LangChain LangGrinch + path-traversal + SSRF + SQLi (CVE-2025-68664, CVE-2026-34070, CVE-2026-26019, CVE-2025-67644)
TL;DR #
LangGrinch (CVE-2025-68664, CVSS 9.3 Critical) — langchain-core's dumps() / dumpd() serializers did not escape user-controlled dictionaries containing the reserved "lc" key. Attacker-supplied data round-tripped through loads() could instantiate classes from langchain_core / langchain namespaces, exfiltrate environment-variable secrets, and reach arbitrary code execution via Jinja2 templates. Patched in langchain-core 0.3.81 and 1.2.5 (Dec 23, 2025). A follow-on path-traversal, CVE-2026-34070 (CVSS 7.5), in langchain_core/prompts/loading.py lets a deserialized config load files outside the intended directory; patched in 1.2.22 (May 2026). With LangChain at ~98M downloads/month, any vibe-coded agent that loads user-influenced data through LangChain's serializer is in scope.
What happened #
On 2025-12-23, Cyata disclosed CVE-2025-68664 ("LangGrinch") to LangChain. The bug lived in langchain_core.load.dump.dumps() / dumpd(): when serializing a "free-form dictionary" that happened to contain a key named "lc", the serializer treated it as a LangChain magic marker rather than user data. On deserialization (loads()/loadd()), the magic-marker path could:
- Read fields and instantiate classes from the allowlisted
langchain_coreandlangchainnamespaces. - Use those classes (notably anything that takes a Jinja2 template) to render attacker-controlled strings, which Jinja2 can evaluate as Python.
- Reach
os.environand the global module namespace — extractingOPENAI_API_KEY,ANTHROPIC_API_KEY, AWS keys, etc.
The exploitation path is realistic for vibe coders: any LangChain agent that stores chains, messages, prompts, or tool configs by serializing user-influenced data to JSON — for example, persisting a chat history in Redis/Postgres and reloading it — gives an attacker who controls part of that data a write→read→RCE primitive.
Five months later (May 2026), researcher Rickidevs disclosed CVE-2026-34070, a path-traversal in langchain_core/prompts/loading.py. The loader took filename values out of a deserialized config dictionary and open()ed them without normalizing the path, letting an attacker chained off LangGrinch read arbitrary files (or, with the right write-then-read, complete the original RCE primitive on stricter Jinja2 sandboxes).
Both bugs are in langchain-core, which is depended on transitively by langchain, langgraph, langsmith, and every official LangChain integration. LangChain reports ~98M downloads in the last month; ~847M total.
Am I affected? #
# Are you on a vulnerable langchain-core?
pip show langchain-core | grep -E '^(Name|Version):'
# Anything <0.3.81 OR (>=1.0.0,<1.2.5) is vulnerable to LangGrinch
# Anything <1.2.22 is vulnerable to CVE-2026-34070
# Search the codebase for risky patterns
grep -RnE 'langchain.*\.load(s|d)?\(' . 2>/dev/null
grep -RnE 'langchain.*\.dump(s|d)?\(' . 2>/dev/null
# Or pickled / Redis-stored chains:
grep -RnE 'PickleSerializer|RedisChatMessageHistory|json\.loads.*langchain' . 2>/dev/null
You are affected if:
- You run a vulnerable langchain-core and persist or transmit chain/prompt/message objects that touch any user input, OR
- You import LangChain into a service that accepts JSON from third parties and at any point does loads() on it.
IOCs #
| Type | Value |
|---|---|
| CVE | CVE-2025-68664 ("LangGrinch") |
| CVE | CVE-2026-34070 (path traversal) |
| GHSA | GHSA-r399-636x-v7f6 (LangGrinch) |
| CVSS | 9.3 (LangGrinch) / 7.5 (path traversal) |
| Affected | langchain-core <0.3.81 OR >=1.0.0,<1.2.5 (LangGrinch); langchain-core <1.2.22 (path-traversal) |
| Fixed | langchain-core 0.3.81, 1.2.5, 1.2.22 |
| Marker key | dictionaries containing the literal string "lc" round-tripped through langchain.load.dump |
If you are affected #
- Pin and upgrade:
pip install --upgrade "langchain-core>=1.2.22"(also pulls compatiblelangchain/langgraph). - Audit code paths where chain/message/prompt objects are loaded from user-influenced JSON (Redis, Postgres, files, HTTP bodies). Add a schema check before
loads(). - Treat any environment variables the LangChain process could read as disclosed until proven otherwise. Rotate LLM provider keys (
OPENAI_API_KEY,ANTHROPIC_API_KEY, etc.), cloud keys, and any secrets in the same process. See playbooks/rotating-cloud-credentials.md. - Disable Jinja2 templating in any LangChain component that doesn't strictly require it.
Prevention #
→ prevention/agent-sandboxing.md
→ prevention/credential-hygiene.md
→ Never use a framework deserializer (LangChain load.dump, Pydantic parse_obj_as, pickle) on data you didn't write. Use plain JSON + an explicit schema.
→ Pin AI-framework packages to exact versions in production; treat AI-agent framework CVEs as < 4-hour disclosure-to-exploit per the PraisonAI baseline.
June 2026 update — CVE-2026-26019: @langchain/community RecursiveUrlLoader SSRF #
CVE-2026-26019 (moderate) was disclosed in the JavaScript/TypeScript LangChain package @langchain/community (up to version 1.1.13). The RecursiveUrlLoader class validates URLs with String.startsWith() (a string-prefix check, not a semantic URL comparison), allowing crafted subdomains like https://example.com.attacker.com to bypass the preventOutside same-domain restriction. Additionally, the crawler did not block access to cloud metadata endpoints (169.254.169.254), loopback, or RFC-1918 private addresses — enabling SSRF to AWS/GCP/Azure instance metadata services.
Fixed in @langchain/community 1.1.14 by replacing the prefix check with strict URL API origin validation and adding explicit SSRF filters for private IP ranges, loopback, cloud metadata, and non-HTTP(S) schemes.
# Check JS/TS LangChain community version
npm list @langchain/community 2>/dev/null
# Vulnerable: <1.1.14
If your LangChain JS agent uses RecursiveUrlLoader and processes user-supplied or externally-fetched URLs, upgrade immediately.
| Field | Value |
|---|---|
| CVE | CVE-2026-26019 |
| GHSA | GHSA-gf3v-fwqg-4vh7 |
| Affected | @langchain/community <1.1.14 |
| Fixed | @langchain/community 1.1.14 |
June 2026 update — LangGraph deserialization RCE (CVE-2026-27794, CVE-2026-28277) #
Two critical deserialization vulnerabilities were disclosed in LangGraph (the graph-based orchestration layer built on langchain-core):
CVE-2026-27794 — BaseCache pickle fallback in langgraph-checkpoint. LangGraph's checkpoint system persists graph state between steps using BaseCache. When the primary serializer fails, it falls back to Python's pickle module on the cached blob. An attacker who can write to the checkpoint store (Redis, Postgres, SQLite) can plant a crafted pickle payload that executes arbitrary code the next time any graph step restores from that checkpoint. Fixed in langgraph-checkpoint 4.0.0.
CVE-2026-28277 — msgpack deserialization in checkpoint loading. The msgpack deserializer used by langgraph-checkpoint did not restrict object types during unpacking, allowing crafted msgpack payloads in the checkpoint store to instantiate arbitrary Python objects at load time. Provides an alternative attack path for attackers with write access to the checkpoint store.
The attack chain mirrors LangGrinch (CVE-2025-68664): any LangGraph agent that persists checkpoints to a shared store and where user input, MCP tool output, or external data can influence checkpoint contents is in scope. Vibe-coded agents that expose a chat interface backed by a LangGraph graph with Redis/Postgres checkpointing are the highest-risk target.
# Check langgraph-checkpoint version
pip show langgraph-checkpoint | grep Version
# Vulnerable: <4.0.0
Fix: pip install --upgrade "langgraph-checkpoint>=4.0.0" (pulls compatible langgraph).
| Field | Value |
|---|---|
| CVE | CVE-2026-27794 (BaseCache pickle fallback) |
| CVE | CVE-2026-28277 (msgpack deserialization) |
| Affected | langgraph-checkpoint <4.0.0 |
| Fixed | langgraph-checkpoint 4.0.0 |
June 2026 update — CVE-2025-67644: LangGraph SQLite SQL injection #
CVE-2025-67644 (CVSS 7.3 High, CWE-89) is a SQL injection vulnerability in langgraph-checkpoint-sqlite — the SQLite-backed checkpoint store for LangGraph agents. The vulnerable function _metadata_predicate constructs SQL WHERE clauses by interpolating metadata filter keys directly into the query string without sanitisation or parameterisation. Calling SqliteSaver.list() or SqliteSaver.alist() with attacker-influenced metadata key names allows an attacker to break out of the filter clause and inject arbitrary SQL.
Impact: an attacker who can influence the metadata keys passed to a checkpoint list/search operation can bypass filters and read all checkpoint records in the SQLite database — leaking full conversation history (all threads), thread IDs, and any agent-state metadata persisted there. The checkpoint store may include tool call results, retrieved documents, and other structured context that the agent persisted during a run.
The attack surface is realistic for vibe coders: if a LangGraph agent accepts a user-provided metadata key (e.g., "filter by tag name" or "filter by session label") and passes it to SqliteSaver.list(), the SQL injection fires at query time — no deserialization required.
Fixed in langgraph-checkpoint-sqlite >= 3.0.1 by applying a strict allowlist regex (^[a-zA-Z0-9_.-]+$) on all metadata key names before they enter the query string.
# Check your langgraph-checkpoint-sqlite version
pip show langgraph-checkpoint-sqlite | grep Version
# Vulnerable: <3.0.1
Fix: pip install --upgrade "langgraph-checkpoint-sqlite>=3.0.1".
| Field | Value |
|---|---|
| CVE | CVE-2025-67644 |
| GHSA | GHSA-7p73-8jqx-23r8 |
| CWE | CWE-89 (SQL Injection) |
| CVSS | 7.3 High |
| Affected | langgraph-checkpoint-sqlite <3.0.1 |
| Fixed | langgraph-checkpoint-sqlite 3.0.1 |
Sources #
- Cyata — All I Want for Christmas is Your Secrets: LangGrinch hits LangChain Core (CVE-2025-68664) — Original disclosure (Dec 23, 2025), full PoC chain.
- NVD — CVE-2025-68664 Detail — Official CVE record + CVSS 9.3.
- The Hacker News — Critical LangChain Core Vulnerability Exposes Secrets via Serialization Injection — Independent confirmation.
- Cybersecurity News — Critical Langchain Vulnerability Let attackers Exfiltrate Sensitive Secrets from AI systems — Impact framing; download stats.
- Miggo — CVE-2025-68664: LangChain Deserialization RCE — Technical breakdown.
- SOCRadar — CVE-2025-68664: Critical LangChain Flaw Enables Secret Extraction — Aggregator confirmation.
- GitLab Advisory Database — CVE-2026-34070: langchain-core path traversal in legacy
load_promptfunctions — official advisory; legacyload_prompt/load_prompt_from_configread traversal-able paths; fixed in 1.2.22. - CSO Online — LangChain path traversal bug adds to input validation woes in AI pipelines — CVE-2026-34070 path-traversal context + patched-version (1.2.22) confirmation.
- Hacker News thread — Critical vulnerability in LangChain – CVE-2025-68664 — Community discussion and exploitation context.
- GitHub Advisory Database — CVE-2026-26019 — SSRF in @langchain/community RecursiveUrlLoader.
- CyberSecurityNews — LangChain Community SSRF Bypass Vulnerability Enables Access to Internal Services — CVE-2026-26019 write-up.
- NVD — CVE-2026-26019 Detail — Official CVE record.
- GitHub Advisory — CVE-2026-27794: LangGraph BaseCache Pickle Deserialization RCE — LangGraph checkpoint
pickle_fallback=True; fixed in langgraph-checkpoint 4.0.0. - NVD — CVE-2026-27794 Detail — Official CVE record.
- NVD — CVE-2026-28277 Detail — Official CVE record (msgpack deserialization).
- GitHub Advisory — GHSA-7p73-8jqx-23r8: LangGraph SQLite SQL injection (CVE-2025-67644) — Official advisory; fix description (strict key regex in 3.0.1).
- Snyk — SNYK-PYTHON-LANGGRAPHCHECKPOINTSQLITE-14361682 — CVE-2025-67644 package tracking.
- NVD — CVE-2025-67644 Detail — Official CVE record (CVSS 7.3 High, CWE-89).
- The Hacker News — LangChain / LangGraph Flaws Expose Files and Agent State — Coverage of LangGraph checkpoint vulnerability class.