Flowise RCE cluster — CVE-2025-59528 actively exploited + April 2026 Agent-node cluster (CVE-2026-41265 et al.)
TL;DR #
Flowise — the drag-and-drop LLM workflow builder (~38K GitHub stars, 12,000–15,000 internet-exposed instances) — has two overlapping RCE problems shipping concurrently. (1) CVE-2025-59528 (CVSS 10.0) — unauthenticated code injection in the CustomMCP node where mcpServerConfig is eval'd as JavaScript; under active in-the-wild exploitation since April 2026 (VulnCheck via THN). (2) April 2026 Agent-node cluster — CVE-2026-41265, CVE-2026-41264, CVE-2026-41268, CVE-2026-41138, CVE-2026-40933 (CVSS 9.2 each) — prompt-injection-to-RCE in the Airtable / CSV / generic Agent nodes that run LLM-generated Python with no sandbox. All fixed in Flowise 3.1.0 (CVE-2025-59528 fix line is 3.0.6 → 3.1.1). If you exposed Flowise to the public internet on any vulnerable version, treat the host as compromised and rotate every upstream LLM/cloud key the platform held.
What happened #
Flowise stores upstream-provider API keys for OpenAI, Anthropic, Azure OpenAI, AWS Bedrock, Cohere, Mistral, and similar — the same "central credentials cache" problem as LiteLLM, but for LLM-workflow-building rather than proxying. Two distinct vulnerability tracks landed against Flowise in the April → May 2026 window:
Track 1 — CVE-2025-59528 (CVSS 10.0). Disclosed originally in September 2025 (SentinelOne), the CustomMCP node accepts a user-supplied mcpServerConfig string and parses it without security validation, executing arbitrary JavaScript with full Node runtime privileges (including child_process, fs). Fix shipped in 3.0.6. VulnCheck observed the first confirmed in-the-wild exploitation from a Starlink IP in early April 2026 (The Hacker News, 2026-04-08; Cybersecurity News; Lab Space CSA Research Note); internet scans count 12,000–15,000 exposed instances, of which many remain unpatched. BleepingComputer and SC Media covered active exploitation; CSO Online framed downstream impact.
Track 2 — April 2026 Agent-node cluster. GitHub Security Advisories disclosed five chainable RCEs in Flowise's various Agent nodes (all fixed in 3.1.0):
- CVE-2026-41265 (CVSS 9.2) — Airtable Agent:
Airtable_Agents.run()evaluates an LLM-generated Python script with no sandbox. An unauthenticated attacker who can send prompts to a chatflow using this node can prompt-inject the LLM into emitting Python that executes attacker commands on the host. - CVE-2026-41138 — Airtable Agent RCE via lack of input verification using
Pandas. - CVE-2026-41264, CVE-2026-41268 — sibling Agent-node RCEs.
- CVE-2026-40933 — Flowise generic RCE.
- CVE-2026-41137 — CSV Agent RCE.
- CVE-2026-41269 — File Upload RCE.
The Airtable Agent class is the cleanest worked example of the decorator-as-documentation pattern already seen in Microsoft Semantic Kernel: the SDK annotation marks a function as "agent tool" and the developer's intuition is that the framework provides isolation. The framework does not — eval-ing LLM output as Python on the server gives any chatflow caller a one-prompt path to RCE.
This adds Flowise to the running cluster of "AI/data tools shipping unauthenticated RCE primitives" — siblings: Langflow CVE-2026-33017, PraisonAI CVE-2026-44338, Marimo CVE-2026-39987, LiteLLM CVE-2026-42208.
Am I affected? #
# Check Flowise version (Docker or npm install)
docker ps --format '{{.Image}}\t{{.Names}}' | grep -i flowise
docker exec <container> npm list -g flowise 2>/dev/null | grep flowise
# Or self-hosted via npm
npx flowise --version 2>/dev/null
# Internet-exposed?
ss -tlnp 2>/dev/null | grep -E ':3000|:3001' # default Flowise ports
If Version < 3.0.6 → vulnerable to CVE-2025-59528 (CustomMCP code injection).
If Version < 3.1.0 → vulnerable to CVE-2026-41264 / CVE-2026-41265 / CVE-2026-41268 / CVE-2026-41138 / CVE-2026-40933 / CVE-2026-41137 / CVE-2026-41269 (Agent-node prompt-injection RCEs).
Recommended minimum: 3.1.1 (CVE-2025-59528 follow-up hardening).
If any of those versions was reachable from the public internet (or from any network you don't fully trust), treat the host as compromised. Flowise stores upstream LLM provider keys — assume those keys, and any cloud-IAM credential wired into a chatflow, are exfiltrated.
IOCs #
| Type | Value |
|---|---|
| CVE | CVE-2025-59528 (CVSS 10.0, CustomMCP), CVE-2026-41265 (CVSS 9.2, Airtable), CVE-2026-41264, CVE-2026-41268, CVE-2026-41138, CVE-2026-40933, CVE-2026-41137, CVE-2026-41269 |
| Affected versions | < 3.0.6 (CVE-2025-59528); < 3.1.0 (Agent-node cluster) |
| Fixed version | 3.0.6 (CVE-2025-59528 baseline) → upgrade to 3.1.1 |
| GHSA (Airtable) | GHSA-3gcm-f6qx-ff7p, GHSA-f228-chmx-v6j6 |
| Active exploitation | yes (April 2026, first VulnCheck telemetry from a Starlink IP) |
| Exposed instances | ~12,000–15,000 on the public internet |
| Vulnerable nodes | CustomMCP, Airtable_Agents, CSV_Agent, generic Agent nodes, File Upload |
| Vulnerable primitive | eval/pickle/exec-style execution of LLM-generated code with no sandbox |
If you are affected #
- Upgrade immediately to Flowise 3.1.1 or later.
- Treat the host as compromised if it was internet-facing in any vulnerable version. Specifically: - Rotate every upstream LLM provider key stored in Flowise — OpenAI, Anthropic, Azure OpenAI, AWS Bedrock, Cohere, Mistral, Google. - Rotate every cloud IAM credential wired into a chatflow (Airtable PATs, GitHub PATs, AWS access keys, etc.). - Audit each provider's usage logs during the exposure window for unexpected request volume, model-arbitrage spend, or geographic shifts in caller IP.
- Bind Flowise off the public internet going forward (127.0.0.1 + auth-required reverse proxy, Tailscale, Cloudflare Tunnel, or VPC-only).
- Disable any unused Agent node in the deployment — every additional Agent-node class is a fresh prompt-injection-to-RCE primitive until further notice.
- Audit any chatflow definitions for attacker-injected nodes — an RCE that ran on your Flowise host could have rewritten the chatflow registry to plant a persistent backdoor.
Prevention #
→ prevention/agent-sandboxing.md
→ prevention/credential-hygiene.md
→ Never expose an LLM-workflow-builder admin UI to the public internet — same rule as LiteLLM, Langflow, PraisonAI, Marimo. The default-bind for these tools should be 127.0.0.1.
→ Treat any "Agent node that runs LLM-generated code" as a prompt-injection-to-RCE primitive until the vendor provides a hard, audited sandbox boundary. The decorator/SDK annotation is documentation, not a security control. (Same pattern as Microsoft Semantic Kernel [KernelFunction].)
→ Treat disclosure-to-exploit as < 36 hours for any AI-workflow CVE; CVE-2025-59528 went exploited ~6 months after disclosure because attackers needed time to weaponize, but newer Agent-node CVEs will move faster now that the recipe is public.
Update — 2026-09: a ~17-CVE second wave (two more Custom-MCP-node RCEs), fixed in 3.1.4 — and the repo is now archived, so 3.1.4 is likely the last release #
Between 2026-09-10 and 2026-09-15 a large second batch of Flowise CVEs was published — one from MITRE, most from VulnCheck as CNA — all against versions ≤ 3.1.3 and all marked fixed in 3.1.4 (npm flowise@3.1.4, released 2026-07-29; confirmed via the registry). Two land in the same Custom MCP node that caused the original CVE-2025-59528, and both are authenticated RCE:
- CVE-2026-91931 (CVSS 9.0, GHSA-vcwp-f9rq-3887) — the Custom MCP node's allowlist permits
npxwhile blocking only specific flags, so an authenticated attacker setsmcpServerConfigto an attacker-named npm package (npx shx touch …is the vendor's PoC) andnpxinstalls and runs it on the server (CWE-78). Fixed 3.1.4. Credit DavidCarliez. - CVE-2026-91932 (CVSS 9.0, GHSA-x7x8-95gh-42xm) —
validateMCPServerConfig()validates command, args and env but ignores thecwdparameter, so a clean filename inargspasses while a poisoned working directory supplies the payload. Fixed 3.1.4. Credit biecho / Diego Meyer.
The rest of the wave (VulnCheck, published 2026-09-12/15, all fixed 3.1.4) is a cross-tenant-authorization and SSRF cluster: CVE-2026-91929 / -91930 / -91933 (cross-tenant workspace/org takeover — delete workspaces, self-invite as org owner, reach other workspaces' tools), CVE-2026-90533 (any org member reads the owner's bcrypt hash and temp tokens via GET /api/v1/organizationuser), CVE-2026-90534 (cross-workspace credential IDOR via node-load-method), CVE-2026-91935 / -91938 (SSRF and LLM-provider-API-key exfiltration via chat-model baseURL and Cheerio/Playwright/Puppeteer document loaders, reaching cloud metadata), CVE-2026-91937 (unauthenticated NoSQL injection in the MongoDB memory node reads other users' chat history), CVE-2026-91934 (arbitrary file write via the SQL Database Chain SQLite path), CVE-2026-91936 (CI workflow script injection stealing AWS/Docker Hub tokens), and CVE-2026-90535 (unauth DoS). Separately, CVE-2026-52098 (MITRE, CVSS 9.8) reports RCE via POST /api/v1/prediction/<flowId> against 3.1.2, and CVE-2026-90580 (VulDB, low) an Evaluations-endpoint SSRF in ≤ 3.0.2 (fixed 3.1.3, exploit public).
The load-bearing caveat: the FlowiseAI/Flowise repository shows as archived on 2026-08-13 (noted in advisory GHSA-9gvv-qjj3-2p6g), and npm carries no release past 3.1.4 (2026-07-29). So while VulnCheck marks this whole batch "fixed in 3.1.4," Flowise is effectively unmaintained — CVE-2026-52098's fix version is not stated, and no future CVE here will get a patch. Treat exposure as the only control you still own: get Flowise off the public internet, require auth in front of it, and disable the Custom MCP node if you cannot migrate off the platform. This is the same advice as the original entry, now with no vendor backstop behind it.
Update — 2026-09-26: six more CVEs against "through 3.1.4" — two CVSS 9.2 SSO authentication bypasses — with no patched version, on a repository archived since August; status → ongoing #
VulnCheck published six more Flowise CVEs on 2026-09-26, all affecting Flowise through 3.1.4 — the version the September wave above called fixed — and all with no patched version ("At the time of the advisory no patched version was available," CVE-2026-100606). The registry check this sweep shows why: npm view flowise time still ends at 3.1.4 (2026-07-29), and the repository remains archived. Two are Critical, and both are in the SSO login path that enterprise/platform-mode deployments use:
- CVE-2026-100606 (CVSS 4.0 9.2, GHSA-mgrx-3hqw-485h; vendor GHSA-vf3j-89vf-r697) — invitation takeover through SSO. When an SSO callback arrives for an email whose user status is
INVITED,verifyAndLogincopies the database user record — including the server-stored single-use invitationtempToken— into the data handed toAccountService.register(), so the register handler's token lookup, email match and expiry checks "pass trivially against the server's own token instead of a caller-supplied one." Anyone who can authenticate at any configured SSO provider with a pending invitee's email as the claim takes over the invitation and the organization membership, for the invitation's validity window (24 hours by default), without ever seeing the emailed token. - CVE-2026-100607 (CVSS 4.0 9.2, GHSA-mjgh-prrr-9qw5; vendor GHSA-cffm-583c-vffr) — any existing account, by email. Flowise "resolves SSO and local-password users solely by email without storing provider or subject identifier bindings," so an attacker who can claim a victim's email at any configured SSO provider — or through a different provider or local password than the victim registered with — is logged in as the victim, with "chatflows, credentials, and API keys."
- The other four (High, all "through 3.1.4", all unpatched): CVE-2026-100608 (8.7) — the BullMQ admin dashboard has no authorization when the server runs in queue mode with the dashboard enabled outside cloud mode; CVE-2026-100610 (7.7) —
GET /api/v1/upsert-history/:idandPATCH /api/v1/upsert-historyhave no route-level permission check and no workspace scoping; CVE-2026-100609 (7.6) — credentials are looked up by ID without filtering on the requester's workspace (cross-workspace credential read); CVE-2026-100605 (7.5) — low-privileged API keys can read and delete chat history.
Status changes from patched to ongoing. Until now every Flowise CVE here had a fix version; these do not, and the project has no maintainer to ship one. If you still run Flowise: the SSO bugs mean an account is only as strong as the weakest identity provider configured — reduce to a single IdP you control, disable local-password login where SSO is on, cancel every pending invitation (INVITED users) and re-issue them one at a time when the invitee is ready to accept, and confirm the BullMQ dashboard is not reachable (/admin/queues-style paths behind the proxy). Put the whole instance behind reverse-proxy authentication, keep the Custom MCP node disabled, and plan the migration — the September advice, with two 9.2s now behind it.
Update — 2026-10-07: four CSV/Airtable-agent and sandbox-escape CVEs (vendor 2026-07-29, VulnCheck CVEs 2026-08-13) reach the reviewed-critical npm listing — the CSV Agent is an RCE path in its own right, fixed in 3.1.3 #
Four Flowise CVEs surfaced on the GitHub Advisory Database's reviewed-critical npm listing on 2026-10-07; all four were vendor-published 2026-07-29 (fixed 3.1.3, so the backfill lands months late — §19), and all four are in the CSV Agent / Airtable Agent code path that turns an LLM's Python output into execution, which is the same class as the April 2026 Airtable-agent CVEs but a distinct set of bugs:
- CVE-2026-73487 — Prompt Injection to RCE and SSRF via the CSV/Airtable Agent Python validator bypass (
flowise/flowise-components≤ 3.1.2, CVSS 3.1 9.3 / 4.0 9.0, VulnCheck CNA). The nodes validate LLM-generated Python with a regex blocklist before running it in Pyodide; prompt injection to the unauthenticated prediction API can slip past it using unblocked pandas functions such aspd.read_json(), which fetch URLs — exfiltrating the loaded dataset, SSRF against internal services and cloud metadata, or code execution. Reporter Peyton Kennedy (Endor Labs). - CVE-2026-73483 — NodeVM sandbox escape via the Puppeteer allowlist (≤ 3.1.2, CVSS 4.0 9.4 / 3.1 9.6). An authenticated user reaching
/api/v1/node-custom-functionescapes the@flowiseai/nodevmsandbox because Puppeteer/Playwright are on the dependency allowlist, running OS commands as the Flowise process user (root in the official Docker image) and reading arbitrary files. Vulnerable by default 2.0.0–3.0.7; from 3.0.8 anALLOW_BUILTIN_DEPgate hides it unless set totrue, but the code remains through 3.1.2. - CVE-2026-69255 — CSV Agent RCE via Pyodide code injection (root shell verified) (≤ 3.1.2, CVSS 4.0 9.2 / 3.1 9.9): user-supplied base64 data is interpolated straight into Python, reaching the host Node.js process and OS commands.
- CVE-2026-73484 — authenticated sandbox escape and data exfiltration via a Pandas-methods bypass in
pythonCodeValidator(flowise≤ 3.1.2, CVSS 4.0 8.6): the denylist omits native DataFrame methods (to_csv,to_json,pipe,query), so a CSVAgent user dumps the dataset and writes files.
All four are fixed in 3.1.3 — which the September Custom-MCP wave above superseded with 3.1.4 — so a current (archived, last-release-3.1.4) instance already carries these fixes; the unpatched SSO bugs from the 09-26 update are what keep the overall status ongoing. The lasting lesson is that the CSV/Airtable Agent is a blocklist-guarded code interpreter reachable through prompt injection: move it to an AST allowlist and isolate Pyodide network access, or disable the node.
Update — 2026-10-10: four enterprise-tier authorization advisories on the vendor tab (2026-08-28 to 09-10) that never reached a CVE listing: cross-tenant workspace deletion and organization-admin takeover (fixed 3.1.4), the owner's password hash readable by any member (fixed 3.1.4), and chat-history read/delete with a low-privileged key (no fix, on the archived repository) #
A walk of the FlowiseAI/Flowise advisory tab on 2026-10-10 found four advisories this file did not carry, all published by the maintainer account after the repository was archived on 2026-08-13 and none with a CVE, so none of them appears on the database listings this sweep reads:
- GHSA-7x8x-vv46-4579 — cross-tenant/cross-org authorization gaps in Enterprise role and SSO-config endpoints (2026-08-31, High, CVSS 4.0 7.6,
flowise≤ 3.1.3, patched 3.1.4, reporter park0407). Five Enterprise endpoints act on a client-supplied workspace, organization, role or SSO id without checking it belongs to the caller's tenant; the worst isDELETE /api/v1/workspace/{id}, which cascades another tenant's workspace away, andPOST /api/v1/loginmethod/testperforms a live SSO test with another organization's stored, decrypted client secret (the same missing check CVE-2026-30823 fixed on two sibling methods but not this one). The reporter did not execute these to completion, since four sit behind paid Enterprise flags, and asks maintainers to confirm in a licensed environment. - GHSA-pprx-4prj-35mj — cross-tenant organization admin takeover via unscoped membership APIs (2026-08-31, High, CVSS 4.0 7.7; the reporter, huslayer826, proposed 3.1 9.9; ≤ 3.1.3, patched 3.1.4). Organization-user and workspace creation trust tenant and user ids in the request body, the service allows assigning the global owner role, and switching into a workspace derives organization-admin status from the workspace role, so a manager in one organization grants themself ownership of another and then joins its workspaces. Validated locally; demonstrated impact is admin takeover and workspace access, not raw credential theft.
- GHSA-fhxm-xxcx-g6x3 —
GET /api/v1/organizationuserreturns the owner's bcrypt hash,tempTokenandtokenExpiryto any member (2026-08-28, Moderate, CVSS 4.0 6.0, ≤ 3.1.3, patched 3.1.4, reporter Shirshakhtml). The GET handler has no permission check and the service attaches the owner's full User record without stripping secret fields; separate code path from CVE-2025-58434, whose fix did not cover it. Reproduced on 3.1.2 andmain; a livetempTokenwould allow a tokenless password-reset takeover, which the reporter did not demonstrate. - GHSA-ppmg-4cx6-95hh — chat message routes lack route-level permission checks (2026-09-10, High, CVSS 4.0 7.5, "≤ 3.1.4", no patched version, reporter GGBoo0).
GET /api/v1/chatmessage/:id,GET /api/v1/internal-chatmessage/:idandDELETE /api/v1/chatmessage/:idskipcheckAnyPermission, so a low-privileged workspace API key reads prompts, responses, source documents and uploaded-file metadata for any known flow id, and deletes messages and their files. Confirmed on 3.1.2; the broader range is unknown.
The first three say "patched 3.1.4" for a release that shipped on 2026-07-29, a month before the advisories, which is the archived-repository pattern again: the fix predates the disclosure and no release will follow it. The fourth joins the six unpatched 09-26 CVEs as a reason the status stays ongoing. Operators of the Enterprise tier should read the first two as the actionable items: a tenant boundary that any workspace manager can cross is a hosted-platform problem, not a self-hosted one.
Update — 2026-11-06: Era reports in-the-wild exploitation of the 2024 overrideConfig bug (CVE-2024-58351, fixed 2.1.4) by a Chinese-language framework it calls "Greeter"; 4,372 Flowise instances exposed by its count #
Era's research team (2026-11-03) ran seven Flowise honeypots on 1.8.2 in four regions from July to October 2026 and describes an exploitation framework that sends a "hello" chat message and then abuses CVE-2024-58351, the overrideConfig code-injection path that VulnCheck's CNA record (2026-06-20) scores 9.8 and describes as enabled by default with no allow-list, relying on vm2 for sandboxing, and reachable through the web embed and the Prediction API. The vendor advisory (2024-11-21, reporter ryanhalliday) lists no CVE and names 2.1.4 as the fix; npm dates 2.1.4 to 2024-11-13. This CVE had no entry in this corpus before today, because the April cluster above starts at the 2026 Agent-node bugs; it is older and still being exploited.
Era's exposure count is a chain of estimates, printed here as the post prints it: Shodan returned 4,372 unique internet-exposed Flowise instances; 3,277 of those reported a version; 703 of those (21.5 percent) had no authentication; 46 of those appeared to share the vulnerable conditions, which the post gives as 6.5 percent of the unauthenticated set and 1.4 percent of the versioned set. None of these is a count of compromised hosts. SecurityWeek's roundup (2026-11-06) repeats the 4,372 figure and the framework name; it is pickup of the same post, not a second finder, and no vendor statement exists because the repository has been archived since August.
Era's defender list matches this file's: keep the instance off the internet or behind proxy authentication, require authentication on the Prediction API, block untrusted callers from supplying executable code through request configuration, review prediction request bodies for the override key rather than chat history, run as a non-root user without the Docker socket, scope the workload's cloud identity narrowly and require IMDSv2. Any instance below 2.1.4 that has ever been reachable from the internet should be treated as compromised.
npm ls flowise 2>/dev/null | grep -o 'flowise@[0-9.]*' # < 2.1.4: CVE-2024-58351; < 3.1.4: the 2026 clusters above; the repository is archived
Sources #
- Era — "Greeter": a Flowise exploitation framework — fetched 2026-11-06: 2026-11-03, Era Research Team; seven honeypots on 1.8.2, July to October 2026; CVE-2024-58351; the 4,372 / 3,277 / 703 / 46 chain; the defender list. Flowise GHSA-5cph-wvm9-45gj — fetched 2026-11-06: 2024-11-21, High, no CVE field, fixed 2.1.4; CNA record for CVE-2024-58351 (VulnCheck, 2026-06-20, 9.8 / 9.3) read from
cveawg.mitre.org;npm view flowise timefor 2.1.4 (2024-11-13) and 3.1.4 (2026-07-29). SecurityWeek — In Other News, 2026-11-06 — pickup. - GitHub Security Advisory GHSA-vcwp-f9rq-3887 — CVE-2026-91931 Flowise Custom MCP npx RCE — fetched 2026-09-16; CVSS 9.0, fixed 3.1.4,
npx-package execution PoC. - GitHub Security Advisory GHSA-x7x8-95gh-42xm — CVE-2026-91932 Flowise Custom MCP
cwdbypass RCE — fetched 2026-09-16; CVSS 9.0, fixed 3.1.4, unvalidatedcwdparameter. - NVD — CVE-2026-52098 — fetched 2026-09-16 via the NVD API; MITRE CNA, CVSS 9.8, RCE via
/api/v1/prediction/<flowId>in 3.1.2. - VulnCheck — Flowise before 3.1.4 remote code execution via Custom MCP npx — fetched 2026-09-16; CNA record for CVE-2026-91931 and the wider 3.1.4 batch.
- Registry check (2026-09-16):
npm view flowise time— latest release3.1.4(2026-07-29), no3.1.5; repository archived 2026-08-13 per GHSA-9gvv-qjj3-2p6g. -
2026-09-27 update sources — GHSA-mgrx-3hqw-485h / CVE-2026-100606 and GHSA-mjgh-prrr-9qw5 / CVE-2026-100607 — fetched 2026-09-27: CVSS 4.0 9.2 each, "through 3.1.4", no patched version, the
verifyAndLogin/ email-only resolution mechanisms verbatim; CNA VulnCheck. NVD API — CVE-2026-100605, -100606, -100607, -100608, -100609, -100610 — fetched 2026-09-27: all six published 2026-09-26 with the scores quoted above. GitHub Advisory Database —flowisequery — fetched 2026-09-27: six entries dated Sep 26 above the 09-15 wave. Registry check 2026-09-27:npm view flowise time— last release3.1.4(2026-07-29). The FlowiseAI/Flowise vendor advisories referenced by the database (GHSA-vf3j-89vf-r697, GHSA-cffm-583c-vffr) were not opened this sweep. -
2026-10-07 update sources — FlowiseAI/Flowise — GHSA-w7x8-q2gp-5cgg / CVE-2026-73487, GHSA-9gvv-qjj3-2p6g / CVE-2026-73483, GHSA-vmv7-4m6c-3cg5 / CVE-2026-69255, GHSA-x58f-9m57-qc4m / CVE-2026-73484 (fetched 2026-10-07: vendor-published 2026-07-29, ≤ 3.1.2 → 3.1.3, scores, mechanisms and reporters quoted above); CVE Services — CVE-2026-73487 and CVE-2026-73483 (VulnCheck CNA, published 2026-08-13); GitHub Advisory Database — reviewed critical npm listing (fetched 2026-10-07: the four Flowise rows dated Oct 7).
Sources — original April 2026 cluster #
- GitHub Security Advisory GHSA-3gcm-f6qx-ff7p — CVE-2026-41265 Flowise Airtable Agent RCE — vendor advisory.
- GitHub Advisory Database — CVE-2026-41138 Flowise Airtable Agent RCE via Pandas — sibling CVE.
- SentinelOne — CVE-2025-59528 Flowise RCE Vulnerability — CVSS 10.0 CustomMCP RCE catalog entry.
- SentinelOne — CVE-2026-40933 Flowise RCE Vulnerability — sibling CVE catalog entry.
- The Hacker News — Flowise AI Agent Builder Under Active CVSS 10.0 RCE Exploitation; 12,000+ Instances Exposed (2026-04-08) — active exploitation reporting.
- BleepingComputer — Max severity Flowise RCE vulnerability now exploited in attacks — exploitation confirmation.
- SC Media — Active exploitation of max severity Flowise bug threatens broad compromise — aggregator framing.
- Cybersecurity News — Flowise AI Agent Builder Injection Vulnerability Exploited in Attacks, 15,000+ Instances Exposed — exposure scale.
- CSO Online — Hackers exploit a critical Flowise flaw affecting thousands of AI workflows — downstream-impact framing.
- Cloud Security Alliance Lab Space — Flowise CVSS 10.0 RCE: AI Agent Builders Under Attack (Research Note 2026-04-09) — research-note framing of the AI-agent-builder attack class.
- Safe Security — No Credentials Required: How the Most Dangerous New CVEs Invite Themselves into Your Systems (2026-04-15) — pre-auth RCE framing.
- Tech Jack Solutions — Flowise (FlowiseAI) Vulnerability Rollup (2026-04-07) — vendor-rollup index.
- Feedly — Latest Flowiseai Vulnerabilities — CVE tracker.
- Threat Intelligence Network — CVE-2026-41265 — CVE detail.
- 2026-10-10 update sources — FlowiseAI/Flowise — GHSA-7x8x-vv46-4579, GHSA-pprx-4prj-35mj, GHSA-fhxm-xxcx-g6x3, GHSA-ppmg-4cx6-95hh (all fetched 2026-10-10: published 2026-08-31, 08-31, 08-28 and 09-10; severities, CVSS 4.0 scores and vectors, affected and patched ranges, reporters, the "No known CVE" statements, and the archived-repository note).