Claude Code network-sandbox SOCKS5 null-byte allowlist bypass (May 2026)
TL;DR #
Claude Code's network sandbox (the allowlist that's supposed to confine the agent to, say, *.google.com) could be bypassed with a SOCKS5 hostname null-byte injection: a host like attacker-host.com\x00.google.com passes the allowlist matcher (it sees the trailing .google.com) but the OS truncates at the \x00 and dials attacker-host.com. Every release from v2.0.24 (sandbox GA, 2025-10-20) through v2.1.89 was affected — ~130 versions over ~5.5 months. Anthropic silently fixed it in v2.1.90 (2026-04-01) with no changelog note, no CVE, and no advisory. Researcher Aonan Guan went public on 2026-05-20; it's the second such sandbox bypass he's reported.
What happened #
Claude Code's sandbox lets users restrict the agent's egress to an allowlist of domains. The allowlist check ran a string match on the requested hostname, then handed the hostname to a SOCKS5 proxy for the actual connection. The matcher and the OS resolver disagreed on where the hostname ended:
- Allowlist matcher: sees
attacker-host.com\x00.google.com, notes it ends in.google.com, approves. - OS / SOCKS5 dial: the C string terminates at the null byte, so it connects to
attacker-host.com.
Any code Claude Code could be induced to run (via prompt injection in a repo, MCP-delivered content, etc.) could use this to exfiltrate data straight past a user-configured allowlist — AWS creds from ~/.aws/, GitHub tokens from ~/.config/gh/, environment variables, model API keys, internal/intranet API responses — all over raw SOCKS5, which also sidesteps standard HTTP egress logging.
The fix in sandbox-runtime 0.0.43 (shipped with Claude Code v2.1.90, 2026-04-01) adds an isValidHost() wrapper that rejects \x00, %, CRLF, and other non-DNS characters before the allowlist matcher runs.
The disclosure friction is the story: Anthropic shipped the fix with no CVE, no advisory, and no changelog note, and didn't notify users who ran a wildcard allowlist during the 5.5-month window (Anthropic said its team had independently found and fixed it before Guan's report). This is the second silently-patched Claude Code sandbox bypass in ~5 months (the earlier one is tracked as CVE-2025-66479), continuing the quietly-shipped-fix cadence of the source-map leak era.
Am I affected? #
You were exposed if you relied on Claude Code's network allowlist as a security boundary on any version from v2.0.24 through v2.1.89, especially with a wildcard / broad allowlist.
# What version are you on? (≥ 2.1.90 is fixed)
claude --version 2>/dev/null
# Check the bundled sandbox-runtime (≥ 0.0.43 contains the isValidHost() fix)
grep -RIn '"version"' ~/.claude 2>/dev/null | grep -i sandbox
# If you keep them, scan agent/proxy logs for null-byte or odd hostnames around your usage window
grep -RIal $'\x00' ~/.claude/**/*.log 2>/dev/null
If you used the sandbox as a containment boundary on a vulnerable version while running untrusted repos or MCP content, treat any credential that was reachable from those sessions as potentially exfiltrated and rotate.
IOCs / version data #
| Type | Value |
|---|---|
| Mechanism | SOCKS5 hostname null-byte (\x00) injection past the allowlist matcher |
| Affected | Claude Code v2.0.24 → v2.1.89 (~130 versions, sandbox GA 2025-10-20) |
| Fixed | Claude Code v2.1.90 (2026-04-01), sandbox-runtime 0.0.43 (isValidHost()) |
| CVE | None assigned (silent fix; researcher tracks the prior bypass as CVE-2025-66479) |
| Researcher | Aonan Guan (oddguan.com) — public 2026-05-20 |
| Exfil surface | AWS/GitHub creds, env vars, API keys, intranet responses over raw SOCKS5 |
If you are affected #
→ playbooks/rotating-cloud-credentials.md → playbooks/if-your-github-pat-leaked.md
Prevention #
→ prevention/agent-sandboxing.md — and don't treat an in-tool allowlist as your only egress control. Enforce egress at the OS/network layer (firewall, proxy with its own validation) so a single in-app parsing bug isn't the whole boundary. → Upgrade Claude Code promptly and keep auto-update on; because Anthropic ships some security fixes silently, assume "latest" carries undisclosed fixes and don't pin old versions for long. See the Claude Code InversePrompt / May-2026 cluster and deeplink RCE.
Sources #
- The Register — Even Claude agrees: hole in its sandbox was real and dangerous
- SecurityWeek — Anthropic Silently Patches Claude Code Sandbox Bypass
- Aonan Guan — Second Time, Same Sandbox: Another Anthropic Claude Code Network Sandbox Bypass Enables Data Exfiltration
- Aonan Guan — CVE-2025-66479: Anthropic's Silent Fix and the CVE That Claude Code Never Got
- Cybersecurity News — Claude Code's Network Sandbox Vulnerability Exposes User Credentials and Source Code
- Cyberpress — Claude Code Sandbox Flaw Exposes Credentials and Source Code