Microsoft Semantic Kernel — prompt injection to RCE (CVE-2026-25592, CVE-2026-26030, May 2026)
TL;DR #
On 2026-05-07, Microsoft disclosed two RCE flaws in Semantic Kernel, its open-source agent framework. CVE-2026-25592 (.NET SDK, CVSS 10.0) — an internal DownloadFileAsync helper was accidentally tagged [KernelFunction], exposing it to the LLM with an attacker-controlled localFilePath. A prompt-injected agent can stage arbitrary files on the host and escape the Azure Container Apps Python sandbox. CVE-2026-26030 (Python SDK, CVSS 9.9) — the InMemoryVectorStore default filter built a Python lambda from user input and executed it with eval(); one crafted filter string → arbitrary code execution. Both came out of Microsoft's own "When prompts become shells" research. Patch to .NET SDK 1.71.0 and Python SDK 1.39.4.
What happened #
CVE-2026-25592 — [KernelFunction] exposure of DownloadFileAsync (.NET) #
Microsoft's Semantic Kernel .NET SDK uses the [KernelFunction] attribute to mark methods the LLM is allowed to call as tools. Internal helper DownloadFileAsync was annotated with [KernelFunction] during development and shipped with the attribute intact — the LLM could invoke it. Its localFilePath parameter accepted any path with no validation. A prompt-injected agent could:
- Call
DownloadFileAsyncwithlocalFilePath = /tmp/x.so(orC:\Windows\Temp\x.dll) to drop a payload on the host. - Trigger that payload via any other tool the agent had (Python interpreter, shell function, file watcher).
- Escape the Azure Container Apps Python sandbox that's the default for Semantic Kernel's auto-spun execution environment.
Microsoft's PoC: a single prompt launches calc.exe on the host running the agent. CVSS 10.0.
CVE-2026-26030 — eval() in InMemoryVectorStore filter (Python) #
The Python SDK's InMemoryVectorStore.search() filter takes a string like "city == 'Paris'" and historically converted it to a Python lambda via eval(). Anywhere the filter string can be influenced by upstream data (RAG over user-controlled documents, vector search over agent-fetched content, etc.), eval() runs attacker code. CVSS 9.9. Fixed by replacing eval() with a safe parser in 1.39.4.
Both vulnerabilities stem from the same architectural pattern Microsoft itself flagged: treating an SDK annotation ([KernelFunction], the filter parameter) as documentation rather than a security boundary.
Am I affected? #
# Python
pip show semantic-kernel 2>/dev/null | grep -E '^(Name|Version):'
# Vulnerable: < 1.39.4
# .NET
dotnet list package | grep -i 'Microsoft.SemanticKernel'
# Vulnerable: < 1.71.0
Quick filter audit (Python):
# Any place you build an InMemoryVectorStore filter from user/RAG content
grep -rn 'InMemoryVectorStore\|\.search(.*filter' --include='*.py'
IOCs #
| Type | Value |
|---|---|
| CVE (.NET) | CVE-2026-25592 (CVSS 10.0) |
| CVE (Python) | CVE-2026-26030 (CVSS 9.9) |
| Vulnerable .NET versions | Microsoft.SemanticKernel < 1.71.0 |
| Vulnerable Python versions | semantic-kernel < 1.39.4 |
| Root cause (.NET) | DownloadFileAsync exposed via [KernelFunction], unvalidated localFilePath |
| Root cause (Python) | eval()-based filter in InMemoryVectorStore |
If you are affected #
- Upgrade now:
pip install --upgrade 'semantic-kernel>=1.39.4'/dotnet add package Microsoft.SemanticKernel --version 1.71.0. - Turn off
AutoInvokeKernelFunctionson any agent with disk, shell, or network reach until you've audited every exposed function for path validation and side-effect scope. - Audit your own
[KernelFunction]annotations — any internal helper that wasn't supposed to be callable by the LLM is now one prompt injection away from RCE. - If you ran Semantic Kernel on Azure Container Apps and an agent was reachable from untrusted input (RAG over the web, chatbot, MCP-fed content) between Semantic Kernel's first vulnerable release and your patch date, treat container memory and any mounted secrets as compromised.
- For Python: stop building filter strings from any data you don't fully trust. Use the new safe parser exclusively.
Why this matters for vibe coders #
Semantic Kernel is one of the three big agent SDKs (alongside LangChain and the Anthropic Agent SDK) sitting underneath many vibe-coded chatbots and back-end agent services. The class issue — decorators-as-documentation — repeats across every framework that lets the LLM choose which method to call. If you've written @tool / @function_tool / [KernelFunction] annotations and the function does anything irreversible, you're one prompt injection away from a bad day.
Prevention #
→ prevention/agent-sandboxing.md
→ prevention/mcp-hygiene.md — same principles for tool exposure
→ Treat [KernelFunction] / @tool decorators as security policy. Audit before each release.
→ Default-deny untrusted input as an argument source for any function the LLM can call.
→ Never eval() LLM- or RAG-derived strings. Use parsers (ast, pydantic) with allowlists.
Sources #
- Microsoft Security Blog — When prompts become shells: RCE vulnerabilities in AI agent frameworks
- NVD — CVE-2026-25592
- NVD — CVE-2026-26030
- Particula — Semantic Kernel CVE-2026-25592: How Prompt Injection Became RCE
- Nuka-AI — The Cracked Kernel: Semantic Kernel disclosure
- Miggo — CVE-2026-25592: Semantic Kernel PythonPlugin RCE
- GitLab Advisories — CVE-2026-26030: Semantic Kernel InMemoryVectorStore filter RCE
- Windows Forum — Semantic Kernel Prompt Injection Bugs Let Attackers Run Code or Write Files
- Vibe Graveyard — Semantic Kernel bugs turned prompt injection into remote code execution