TL;DR

RevStealer is a Windows infostealer distributed through a GitHub repository impersonating Anthropic — claude5opus/Claude-Opus-5-Free-Desktop, offering a ClaudeOpus5-desktop.zip (~101 MB) that claims to be a free desktop build of "Claude Opus 5" (a model that does not exist as a free desktop app). Running it launches an invisible Electron loader that decrypts and runs a native stealer targeting browser data, 50+ crypto wallets, 12+ password managers, VPN/remote-access creds, and developer files, streams the loot to a C2 in memory (no on-disk archive), then self-deletes with no persistence. It was flagged by 1 of 66 antivirus engines on first scan and keeps a Polygon smart-contract C2 fallback. Morphisec (2026-08-31) and Help Net / SC Media (2026-09-01) covered it. Do not install "free desktop" AI apps from GitHub release ZIPs; the official Claude apps come from Anthropic's own domains.

What happened

The lure trades on the demand for a local Claude desktop client. The fake repo ships screenshots and model-comparison charts alongside the download to look legitimate; the executable inside opens no window. The chain, per Morphisec Threat Labs (Shmuel Uzan):

  1. Electron loader runs environment checks first — minimum RAM/CPU, hostname/username blocklist, graphics-adapter and debugger-timing checks — and tries to add the user's AppData to Microsoft Defender's exclusion list before proceeding.
  2. It decrypts an embedded AES-256-CBC native payload, which runs weighted anti-VM scoring, terminates on Russian/Ukrainian/Central-Asian locale settings, and gates behind a CAPTCHA to defeat sandboxes.
  3. The stealer collects browser databases and encryption keys, extension storage, Windows Credential Manager, 12+ password managers, 50+ cryptocurrency wallets, VPN and remote-access credentials, messaging apps, game launchers, OBS profiles, clipboard, screenshots, and selected documents.
  4. Loot is streamed to the C2 as it is collected, with no staged archive on disk; a Polygon (MATIC) blockchain smart contract holds a fallback C2 address so operators can rotate infrastructure without rebuilding the malware. After exfiltration it self-deletes — no scheduled task, Run key, or startup entry.

The evasion is the point: Morphisec frames it as built for silence, and it was seen by only 1 of 66 AV engines initially (Help Net Security). RevStealer is also distributed via game-cheat sites, but the fake-Claude GitHub repo is the developer-facing vector and the reason it belongs here: it is the same "impersonate a wanted AI tool" play as the malicious IDE-extension and skill-marketplace waves this repo already tracks, aimed at exactly the people who want an AI coding/desktop tool.

Am I affected?

You are at risk if anyone on a Windows machine downloaded and ran a "Claude Opus 5" desktop build from a GitHub repo or a cheat site. There is no official free "Claude Opus 5 Desktop" ZIP on GitHub — the official Claude desktop and mobile apps come from Anthropic's own properties.

# Did a fake-Claude archive land or run?
Get-ChildItem -Recurse $env:USERPROFILE\Downloads -Filter "ClaudeOpus5*.zip" -ErrorAction SilentlyContinue
Get-MpPreference | Select-Object -ExpandProperty ExclusionPath   # look for an AppData path you did not add

# Electron app that opens no window, launched from an unusual AppData/Temp path,
# is the tell; RevStealer self-deletes, so absence of the binary is not absence of infection.

Because it streams and self-deletes, treat having run it once as full compromise of everything on that machine.

IOCs

Type Value
Malware RevStealer (aka REF2859) — Windows infostealer
Developer lure GitHub repo claude5opus/Claude-Opus-5-Free-Desktop; download ClaudeOpus5-desktop.zip (~101 MB), 64-bit Electron
Behaviour AES-256-CBC-decrypted native payload; anti-VM/CAPTCHA gating; Defender AppData exclusion attempt; in-memory streaming exfil; self-delete, no persistence
C2 resilience Polygon blockchain smart contract holds fallback C2 address
Detection at disclosure 1 / 66 AV engines
Targets browsers, 12+ password managers, 50+ crypto wallets, VPN/remote-access creds, messaging, dev files, clipboard, screenshots

If you are affected

  1. Isolate the machine and treat every credential entered or stored on it as compromised — browser-saved passwords, password-manager vaults, crypto wallets/seed phrases, VPN and cloud/dev credentials.
  2. Rotate from a known-clean device: cloud and AI-provider keys (playbooks/rotating-cloud-credentials.md), GitHub PATs (playbooks/if-your-github-pat-leaked.md), and move any crypto to a fresh wallet.
  3. If the machine ran a local AI agent with live credentials: playbooks/if-your-local-ai-agent-was-exploited.md.

Prevention

→ prevention/package-vetting-checklist.md — a GitHub star count and a screenshot are not provenance; install AI desktop apps only from the vendor's own domain, never a release ZIP that impersonates them. → prevention/credential-hygiene.md — an infostealer's whole yield is what a workstation holds in plaintext; keep long-lived keys and wallet seeds off developer laptops.

Sources