10-06: 6.3, 8.2.0 – 8.3.2 → 8.2.4 / 8.3.3, vite-plus 0.2.8 – 1.0.0 → 1.1.0, CWE-22/200/209, reporter zer0d4y5.
- GHSA-9jrq-w75r-8gcw — Cross origin script execution through Vite custom middleware — fetched 2026-10-06: 2.1, middleware mode + transformIndexHtml + inline module scripts, CWE-80, reporter deevashwer.
- vitejs/vite — security advisories tab — fetched 2026-10-06: the three 10-06 entries newest; npm registry — vite latest 8.3.3.