TL;DR

A malicious extension impersonating a Solidity language-support plugin (juannegro.solidity) was published to Open VSX on 2026-05-01 and pulled within hours — but ByteDance's TRAE IDE marketplace kept serving it through at least 2026-07-18 because TRAE never synchronized Open VSX's takedown. The extension drops a cross-platform (Windows/macOS/Linux) backdoor whose command-and-control configuration lives on an Ethereum smart contract, letting the attacker redirect every infected host to a new C2 server by sending a blockchain transaction — no extension update, no new package, nothing for a registry to take down.

What happened

X user @Will42W publicly flagged the extension on 2026-07-17; SlowMist's MistEye threat-intelligence team confirmed and analyzed it, publishing a technical writeup the next day.

  • Extension: juannegro.solidity v0.0.189 (VSIX SHA-256 ff943371750ecd2ce6caa50c12d673e82743bdbc9569552eebfa98ccb2f4ac69), impersonating Solidity language-support tooling to bait blockchain/smart-contract developers — a recurring target demographic for this style of campaign (Datadog's unrelated MUT-9332 cluster targeted Solidity developers via different fake VS Code extensions in 2025; no confirmed link between the two actors beyond the shared victim profile).
  • Delivery: published to Open VSX 2026-05-01, removed by Open VSX within hours the same day. TRAE's own IDE marketplace did not propagate that removal and continued distributing v0.0.189 as of the 2026-07-18 confirmation — over ten weeks after Open VSX pulled it.
  • Activation: fires automatically on IDE startup via the onStartupFinished VS Code extension-activation event — no user action beyond having the extension installed.
  • Payload: a cross-platform dropper (hash-obfuscated child_process.exec calls) that establishes OS-specific persistence — ~/Library/LaunchAgents/ on macOS, a systemd user service on Linux, Windows Registry Run keys plus attempted Windows Defender exclusions — then opens a remote shell and fetches second-stage payloads.
  • The novel part — on-chain C2: the dropper reads its C2 configuration from a deployed Ethereum smart contract (0xf8a900db50b3331be6b768ba460bb59f3e40c344, owner wallet 0xFd3fc58bcbd8ccc77b6000201438eDfc636E7cA7) via two contract functions — param1() returns the current remote-shell address for macOS/Linux, param2() returns the current Windows payload-download URL. Infected hosts query public Ethereum RPC endpoints to read these values, so the attacker updates every infected host's C2 destination by sending a normal on-chain transaction, with no need to touch the extension package again. On-chain transactions confirm the attacker exercised this: the contract was deployed 2026-03-14, and C2 parameters were updated 2026-05-03 and again 2026-05-16 — weeks after the initial publish, while the extension sat live and undetected.

This generalizes the Solana-memo and Solana-mainnet-JSON-RPC dead-drop C2 techniques this repo already tracks (GlassWorm, GlassWASM) to a different chain (Ethereum) and a different mechanism (a queryable smart-contract getter rather than a transaction-memo field) — and, unlike a registry takedown, removing the malicious extension from one marketplace does nothing to the C2 channel or to hosts already infected via a marketplace (TRAE) that didn't sync the removal.

Am I affected?

# Check for the malicious extension across VS Code-family editors and TRAE
find ~/.vscode* ~/.trae* ~/.cursor* ~/.windsurf* -iname "*juannegro*solidity*" 2>/dev/null

# Verify VSIX hash if you find a matching extension directory
shasum -a 256 <path-to-extension>/*.vsix 2>/dev/null
# Compare against: ff943371750ecd2ce6caa50c12d673e82743bdbc9569552eebfa98ccb2f4ac69

# Persistence check (macOS)
ls -la ~/Library/LaunchAgents/ 2>/dev/null

# Persistence check (Linux)
systemctl --user list-unit-files 2>/dev/null | grep -iv '^UNIT'

# Persistence check (Windows, run in PowerShell)
Get-ItemProperty HKCU:\Software\Microsoft\Windows\CurrentVersion\Run

# Network IOCs to check against firewall/proxy logs
# 107.189.27.46:4912, 107.189.27.46:3000, 91.108.240.156:4912, 107.189.16.215:4912

If you use TRAE IDE and have Solidity tooling installed, check specifically — this is the only confirmed still-live distribution channel as of this sweep. Open VSX itself already removed the package.

IOCs

Type Value
Malicious extension juannegro.solidity v0.0.189
VSIX SHA-256 ff943371750ecd2ce6caa50c12d673e82743bdbc9569552eebfa98ccb2f4ac69
Ethereum C2 contract 0xf8a900db50b3331be6b768ba460bb59f3e40c344
Contract owner wallet 0xFd3fc58bcbd8ccc77b6000201438eDfc636E7cA7
C2 IPs 107.189.27.46:4912, 107.189.27.46:3000, 91.108.240.156:4912, 107.189.16.215:4912
macOS binary hash 80d2672e2599732d3c0ae2a4cd0d1e3fe4d555a60273ce33feb99db3f34d250f
Linux amd64 binary hash 9b73e7cd4e1425e770392549d8df46c706139ef476f4f7b9ac405165dc8d9696

If you are affected

→ playbooks/if-an-mcp-server-was-malicious.md — same "untrusted code ran with your privileges" blast-radius logic applies to a malicious extension. → playbooks/rotating-cloud-credentials.md — treat any host that ran this extension as fully compromised (arbitrary shell access) and rotate everything reachable from it, including crypto wallet keys given the Solidity-developer targeting. 1. Uninstall the extension and kill any established remote-shell session. 2. Remove the OS-specific persistence artifacts listed above. 3. Because C2 is a live smart contract the attacker can still update, don't assume "the extension is gone" means the threat is inert — check for outbound connections to the C2 IPs above and to any new addresses the contract's param1()/param2() might now return.

Prevention

→ prevention/package-vetting-checklist.md — treat any IDE extension marketplace, including ones bundled into a VS Code fork, as an untrusted package source. - If your IDE is a VS Code fork with its own bundled extension marketplace (TRAE, Cursor, Windsurf, and others), don't assume a takedown on Open VSX propagates to it. Confirm with the fork vendor whether removals sync automatically; this incident shows at least one major fork does not. - Blockchain-based C2 (Solana memos, Ethereum contract storage) cannot be taken down by a registry, domain seizure, or IP block — the only durable defense is not running the malicious code in the first place. Vet extension publishers and be suspicious of niche-language tooling (Solidity, Rust, etc.) from unfamiliar or newly created publisher accounts.

Sources

Sourcing note: this incident is corroborated only by SlowMist's own writeup as of this sweep (the original report came from X user @Will42W, whose post SlowMist's analysis references but which was not independently fetched here). No independent security-research or aggregator coverage of this specific juannegro.solidity/TRAE incident was found — distinct from the unrelated, earlier MUT-9332 Solidity-developer-targeting campaign (Datadog Security Labs, 2025) which used different extensions and a different actor. Marked unconfirmed per this repo's two-independent-source standard for full advisories.