npm 'bin entry harvesting' — 21 packages squat unscoped binary names exposed by Google-scoped npm packages (unconfirmed, single-source)
TL;DR #
SafeDep's research team reported that on 2026-08-12, an actor published 21 unscoped npm packages (bazelisk, gaarf, ngsw-config, upload-to-gcp, and 17 others) that squat the unscoped binary names exposed by legitimate Google-scoped packages' bin entries — a structural gap that standard dependency-confusion defenses (scoped publishing, registry allowlists, lockfile pinning) don't cover, because a scoped package's bin entry cannot itself carry the scope prefix. Each package's postinstall hook sent a minimal system-fingerprint beacon (hostname, platform, CPU arch, Node version) to a per-package C2 subdomain; all 21 were unpublished within roughly 32 seconds of each other about 3.5 hours after the first wave went live. This finding is currently single-sourced (SafeDep only, no independent corroboration found as of this sweep) — treat as unconfirmed pending a second source, per this repo's accuracy bar.
What happened #
Per SafeDep's writeup, a scoped package like @google-cloud/some-tool can declare a bin entry (e.g. bazelisk) that generates an unscoped executable name on $PATH once installed — because npm's bin field cannot itself carry the @scope/ prefix. An attacker who registers that same unscoped name as a standalone public package can get resolved instead of the intended scoped tool in certain dependency-resolution or global-install scenarios, since none of the usual dependency-confusion mitigations (which protect the package name, not the binary name it exposes) apply to this specific gap.
The campaign published 21 such packages in two waves on 2026-08-12 (13:23 UTC: gaarf, upload-to-gcp at v3.2.1; 16:57–16:59 UTC: the remaining 19 at v1.0.0), all squatting binary names associated with Google-affiliated tooling: bazelisk, broadcast-graphics-mcp, chrome-enterprise-premium-mcp, chromecast-webdriver-cli, chromeos-webdriver-cli, code-assist-mcp, gaarf, gaarf-bq, gaarf-node, gaarf-node-bq, gemini-cli-a2a-server, github-policy-bot, karma-proxy, localize-extract, localize-translate, ngsw-config, tfjs-inference, tizen-webdriver-cli, upload-to-gcp, wct-st, xbox-one-webdriver-cli. All 21 were unpublished by the same npm account within a 32-second window at 17:22 UTC the same day. The postinstall payload was reconnaissance-only — a system fingerprint POST to a package-specific subdomain — not a credential stealer, consistent with this repo's existing "reconnaissance-only payload as first-stage precursor" triage pattern (see the npm dependency confusion recon campaign).
IOCs (per SafeDep, unverified independently): npm publisher rootdaddy-msrc (ayyitscompton@gmail.com, author field r00tdaddy); C2 pattern *.instances.poc.jchunt[.]top; apex domain jchunt[.]top (Cloudflare-hosted); C2 IP 152.53.138.110.
Am I affected? #
npm ls bazelisk gaarf ngsw-config upload-to-gcp 2>/dev/null
grep -RE '"(bazelisk|gaarf|gaarf-bq|gaarf-node|gaarf-node-bq|ngsw-config|upload-to-gcp|localize-extract|localize-translate|karma-proxy|code-assist-mcp|gemini-cli-a2a-server)"' package.json package-lock.json 2>/dev/null
All 21 packages were removed from the registry within hours of publication, so a fresh npm install today should not resolve them — but check your lockfile history / CI cache for any install that happened during the ~4-hour window on 2026-08-12 (UTC 13:23–17:22).
If you are affected #
- If any of the 21 names appear in your lockfile or
node_moduleshistory, treat the host as having sent a reconnaissance beacon; check outbound connections tojchunt.topor its subdomains in your logs. - This was reconnaissance-only (no credential theft observed) — no credential rotation is indicated on current evidence, but monitor for a follow-on wave from the same actor given this repo's established pattern of recon-only payloads preceding a larger campaign.
- See prevention/package-vetting-checklist.md for general unscoped-package vetting practices.
Prevention #
→ prevention/npm-hardening.md
→ If you depend on a scoped package that exposes a bin entry, consider pinning or vendoring the resolved binary rather than relying on $PATH resolution of its unscoped name in CI.
Update — 2026-09-15: a second, separately reported Google-namespace dependency-confusion cluster (Centriole) — four unscoped packages that sat on npm for 129 days #
Centriole (2026-08-31) reported a different set of packages, worth logging beside the SafeDep finding because it targets the same namespace with the classic technique rather than the bin-entry variant: four unscoped names styled as Google Cloud internal tooling — google-internal-cloud-audit-security-check (versions 99.9.1777210552 and 99.9.1777210553), google-cloud-mono-repo-helper (1.0.1777211772), google-cloud-internal-build-helper (1.2.45) and google-cloud-internal-core-utils (1.2.50) — all published within 29 minutes on 2026-04-26 (13:36–14:05 UTC). The three version strategies are textbook dependency confusion: a 99.9.x "beat any internal version," an epoch-stamped patch field, and plausible 1.2.x numbers for a specific target. Centriole states the payload is undisclosed and quotes npm's standard "should be considered fully compromised" notice; no IOCs are published. npm replaced all four with 0.0.1-security placeholders on 2026-09-03 — confirmed directly against the registry for this update (npm view <pkg> time shows the April publish times and the 2026-09-03T02:45Z placeholder) — 129 days after publication. The GitHub Advisory Database had no malware advisory for any of the four names as of 2026-09-15. Different researcher, different packages and no shared IOCs with the SafeDep cluster above; it is recorded here as a second data point on the namespace, not as the same campaign. Still single-source on what the packages did; the registry action confirms only that npm judged them malicious.
Sources #
- SafeDep — npm Bin Entry Harvesting: A Dependency Confusion Blind Spot — sole source found this sweep: full package list, publish/unpublish timeline, IOCs, technical mechanism. No independent corroboration found — treat as unconfirmed.
2026-09-15 update sources:
- Centriole — 129 Days on Public npm: google-cloud-internal Packages Built for Dependency Confusion — fetched 2026-09-15; published 2026-08-31: package names, versions, publish timestamps, the three version strategies, the 2026-09-03 takedown.
- npm registry (npm view google-cloud-internal-core-utils time and the other three names, run 2026-09-15) — the 2026-04-26 publish times and the 2026-09-03T02:45Z 0.0.1-security placeholders.
- GitHub Advisory Database — search for the package names — fetched 2026-09-15; no malware advisory for any of the four.