TrapDoor — cross-ecosystem stealer poisons .cursorrules / CLAUDE.md (May 2026)
TL;DR #
TrapDoor is an active, coordinated supply-chain campaign that pushed 34+ malicious packages across 384+ versions to npm, PyPI, and Crates.io at once (first activity 2026-05-22 20:20 UTC), impersonating crypto/DeFi/AI/security developer tooling. Beyond the usual wallet- and credential-stealing payload, its defining trick is vibe-coding-specific: it rewrites your repo's .cursorrules and CLAUDE.md with zero-width Unicode to hide a prompt-injection instruction, so your own AI coding agent exfiltrates secrets on its next run under the guise of "running an automated project security scan."
What happened #
Socket flagged TrapDoor on 2026-05-24/25 as a single actor publishing in timed waves from a cluster of accounts across three registries simultaneously. The packages use deceptive, community-adjacent names to feign legitimacy — observed examples include prompt-engineering-toolkit, solidity-deploy-guard, and defi-threat-scanner — and target developers in the crypto, DeFi, Solana/Sui/Aptos, and AI communities.
Each ecosystem gets a tailored execution path:
- npm — a postinstall hook runs a shared payload trap-core.js (a ~1,149-line credential harvester). It scans for secrets and validates stolen AWS and GitHub tokens with live API calls to confirm they're still active before exfiltrating, then attempts lateral movement + persistence.
- PyPI — the payload auto-executes on import (no build step needed).
- Crates.io (Rust) — a build.rs build script searches for local keystores, XOR-encrypts the loot with a hardcoded key, and exfiltrates it to GitHub Gists.
The vibe-coding angle (the reason this is in scope): TrapDoor deliberately targets AI coding assistants by modifying .cursorrules and CLAUDE.md project files, using zero-width Unicode characters to obscure a malicious prompt inside otherwise-normal-looking instructions. The hidden prompt tricks the agent into performing credential exfiltration framed as a benign "automated project security scan." This combines the steganographic-Unicode technique seen in GlassWorm with AI-agent-config files as a persistence + re-infection surface — the package poisons the repo once, and the developer's own agent re-runs the attack thereafter. It's the inverse of prior incidents that merely read AI-tool config (cf. Bitwarden CLI and the Nx Console ~/.claude/settings.json theft): here the attacker writes instructions into the files your agent trusts.
Attribution / markers: Socket ties the operation to the GitHub account ddjidd564, the domain ddjidd564.github.io, and the campaign marker string P-2024-001. No link to TeamPCP/Shai-Hulud has been established — treat it as a distinct actor.
Stolen data: wallet seeds / keystores (Solana, Sui, Aptos), SSH keys, AWS credentials, GitHub tokens, browser profile/login databases, crypto-wallet extension data, environment variables, API keys, and local dev configuration files.
Am I affected? #
# 1. Did any TrapDoor-named package land in your tree? (names seen so far)
npm ls prompt-engineering-toolkit solidity-deploy-guard defi-threat-scanner --all 2>/dev/null
pip show prompt-engineering-toolkit solidity-deploy-guard defi-threat-scanner 2>/dev/null
grep -REn "prompt-engineering-toolkit|solidity-deploy-guard|defi-threat-scanner|trap-core" \
package-lock.json yarn.lock pnpm-lock.yaml requirements*.txt poetry.lock Cargo.lock 2>/dev/null
# 2. Campaign infrastructure / markers
grep -REn "ddjidd564|P-2024-001|trap-core\.js" . 2>/dev/null
# 3. THE IMPORTANT ONE — was your AI-agent config silently rewritten?
# Flag zero-width / invisible Unicode in agent instruction files (the persistence vector):
for f in .cursorrules CLAUDE.md AGENTS.md .github/copilot-instructions.md .windsurfrules; do
[ -f "$f" ] && grep -nP '[\x{200B}-\x{200F}\x{202A}-\x{202E}\x{2060}-\x{206F}\x{FEFF}\x{E0000}-\x{E007F}]' "$f" \
&& echo " ^ invisible Unicode in $f — INSPECT"
done
# 4. Rust crates: build.rs that reaches for keystores / gists
grep -REn "build\.rs" Cargo.toml 2>/dev/null && grep -REn "gist|keystore|XOR" build.rs 2>/dev/null
If .cursorrules/CLAUDE.md contains hidden Unicode you didn't write, assume any credential your agent could reach was exfiltrated — including tokens validated live by trap-core.js.
If you are affected #
- Remove the package, delete
node_modules/ venv /target, and reinstall from a clean lockfile. - Restore your AI-agent config files from a known-good commit and re-scan them for invisible Unicode before letting any agent run again.
- Rotate everything: crypto wallets/seeds, SSH keys, AWS + GitHub tokens (the npm payload live-validates AWS/GitHub creds, so assume they're known-good to the attacker), browser-stored logins, API keys.
→ playbooks/if-you-installed-a-bad-npm-package.md → playbooks/if-your-github-pat-leaked.md → playbooks/rotating-cloud-credentials.md
Prevention #
→ prevention/npm-hardening.md — disable install scripts, pin versions, watch typosquats of crypto/AI tooling names
→ prevention/credential-hygiene.md
- Treat .cursorrules / CLAUDE.md / AGENTS.md as security-sensitive code. Diff them on every dependency change, keep them in version control, and grep for zero-width/bidi code points — your agent obeys whatever they contain.
Sources #
- Socket — TrapDoor Crypto Stealer Supply Chain Attack Hits 34 Packages Across npm, PyPI, and Crates — canonical research, package names,
trap-core.js, ddjidd564 / P-2024-001 markers,.cursorrules/CLAUDE.mdabuse. - The Hacker News — TrapDoor Supply Chain Attack Spreads Credential-Stealing Malware via npm, PyPI, and CratesIO — timeline, ecosystem-specific execution paths.
- CyberSecurityNews — Hackers Compromised 34 Packages in npm, PyPI, and Crates in New Supply Chain Attack — IOCs, data-theft list.
- GBHackers — Hackers Compromise 34 npm, PyPI, and Crates Packages in Major Supply Chain Attack — corroborating details.
- The Block — Researchers flag TrapDoor malware campaign targeting crypto developer environments (Aptos, Sui, Solana) — crypto-ecosystem targeting.
- The Crypto Times — TrapDoor Malware Hits npm, PyPI & Crates.io, Steals Crypto Wallets & SSH Keys — Rust
build.rsXOR→Gist exfil. - Cyber Kendra — Malicious Packages on npm, PyPI, and Crates.io Steal Crypto Wallets, SSH Keys, and Cloud Credentials — corroborating IOCs.