TL;DR

PolinRider is an ongoing, DPRK-linked ("Contagious Interview"/Famous Chollima) supply-chain campaign that takes over maintainer accounts across npm, Packagist (PHP/Composer), Go modules, and at least one Chrome extension, then plants obfuscated JavaScript loaders — hidden in fake .woff2 font files, config files, or VS Code folderOpen tasks — that fetch and eval() second-stage payloads from blockchain/RPC infrastructure. As of this sweep, over 100 packages/extensions and 1,900+ GitHub repositories have been implicated, and the campaign is still active.

What happened

First flagged by the OpenSourceMalware team around 2026-03, PolinRider involves DPRK-linked threat actors — tied to the broader Contagious Interview / Famous Chollima developer-targeting cluster — compromising open-source maintainer accounts (via credential theft, not registry-side bugs) and using that access to plant obfuscated JavaScript payloads directly into legitimate repositories (The Hacker News, Socket).

Concealment technique: payloads are hidden via whitespace-padding (pushing code beyond the visible editor width), embedding in config files (vite.config.js and similar), or disguised as fake .woff2 font files, then wired to auto-execute via a VS Code task file configured with "runOn": "folderOpen" — meaning simply opening the poisoned repo folder in VS Code triggers the payload, no npm install required. The threat actors also rewrite Git history and force-push to backdate malicious commits, making the compromise harder to spot in a normal git log review — one Packagist compromise reportedly used antedated January 8 commits with a May 16 cleanup attempt to cover tracks (Socket).

Execution chain: the loader reaches out to blockchain and public RPC infrastructure (TRON, Aptos, BNB Smart Chain) to retrieve an encrypted second-stage payload, decrypts it with an embedded XOR key, and executes the result with eval(). Observed follow-on payloads include DEV#POPPER (command execution + socket.io-client-based C2) and OmniStealer (credential theft, browser-data theft, wallet exfiltration) (Socket). A related, merged activity cluster called TaskJacker specifically drops malicious VS Code task files into victims' existing repositories (The Hacker News).

Scale (as of 2026-07-01, per The Hacker News): 108 unique packages/extensions across 162 release artifacts — 19 npm packages, 10 Composer/Packagist packages, 61 Go modules, and 1 Chrome extension. Socket's independent tracking (as of the same period) counted 80 Go modules, 10 Packagist packages, 1 Chrome extension, plus additional npm packages — the exact per-ecosystem counts vary slightly by tracker as the campaign is still growing; both sources agree the campaign spans all four ecosystems and remains active. As of 2026-04-11, the broader activity (including the pre-PolinRider BeaverTail-loader phase) had touched 1,951 public GitHub repositories across 1,047 unique maintainer accounts (The Hacker News). A confirmed recent wave hit GitHub user Xpos587's repositories (git2md, markfetch) and organization 7span/Packagist namespace sevenspan (react-list) with synchronized modifications around 2026-06-23 10:00 UTC (Socket).

Status: ongoing. Socket explicitly tracks this as a live, growing campaign at a dedicated tracking page, with new compromises surfacing regularly.

Researcher outlet OpenSourceMalware published an analysis (ChainVeil and ViteVenom are DPRK's PolinRider Campaign, 2026-07-17) arguing that the ChainVeil (May–June 2026, Tailwind CSS/Sass typosquats) and ViteVenom (June–July 2026, Vite typosquats) npm campaigns — see the new standalone writeup at 2026-07-chainveil-vitevenom-npm-blockchain-c2.md — share blockchain-wallet infrastructure with PolinRider, based on wallet addresses OpenSourceMalware says it had independently tracked before either campaign's public report. This is a contested claim, not a confirmed one: Checkmarx Zero, the primary researcher who discovered and named both ChainVeil and ViteVenom, attributes them to a distinct operator it calls "SuccessKey" and makes no DPRK or PolinRider attribution in either of its own writeups. Noting the dispute here rather than merging the campaigns — a single party's claimed infrastructure overlap is not sufficient to override the original discoverer's own attribution.

Update 2026-11-27: repository counts and file names from SafeDep and The Hacker News

SafeDep reported on 2026-11-24 that 375 public GitHub repositories owned by 260 accounts held a Python loader from this campaign, 370 of them pushed in November 2026. SafeDep says no PyPI or npm package carries that loader. The Hacker News reported on 2026-11-26 that Apiiro estimates at least 7,609 repositories owned by 2,330 accounts. The Apiiro post was not opened for this file.

What to look for in a repository, per SafeDep:

Where Name
repository root or a subfolder conftest.py you did not write
a utils, lib, helpers, common or shared folder session.py, transport.py, clients.py, http_session.py, net.py
repository root api.js, and a package.json whose build or dev script runs node api.js
test configuration jest.config.js with code appended at the end

SafeDep says commit dates on affected repositories are forged, so check the full history and the GitHub Activity log.

npm package names The Hacker News lists, citing OpenSourceMalware: itsa-utils 1.4.2, itsa-jsext 2.0.3, itsa-react-docviewer 16.1.2, itsa-cli 16.5.3, itsa-react-button 16.0.11, itsa-react-maskedinput 16.1.2, itsa-react-checkbox 16.0.5, itsa-react-focuscontainer 16.0.10, itsa-react-input 16.1.2. It lists these without versions: @adminide-stack/utils, @adminide-stack/health-api-server, @adminide-stack/user-activity-browser, @adminide-stack/forms-core, @adminide-stack/yantra-help-browser, server-hemera-mongo, cdeops, @cdmbase/wiki-browser and @pubngo-stack/help-browser. It also names the VS Code extension huntrole.assessment-tool. Registry state for these names was not checked for this file.

If you ran pytest, a start command, npm run build, npm run dev or Jest in an affected repository, SafeDep says to treat the machine as compromised. Rebuild it, then replace GitHub tokens and SSH keys, environment secrets, browser-saved passwords and wallets.

Am I affected?

# Audit for VS Code auto-run tasks that trigger on folder open — a key PolinRider persistence primitive
grep -r '"runOn"\s*:\s*"folderOpen"' .vscode/tasks.json 2>/dev/null

# Look for unexpected .woff2 files outside font/asset directories, and check recently
# force-pushed history on dependencies you maintain or heavily rely on
git log --all --source --diff-filter=A -- '*.woff2' 2>/dev/null

# Review GitHub Activity logs (not just `git log`) for force-pushes to any repo you
# maintain or depend on — history rewriting is a core part of this campaign's cover-up

You're at risk if you cloned or opened (in VS Code) a repository maintained by an account named in ongoing PolinRider disclosures, or if a dependency you use was published from a compromised maintainer account during the exposure window. Check Socket's live tracking page for currently-known affected packages before assuming you're clear, since the list changes frequently.

If you are affected

  1. Do not open a suspected-poisoned repository folder in VS Code until you've inspected .vscode/tasks.json and any .woff2/config files for obfuscated content.
  2. If you already opened an affected repo or installed an affected package, treat the machine as compromised — DEV#POPPER and OmniStealer target credentials, browser data, and crypto wallets. Follow playbooks/if-you-ran-malicious-postinstall.md and playbooks/if-you-installed-a-bad-npm-package.md.
  3. Rotate credentials and treat any crypto wallets accessed from that machine as compromised, per playbooks/rotating-cloud-credentials.md.
  4. If you maintain a package/repo, audit your account's recent push history via the GitHub Activity log (not just git log, since history can be rewritten) for force-pushes you didn't make, and rotate your GitHub credentials/tokens and enable MFA.

Prevention

  • Disable or review VS Code "runOn": "folderOpen" tasks by default in untrusted repositories — this is now a documented auto-execution primitive across multiple campaigns (see also the Miasma Wave 5 hook-auto-execution class). See prevention/agent-sandboxing.md.
  • Enforce MFA and hardware security keys on maintainer accounts across every registry you publish to (npm, Packagist, Go module proxies, Chrome Web Store) — account takeover, not a registry vulnerability, is the entry point here.
  • Prefer reviewing GitHub's Activity/audit log over git log alone when auditing a dependency's recent history, since this campaign relies on rewritten/force-pushed commits.
  • See prevention/supply-chain-attack-surface.md and prevention/package-vetting-checklist.md for routine cross-ecosystem dependency hygiene.

Update 2026-10-01 — the loader now reads its C2 from Ethereum mainnet transactions, and SafeDep finds it live at HEAD in 35 GitHub repositories (7,578 stars) — surfaced by a rejected pull request against oxc that a formatting bot un-minified

SafeDep (2026-09-30) reports a new PolinRider loader variant whose C2 discovery works like NullReceiver: it reads Ethereum mainnet for small transactions from an operator wallet and decodes each transaction's recipient address as a C2 IP. Two operator wallets use the scheme — one sending a transaction roughly every 51 minutes since 2026-06-23, the other every ~3.3 hours since 07-25 — and their public histories show 11 C2 servers, eight on one hosting provider (AS149440 Evoxt); two of the servers also appear in SafeDep's earlier astro.config.mjs and @joyfill investigations, which is the link back to this campaign. One infection writes two loaders into a project: the Ethereum one and a second keyed to a Tron address pair SafeDep had not seen in public reports; the OpenSSF malicious-packages database holds 70 npm/PyPI records containing the second wallet and none for the first.

Where it was found. A pull request against oxc-project/oxc (opened 09-14, branch rewritten 09-25) added the loader to 20 build, test, benchmark and code-generation scripts, each edit placed after 2,000 spaces on the last line (TypeScript files carried it as base64 inside eval(atob(…))), with the commit's author field forged to a real oxc maintainer and an author date ten weeks older than the commit. The maintainers did not merge it — the payload became visible only because the repository's autofix.ci formatting bot reformatted the one-line payload into 106 lines in the diff, and maintainer Boshen posted the screenshot on 09-30. GitHub has removed the contributor account; the commits remain reachable by SHA in the fork network. From that diff SafeDep decoded every stage statically and found 35 repositories carrying the loader at the tip of their default branch on 2026-09-30 (7,578 stars, 2,884 forks combined); the loader runs when a developer builds or starts the project.

What is new for defenders. (1) The "poison the repo, not the registry" branch of PolinRider has a pull-request delivery variant — a forged-author commit in a PR that touches scripts CI runs, aimed at a maintainer merging or a CI job building the branch; a bot that reformats code exposed it where human review of a 2,000-space line would not. (2) Blockchain dead-drop C2 now reaches repository-level DPRK tooling, so "block the known C2 IPs" is a losing control — the wallet is the durable indicator, and the on-chain history is a public log of every C2 the operator has ever used. (3) The 35 repositories are currently infected — a git clone && npm run build of any of them runs the loader. SafeDep's post lists them; this advisory does not reproduce the list or the wallet/IP indicators (see the repo's IOC policy) — read the post before building an unfamiliar JavaScript project with a large star count, and check CI for autofix-style diff expansion as a review aid.

# In any repository you are about to build: scripts with a very long trailing line, or eval(atob(...)) in TypeScript
grep -rlE '^.{2000,}$' --include='*.js' --include='*.mjs' --include='*.cjs' . 2>/dev/null | head
grep -rnE 'eval\(.*atob\(' --include='*.ts' --include='*.js' . 2>/dev/null | head
# PRs against your project that touch build/test/bench scripts with single-quoted imports where your code uses double quotes
git log --format='%h %an <%ae> %ad | %cn %cd' --date=short -- '*.js' '*.mjs' | awk '$0 ~ /\|/' | head   # author ≠ committer, author date far older than commit date

Sources