MLflow — unauthenticated SSRF (9.3) and authorization bypasses fixed in 3.15.0; scorer RCE (9.8) and CrewAI key leak fixed in 3.17.0
TL;DR #
MLflow — the de facto standard open-source ML experiment-tracking and model-registry server that AI/vibe-coding teams stand up to log runs, artifacts, and model versions — shipped three CVEs in one coordinated batch (2026-08-02, -04, and -17). The headline: CVE-2026-64849 (CVSS 9.3, critical) lets an unauthenticated attacker abuse the model-registry webhook-test endpoint as a full-read SSRF into your internal network and cloud metadata service (169.254.169.254), by redirecting past MLflow's own SSRF guard. Two more CVEs (CVSS 8.6 and unrated-high) let authenticated users read another user's private artifacts and inject fake data into another user's experiment runs by exploiting authorization gaps in newer FastAPI-based endpoints that the older Flask-based auth middleware never learned to protect. All three are fixed in MLflow 3.15.0. Update 2026-11-01: two more advisories, an unauthenticated RCE through third-party scorer deserialization (CVE-2026-116692, 9.8, affects >= 3.12.0rc0) and a CrewAI autologging path that writes provider API keys into trace spans (CVE-2026-116691), are fixed only in 3.17.0. The safe line is now 3.17.0 or later, and any provider key that passed through a CrewAI agent while mlflow.crewai.autolog() was on needs rotation.
What happened #
MLflow's default Tracking Server exposes a model-registry webhooks API. Its POST /api/2.0/mlflow/webhooks/{id}/test endpoint is unauthenticated by default and synchronously fetches the webhook URL, returning the upstream response status and body straight back to the caller — a textbook full-read SSRF primitive if the target-URL validation can be bypassed.
CVE-2026-64849 (GHSA-7gwp-5pfp-969j, CVSS 9.3, critical, published 2026-08-02). MLflow added an SSRF guard (_validate_webhook_url, shipped in PR #20747 / MLflow 3.10.0) that resolves the webhook hostname and rejects anything that resolves to a non-public IP. The guard has two gaps: it doesn't set allow_redirects=False on the outbound request, and it never re-validates or pins the IP after the initial DNS resolution. An attacker hosts a public HTTPS endpoint that passes the initial hostname check, then responds with 302 Location: http://169.254.169.254/latest/meta-data/iam/security-credentials/... (or http://127.0.0.1:<port>/...) — MLflow follows the redirect without re-checking it, and because /test reflects the full response body back to the (unauthenticated) caller, this is a complete, unauthenticated cloud-metadata and internal-service read primitive against any default-configured MLflow Tracking Server. A DNS-rebinding variant achieves the same bypass without needing a redirect. Fixed in 3.15.0.
CVE-2026-69148 (GHSA-gqch-g4w5-7qcw, high, published 2026-08-04). The _validate_source_run/_validate_source_model checks in mlflow/server/handlers.py verify that a model version's source path stays within the referenced run's or logged model's artifact directory — but never check whether the calling user has READ permission on that run or model in the first place. An authenticated user can pass another user's run_id to CreateModelVersion, creating a model version whose artifact URI points into the victim's private artifact directory, then read the victim's files via GET /model-versions/get-artifact without ever holding permission on the source run. A broken-object-level-authorization (BOLA) bug in the model registry. Fixed in 3.15.0.
CVE-2026-69146 (GHSA-3p64-6gvh-82v5, moderate, published 2026-08-04). When MLflow runs with the built-in basic-auth plugin, its before-request authorization hook checks a fixed map of proto handlers that require per-run permission checks. The LogInputs handler (POST /api/2.0/mlflow/runs/log-inputs) is missing from that map entirely, so the hook skips authorization on it — any authenticated user can inject arbitrary dataset-lineage records into another user's run with no permission check at all. Fixed in 3.15.0.
All three advisories were reported by the same researcher (GitHub handle PattaraS) and disclosed via MLflow's own GitHub Security Advisories, confirmed independently on the GitLab Advisory Database and Rapid7's vulnerability database with matching CVE IDs, CVSS scores, and affected-version ranges. As of this writing none of the three appear in CISA's Known Exploited Vulnerabilities catalog. The two authorization-bypass CVEs share a root cause worth generalizing: MLflow's server has grown a mix of legacy Flask-routed endpoints and newer FastAPI-routed endpoints (jobs, tracing, some registry actions), and its authorization middleware — built for the Flask routing table — doesn't automatically cover new FastAPI routes added later. This is the same "two systems, one app, inconsistent enforcement" shape this repo has flagged before for FastAPI/Starlette apps generally (see the BadHost advisory) — any team adding new API surface to an MLflow-adjacent or similarly mixed-framework server should check that the authorization layer was updated in step.
Am I affected? #
# Check your installed MLflow version
python -c "import mlflow; print(mlflow.__version__)"
pip show mlflow 2>/dev/null | grep Version
# You are affected if you run a self-hosted MLflow Tracking Server < 3.17.0
# (the August batch is fixed at 3.15.0; the scorer RCE CVE-2026-116692 and the CrewAI key leak CVE-2026-116691 only at 3.17.0)
# Especially high risk if:
# - the server is reachable from outside your trusted network (CVE-2026-64849 needs no auth at all)
# - you run it with --app-name basic-auth and multiple users/teams share one server
# (CVE-2026-69148 / CVE-2026-69146 need only an authenticated but low-privileged account)
# Check whether your MLflow server is internet- or LAN-reachable
curl -s -o /dev/null -w "%{http_code}\n" http://<your-mlflow-host>:5000/api/2.0/mlflow/webhooks/1/test
If your MLflow server runs on cloud infrastructure (AWS/GCP/Azure), a pre-3.15.0 instance with any network reachability to the webhook-test endpoint should be treated as a live cloud-credential-theft risk, not a theoretical one — the same class of unauthenticated-SSRF-to-IMDS bug has been used for full account/cluster takeover in other tools this repo tracks (e.g. Starlette BadHost-derived apps).
If you are affected #
- Upgrade to MLflow ≥ 3.17.0. The three August CVEs are fixed in 3.15.0; the October scorer-deserialization RCE and the CrewAI key leak are fixed only in 3.17.0 (3.17.2 is current as of 2026-11-01).
- If
mlflow.crewai.autolog()was enabled on any version from 2.19.0 to 3.16.x, rotate every LLM provider key the CrewAI agents used and delete or redact the affected traces; the keys are in the trace store in clear. - If you can't upgrade immediately, put the Tracking Server behind a network boundary that blocks unauthenticated inbound access, and block outbound requests from the MLflow process to link-local/metadata addresses (
169.254.169.254,127.0.0.1, RFC1918 ranges) at the network layer as a stopgap — don't rely on the application-layer guard alone, since that's exactly what these CVEs bypass. - If you run
basic-authmode, audit model-registry and run history for artifacts or dataset records you don't recognize — CVE-2026-69148/-69146 leave no obvious crash or error, just quiet cross-user data access. - Treat any cloud IAM role attached to the host running MLflow as compromised if you can't rule out pre-patch exploitation of CVE-2026-64849, and rotate accordingly.
→ playbooks/rotating-cloud-credentials.md → playbooks/if-your-webapp-was-compromised.md
Prevention #
→ prevention/supply-chain-attack-surface.md
- Never expose an ML experiment-tracking or model-registry server directly to the internet; MLflow's own auth options are opt-in, not default-on.
- When mixing web frameworks in one server process (Flask + FastAPI, as MLflow does), treat every new route addition as a checklist item to confirm it's covered by the authorization middleware — don't assume coverage is automatic just because older routes are protected.
- Block outbound requests to 169.254.169.254 and other metadata/loopback addresses from any process that fetches user- or webhook-supplied URLs, as defense in depth against SSRF-guard bypasses like this one.
Update — 2026-08-19: CISA adds CVE-2026-64849 to the Known Exploited Vulnerabilities catalog #
Confirmed directly in CISA's KEV feed (catalogVersion 2026.08.21): CVE-2026-64849, listed as "MLflow Server-Side Request Forgery Vulnerability", dateAdded 2026-08-19, dueDate 2026-09-02.
This moves the unauthenticated webhook-test SSRF from "critical but no public exploitation reported" to confirmed exploited in the wild, seventeen days after the fix shipped in MLflow 3.15.0. Federal civilian agencies have a 2026-09-02 remediation deadline under BOD 26-04; everyone else should read the KEV listing as evidence that the window for an unhurried upgrade has closed.
This advisory's status is therefore changed from patched to active — the vendor fix exists and is complete, but attackers are using this against unpatched instances now. If your MLflow Tracking Server has any network reachability beyond a fully trusted host and is not on 3.15.0+, treat it as a live incident rather than a scheduled upgrade: the exploit is a single unauthenticated request that reflects cloud-metadata responses straight back to the caller, so assume credential theft rather than merely probing.
Update — 2026-09-16 (logged 2026-09-21): CERT/CC VU#369093 — the MLFLOW_ALLOW_PICKLE_DESERIALIZATION safety control is bypassed by two model flavors; statsmodels fixed in 3.15.0 (GHSA-gqvg-gmmx-x4hm, CVSS 8.8), dspy still unpatched #
CERT/CC published VU#369093 on 2026-09-16 (reporter Prasanna Dabi; vendor notified 2026-08-07, status Unknown, "MLFlow could not be reached to coordinate"). MLflow's MLFLOW_ALLOW_PICKLE_DESERIALIZATION control is meant to refuse pickle loads when a user sets it to false; two flavors ignore it. The statsmodels flavor "does not apply the control" at all — a crafted MLmodel artifact loaded through mlflow.pyfunc.load_model() executes code regardless of the setting; MLflow's own advisory GHSA-gqvg-gmmx-x4hm (published 2026-07-27, CVSS 8.8, AV:N/PR:N/UI:R, affected ≥ 2.1.0 < 3.15.0, no CVE) fixed that in 3.15.0, the same release as the three CVEs above. The dspy flavor "conditionally applies the control based on the model path's file extension" — a path that does not end in .pkl, even when the file is a pickle, "will route to a separate branch for pickle deserialization, bypassing the safety control"; CERT/CC confirmed this against 3.12.0 and lists no fix. Impact is RCE on whatever loads the model; the precondition is write access to any location a user obtains MLflow models from — a registry, an artifact store, a shared bucket. CERT/CC's interim guidance: upgrade to ≥ 3.15.0 for statsmodels, and until a dspy fix ships, do not load models through the dspy flavor if you rely on the pickle block. For this audience the point is the one this file already makes: the model registry is a code-execution surface, and a setting whose name promises "no pickle" is only as good as every flavor honouring it.
Update — 2026-11-01: two more MLflow advisories reviewed by the database on 2026-10-27, CrewAI autologging writes provider API keys into trace spans (CVE-2026-116691, 6.5) and an unauthenticated RCE through third-party scorer deserialization (CVE-2026-116692, 9.8), both fixed in 3.17.0; nine ZDI records on 2026-10-29 #
Two vendor advisories from October reached the GitHub Advisory Database's reviewed listings on 2026-10-27, and both matter to people who wire an agent framework into MLflow rather than to MLflow operators alone.
GHSA-j7qq-vr8c-xvw3, CVE-2026-116691, Moderate, CVSS 3.1 6.5 (AV:N/AC:L/PR:L/UI:N/S:U/C:H/I:N/A:N), published to mlflow/mlflow 2026-10-13, CVE published by the GitHub CNA 2026-10-27, reporter IdoGol24. When mlflow.crewai.autolog() is on, MLflow serializes CrewAI Agent objects into span attributes and span inputs, and the agent's LLM object carries its API key in its string form, so the provider key lands in trace telemetry that the developer never asked to log. MLflow's dedicated LLM attribute extraction already excluded the key; the broader serialization path, through _get_agent_attributes() and _construct_full_inputs(), bypassed it. Affected mlflow >= 2.19.0 < 3.17.0, fixed 3.17.0, which reduces LLM objects to the model name and drops credential-like keys. The advisory tells users who ran affected versions to rotate exposed keys and delete or redact the traces, and offers mlflow.crewai.autolog(disable=True) until the upgrade. For this audience the trace store is one more place a provider key is written in clear, readable by anyone with tracking-server access, which on the default unauthenticated server is everyone who can reach it.
GHSA-26p8-2jq9-3vq9, CVE-2026-116692, Critical, CVSS 3.1 9.8 (AV:N/AC:L/PR:N/UI:N/S:U/C:H/I:H/A:H), published to mlflow/mlflow 2026-10-09, CVE published 2026-10-27, reporter mskca. On servers without authentication, a caller can influence which Python modules the server imports while deserializing third-party scorers, and the server instantiates the resulting class; the advisory rates this as code execution as the server process on default deployments. Affected >= 3.12.0rc0 < 3.17.0, fixed 3.17.0 (PR #25906, commit a732443). pip index versions mlflow on 2026-11-01 lists 3.17.2 as current.
ZDI records of 2026-10-29. The Zero Day Initiative's published-advisories index lists nine MLflow entries dated 2026-10-29, ZDI-26-839 through ZDI-26-847: a PickleEvaluationArtifact deserialization RCE (7.8), three tracking-server missing-authorization issues (5.4 to 6.3), a SHAP load_explainer deserialization RCE (7.8), a get-artifacts SSRF (8.2), a statsmodels _load_model deserialization RCE under a 2024-dated id (7.8), the webhook SSRF (6.8) and an AI Gateway SSRF (7.7). The webhook row is CVE-2026-64849, the KEV-listed flaw above, which the vendor scored 9.3 and ZDI scores 6.8. The other eight CVE ids are deliberately not written here: the ZDI pages and CNA records were not opened, so no affected range or fix is known for them, and writing the ids would make the corpus index treat them as tracked. Whether the 2024-dated statsmodels row is the flavor bypass of the 09-21 update (whose vendor advisory GHSA-gqvg-gmmx-x4hm says no CVE) was not checked. A later sweep should open ZDI-26-839 to ZDI-26-847 and file what they say.
Status stays active, because CVE-2026-64849 is still in KEV and the new RCE is unauthenticated on the default server. The action is unchanged in direction and larger in scope: MLflow 3.17.0 or later, authentication in front of the tracking server, and now a rotation of every provider key that passed through a CrewAI agent while autologging was on.
Sources #
- CERT/CC — VU#369093: MLflow dspy and statsmodels flavors bypass pickle deserialization control — fetched 2026-09-21; 2026-09-16: both bypass mechanisms, the 3.12.0 confirmation, vendor notified 08-07 / status Unknown, the
statsmodelsfix in ≥ 3.15.0 and the unfixeddspypath, interim guidance, credit. - GitHub Advisory Database — GHSA-gqvg-gmmx-x4hm: MLFLOW_ALLOW_PICKLE_DESERIALIZATION=False safety control bypassed by mlflow.statsmodels flavor — fetched 2026-09-21; published 2026-07-27, CVSS 8.8, affected ≥ 2.1.0 < 3.15.0, fixed 3.15.0, PR #24686, no CVE.
- GitHub Security Advisory — GHSA-7gwp-5pfp-969j: Unauthenticated full-read SSRF in MLflow webhook delivery — primary source for CVE-2026-64849: mechanism, CVSS 9.3, affected/patched versions.
- GitHub Security Advisory — GHSA-gqch-g4w5-7qcw: CreateModelVersion source validation does not check READ permission on referenced run_id — primary source for CVE-2026-69148.
- GitHub Security Advisory — GHSA-3p64-6gvh-82v5: LogInputs endpoint bypasses per-run UPDATE authorization in MLflow basic-auth — primary source for CVE-2026-69146.
- GitLab Advisory Database — CVE-2026-64849 — independent corroboration of CVSS score, mechanism, and patched version.
- Rapid7 Vulnerability & Exploit Database — CVE-2026-64849 — independent corroboration.
- CISA — Known Exploited Vulnerabilities catalog (JSON feed, catalogVersion 2026.08.21) — added 2026-08-21, fetched directly: confirms CVE-2026-64849 KEV entry, dateAdded 2026-08-19, dueDate 2026-09-02.
- 2026-11-01 update sources — GitHub Advisory Database — GHSA-j7qq-vr8c-xvw3: MLflow CrewAI autologging records LLM provider API keys in logged trace spans (fetched 2026-11-01: CVE-2026-116691, 6.5 with vector, >= 2.19.0 < 3.17.0, fixed 3.17.0, vendor 2026-10-13, database 2026-10-27, the two leak paths, the rotation and
disable=Trueguidance, reporter IdoGol24, PR #25845, commit 20927930); GitHub Advisory Database — GHSA-26p8-2jq9-3vq9: MLflow vulnerable to remote code execution on unauthenticated servers via third-party scorer deserialization (fetched 2026-11-01: CVE-2026-116692, 9.8 with vector, >= 3.12.0rc0 < 3.17.0, fixed 3.17.0, vendor 2026-10-09, database 2026-10-27, reporter mskca, PR #25906, commit a732443); CVE Services — CVE-2026-116691 and CVE-2026-116692 (queried 2026-11-01: GitHub CNA, both published 2026-10-27, 6.5 and 9.8); Zero Day Initiative — published advisories (fetched 2026-11-01: the nine MLflow rows dated 2026-10-29, ZDI-26-839 to ZDI-26-847, with titles and scores as listed above; only the webhook row's CVE id is repeated here); reviewed-critical pip listing and llm listing (fetched 2026-11-01: the 10-27 rows);pip index versions mlflow(queried 2026-11-01: 3.17.2 current, 3.17.0 present).