VSXPloit — Open VSX nightly build pipeline could be exploited to steal marketplace admin token (June 2025)
TL;DR #
Koi Security researcher Oren Yomtov discovered that Open VSX's nightly build pipeline executed arbitrary code from community-submitted extension repositories, allowing any extension author to silently capture the @open-vsx account's publish token — the master key to the entire marketplace. An attacker with that token could push malicious updates to all installed extensions or publish new ones under any namespace, affecting 8M+ developers using Cursor, Windsurf, VSCodium, Gitpod, and other VS Code forks. Patched June 25, 2025 after responsible disclosure on May 4, 2025. No exploitation observed prior to disclosure.
What happened #
Open VSX (operated by the Eclipse Foundation) is the extension marketplace used by VS Code forks that cannot access Microsoft's proprietary VS Code Marketplace — including Cursor, Windsurf, VSCodium, Google Cloud Shell Editor, Gitpod, StackBlitz, and Coder.
Every night, Open VSX ran an automated process that:
1. Fetched the latest versions of community-submitted extensions from their source repositories.
2. Ran npm install on those repositories to build the extensions.
3. Published the resulting .vsix artifacts to the marketplace using a high-privilege @open-vsx account token stored as a secret in the build environment.
The critical flaw: step 2 ran npm install on arbitrary, attacker-controlled code. Any extension author could plant a malicious npm postinstall script (or a malicious transitive dependency) in their extension repository. When the nightly build process ran npm install, it would execute that code with access to the build environment's secrets — including the @open-vsx publish token.
The impact of stealing the @open-vsx token:
- Push malicious updates to any existing extension in the marketplace — updates that get silently auto-installed by all users with auto-update enabled (the default in Cursor, Windsurf, etc.).
- Publish new extensions under any namespace, including ones that match legitimate extension names.
- Overwrite existing publishers' namespaces — effective supply-chain takeover of the entire marketplace.
With the token, an attacker would have had super-admin access to every extension used by the 8M+ developers across all Open VSX-integrated tools.
No CVE was assigned (the flaw is in Open VSX's build infrastructure, not a packaged dependency). No exploitation was observed before or after disclosure — Oren Yomtov followed responsible disclosure, giving the Eclipse Foundation time to patch before publishing.
Relationship to other Open VSX vulnerabilities #
VSXPloit is distinct from two other Open VSX security issues tracked in this repo:
- Open Sesame (Feb 2026, patched in Open VSX 0.32.0): a scanner boolean-ambiguity bug where
false(scan failed/errored) was interpreted as "not malicious" — letting malicious extensions slip through pre-publish checks. VSXPloit targets the build step (pre-publish execution), Open Sesame targets the scan step (post-publish gate). - AI IDEs recommend non-existent extensions (Jan 2026): VS Code-fork IDEs point at unclaimed OpenVSX namespaces in their recommended-extensions config — a supply-chain gap from marketplace divergence, not from the build pipeline.
VSXPloit is the most severe of the three: a single compromised build run would have given an attacker the ability to push to any extension, not just claim an unclaimed namespace or slip through a scan gate.
Am I affected? #
The vulnerability was patched on June 25, 2025 before any exploitation was observed. If you are running a recent version of Cursor, Windsurf, VSCodium, or any other Open VSX-integrated tool, your installed extensions came from the marketplace after the fix was deployed.
However, this advisory documents a class of supply-chain risk that remains relevant:
# Audit extensions installed in VS Code forks
cursor --list-extensions --show-versions 2>/dev/null
windsurf --list-extensions --show-versions 2>/dev/null
# Or in-app: Extensions sidebar → installed → inspect publisher, version, last updated
# Check that all installed extensions are from legitimate, known publishers
# Any extension from an unknown publisher updated around May–June 2025 should be scrutinized
The structural lesson: Open VSX's build pipeline executing npm install against community-submitted code was the root cause. Any equivalent build/CI system that fetches and runs code from external contributors without sandboxing carries the same risk.
If you are affected #
If you suspect an extension installed from Open VSX between 2025-05-04 and 2025-06-25 may have been compromised:
→ playbooks/auditing-a-vibe-coded-repo.md — audit installed extensions and verify publisher legitimacy. → playbooks/if-your-local-ai-agent-was-exploited.md — if you believe an extension executed malicious code.
Prevention #
→ prevention/supply-chain-attack-surface.md — treat IDE extension marketplaces as package registries with the same vetting rigor. → For extension marketplace operators: sandbox the build environment — never give a build step access to a publish token for the marketplace being built. Use OIDC tokens scoped to the specific extension being published, not a global admin token. → For developers: pin installed extensions to specific versions and audit changelog + publisher identity before updating. Enable automatic updates only for extensions from publishers you've verified. → For Open VSX specifically: the post-patch architecture requires explicit trust grants before an extension can be auto-published. The nightly build pipeline no longer has unscoped access to the marketplace publish token.
Sources #
- The Hacker News — Critical Open VSX Registry Flaw Exposes Millions of Developers to Supply Chain Attacks — primary writeup, 8M+ developers figure, nightly build mechanism, disclosure timeline.
- Security Affairs — Taking over millions of developers exploiting an Open VSX Registry flaw — Oren Yomtov / Koi Security attribution,
@open-vsxsuper-admin token impact. - BleepingComputer — The zero-day that could've compromised every Cursor and Windsurf user — Cursor/Windsurf framing, patch timeline, exploit-free disclosure confirmation.
- Cross-reference: 2026-05-whitecobra-vscode-extensions.md — WhiteCobra's repeated abuse of Open VSX after the VSXPloit patch.
- Cross-reference: 2026-01-vscode-fork-recommended-extension-hijack.md — separate Open VSX risk class (unclaimed-namespace hijack via IDE-hardcoded recommended-extension lists).