TL;DR

Manifold Security researcher Francisco Rosales disclosed GitSpawn, a vulnerability class in AI coding agents that run git commands (e.g. git status) to gather repository context the moment a folder or repo is opened — without stripping the repository's own .git/config. Git's core.fsmonitor setting (and at least one other, unnamed, still-exploitable key) lets a repo specify a helper program that git executes on any index-refresh operation. A repository shipped with a crafted .git/config therefore runs arbitrary attacker code with the developer's full privileges — before any prompt, tool approval, model call, or workspace-trust dialog, and outside the agent's sandbox. Eight findings were reported across seven agents between July 1 and August 8, 2026; four remained unpatched at publication on 2026-09-01, including a second, distinct Claude Code path (via claude ultrareview) still open as of build 2.1.252.

What happened

core.fsmonitor is a legitimate Git performance feature: its value is a command Git runs to ask a filesystem-watcher helper which files changed, instead of walking the whole tree. Git reads this setting from the repository's own .git/config — not a global, trusted location — and any operation that refreshes the index (git status, git diff, git add, and the repo-context calls agents run on startup) triggers it. An ordinary git clone does not carry a source repo's local .git/config forward, so exploitation requires the poisoned repository to arrive with its .git directory intact — a zip download, a shared drive, a synced folder, a CI artifact, or a "clone this exact tarball" onboarding step all qualify (Manifold Security; paddo.dev).

AI coding agents made this exploitable at scale because they run git status-class commands eagerly, on open, to build context for the model — before the user has clicked through any workspace-trust or sandbox-approval dialog. Manifold's own summary: "no submitted prompt, no model call, no tool approval, no trust prompt. The command executes before [the agent] ever contacts the model." The researcher notes this reintroduces a class of bug VS Code itself patched in 2021 (CVE-2021-43891, fixed 1.63.1, which blocked git operations in untrusted workspaces) — AI coding agents re-added eager git execution on open and reopened the same hole (paddo.dev).

Disclosure timeline (per Manifold): Grok Build reported 2026-07-01 (closed "informative"), Qwen Code reported 2026-07-07 (accepted by Alibaba), Goose reported 2026-07-13, Grok Build re-reported 2026-07-14, Claude Code ultrareview path reported 2026-07-15, Hermes Agent and OpenAI Codex reported 2026-07-20, Cursor reported 2026-08-08, published 2026-09-01.

Per-agent status at publication:

Agent Affected version(s) Status CVE / GHSA
Block goose < 1.44.0 Patched (1.44.0) CVE-2026-72718 / GHSA-r5pp-p5r8-466r (CVSS 4.0: 7.0)
OpenAI Codex CLI/Desktop 0.102.0–0.130.0 (CLI); pre-fix Desktop builds Patched — three CVEs assigned 2026-09-01 (a fourth, CVE-2026-19591, from the same batch — see note below) CVE-2026-19592 (core.fsmonitor), CVE-2026-19590 (core.hooksPath), CVE-2026-19593 (attr.tree + clean filter)
Claude Code — core.fsmonitor path ≤ 2.1.193 Patched (2.1.196, 2026-06-29); no Anthropic advisory published for either Claude Code finding none published
Claude Code — claude ultrareview path (separate, unnamed git-config key) 2.1.210 → 2.1.252 confirmed still vulnerable 2026-09-01 Unpatched. Reported 2026-07-15; closed by Anthropic as a duplicate of an internal ticket. Runs before the workspace-trust prompt is shown. none published
Hermes Agent 0.18.2, 0.21.0 Unpatched. Vendor did not respond across six contact attempts; CVE assigned independently. CVE-2026-71963 (assigned by VulnCheck, an independent CNA)
Alibaba Qwen Code 0.19.6, 0.22.3 Unpatched (report accepted 2026-07-07, no fix shipped by publication) none published
xAI Grok Build 0.2.93, 1.0.13 Unpatched (first report closed "informative"; re-report also unresolved) none published
Cursor / Cursor CLI — Disputed — see note below none published

Note on Cursor's status: Manifold's own summary table and The Hacker News' writeup list Cursor as patched following the 2026-08-08 report. Separate secondary coverage (CyberSecurityNews, a hacklido.com repost) instead lists "Cursor CLI" as unpatched. Manifold is the primary discloser and is the source this repo defers to, but the discrepancy is unresolved as of this writing — treat Cursor's status as unconfirmed rather than fully patched until Cursor publishes its own advisory or Manifold's tracker is checked directly.

This is a distinct, newer disclosure from the already-tracked Claude Code / Claude Desktop GHSA batch, whose CVE-2026-55607 (git-worktree path confusion, affecting Claude Code 2.1.38–2.1.163, fixed in 2.1.163) is a different mechanism and an earlier, already-closed window — do not conflate the two when triaging.

Update 2026-09-12 — the library layer: GitPython CVE-2026-78676 turns a dormant .git/config value into a live core.hooksPath directive (RCE), and aider ships a vulnerable pin

GitSpawn is about agents that shell out to git. The same "repo-local git config becomes code execution" class also lives one layer down, in the Python libraries agents use to read and write git config. GitPython CVE-2026-78676 / GHSA-284h-m62q-gf8w (CVSS 4.0 9.3, published 2026-08-25; fix released 2026-08-10 in 3.1.59, affects ≤ 3.1.58) is a read-then-rewrite injection: GitPython correctly parses a multi-line quoted value from a poisoned .git/config, but write_section() re-serializes it by replacing embedded newlines with bare newline-tab sequences — so the second half of a crafted value becomes an independent config line the next time the file is parsed. An attacker plants a dormant value; any routine GitPython config write (setting user.name, say) activates it into a live directive such as core.hooksPath, and the next hook-triggering git operation runs attacker code. Earlier hardening (commits c417af46, 1ed1b924) guarded programmatic arguments but not the read-then-rewrite path.

Why it belongs with GitSpawn: it is the same trust-boundary failure (a repository's own .git/config is attacker-controlled input, not configuration you can trust) reached through a library rather than a shelled-out command, and it lands in the same tools. aider pins gitpython==3.1.46 (confirmed in aider-chat 0.86.2's dependency metadata, 2026-09-12) — below 3.1.59, so an aider install that has not upgraded its transitive GitPython is exposed when opening a repository carrying a poisoned config. Any agent, script, or CI job that uses GitPython against untrusted repositories is in scope.

# Is a vulnerable GitPython present (directly or transitively, e.g. via aider)?
pip show GitPython 2>/dev/null | grep -E '^(Name|Version):'   # vulnerable if <= 3.1.58
pip install -U 'GitPython>=3.1.59'

Fix is GitPython 3.1.59+ (current release 3.1.62). This does not change the GitSpawn per-agent status table above; it is a related library CVE affecting the same "opening a repo runs its config" surface.

Am I affected?

# Claude Code
claude --version   # unpatched core.fsmonitor path if <= 2.1.196 predecessor builds;
                    # the `claude ultrareview` path is unpatched through 2.1.252 as of 2026-09-01 — check for a newer fix before trusting any version number here

# goose
goose --version    # affected if < 1.44.0

# OpenAI Codex
codex --version    # affected if in 0.102.0-0.130.0 range; confirm against latest release notes

# Any agent: look for a repo-local fsmonitor hook before opening an unfamiliar repo/archive
git config --get core.fsmonitor
git config --get core.hooksPath

You are at risk if you routinely open repositories, extracted archives, or synced folders you did not create yourself in any of the agents above — especially ones delivered as a zip/tarball or copied from a shared location rather than a fresh git clone from a URL you control (a plain clone from a remote does not carry the source's local .git/config).

Update 2026-09-14 — the precedent GitSpawn's write-up did not cite: GitHub Copilot CLI had the same core.fsmonitor bug, via a nested bare repository, patched in May (CVE-2026-45033)

GitHub's own advisory GHSA-9ccr-r5hg-74gf (published 2026-05-06; NVD 2026-05-13; CVSS 4.0 8.5; reporter syvb) describes a variant that does not need the top-level .git/config at all: a bare git repository nested inside a project directory (a vendor/ folder, a deeply nested path) is auto-discovered by git as it walks up the directory tree, and its config — including core.fsmonitor — is applied when Copilot CLI runs a routine git status/git diff. That closes the "a plain clone is safe" loophole for this one vector: a nested bare repo survives a normal clone, a pull request, or a dependency, because it is committed content, not local metadata. Affects @github/copilot ≤ 1.0.42; fixed 1.0.43, which sets safe.bareRepository=explicit via environment variable so git stops discovering bare repositories implicitly.

Two things follow. First, the fix is generic and cheap — any agent that shells out to git can set GIT_CONFIG_PARAMETERS='safe.bareRepository=explicit' (or git config --global safe.bareRepository explicit on the developer's machine) and remove the nested-bare-repo path regardless of vendor patch status; do that today for every agent in the table above, patched or not. Second, this advisory's May precedent means the class was publicly documented four months before Manifold's cluster disclosure, in GitHub's own advisory database, under a product name none of the GitSpawn queries used — the same sourcing gap this repo keeps hitting with vendor-only GHSA disclosures.

# Global mitigation for the nested-bare-repo variant, independent of any agent's patch:
git config --global safe.bareRepository explicit
# Find nested bare repos (a HEAD file next to objects/ and refs/, outside the top-level .git) before opening a checkout in an agent:
find . -type f -name HEAD -not -path './.git/*' -execdir test -d objects \; -execdir test -d refs \; -print 2>/dev/null

If you are affected

  1. Update the affected agent to the patched build listed above; for Claude Code, be aware that no version is confirmed to close the ultrareview path as of this advisory — avoid claude ultrareview against any repository you have not fully reviewed until Anthropic confirms a fix.
  2. Treat any machine that opened an untrusted repo/archive in an affected agent before patching as potentially compromised: audit ~/.ssh/authorized_keys, shell history, and cron/launchd persistence, and rotate any cloud or CI credentials that were present in the environment.
  3. → playbooks/if-your-local-ai-agent-was-exploited.md
  4. Before opening any repository or extracted archive of unknown provenance, inspect .git/config for a core.fsmonitor, core.hooksPath, or attr.tree entry pointing at an executable.

Prevention

→ prevention/agent-sandboxing.md — a sandbox flag is not a guarantee when the executing process is git itself, invoked outside the agent's own command sandbox. → prevention/supply-chain-attack-surface.md — treat "download and open" workflows (zips, shared drives, CI artifacts) as carrying more risk than a plain git clone, since only the former preserves a poisoned local .git/config. → Never run an AI coding agent against a repository whose .git directory you did not create via a fresh clone from a URL you chose.

Note 2026-09-20 — the same 2026-09-01 Codex batch carries a fourth CVE that is not a git-config sink. GHSA-2frj-4qr5-m2rf / CVE-2026-19591 (CVSS 8.8, Codex CLI on Windows/macOS/Linux and Codex Desktop): Codex's command-safety parser read PowerShell's stop-parsing token (--%) differently from PowerShell itself, so an attacker-prepared repository could make Codex run file-writing git commands without approval, modify configuration, and end up executing an attacker-controlled MCP server with the user's privileges (fix: openai/codex PR #22643). Different root cause, same outcome class — a repository steering the agent into an unapproved write — and the same fix window; it is recorded here so a reader reconciling the Codex CVE list against this table is not left with one unexplained id. Affected/patched versions are "unknown" on the database record; run current Codex (see also the separate Heapjack/Overpatch sandbox escapes, fixed 0.149.0).

Update 2026-10-01 — a second GitPython bug in the same class: tracked files named gitdir, commondir and HEAD at a repo root can impersonate the git directory, so index.commit() on a cloned repo runs a tracked pre-commit hook (CVE-2026-87817 / GHSA-239g-whfq-7xj9, High 8.7–8.8; fixed 3.1.60) — and aider's pin is still 3.1.46

The GitHub Advisory Database published GitPython's own advisory GHSA-239g-whfq-7xj9 as a reviewed pip entry on 2026-09-30; the vendor advisory is dated 2026-08-26 and VulnCheck's CVE CVE-2026-87817 followed on 2026-09-09 (CVSS 4.0 8.7; the vendor page scores 3.1 8.8, CWE-94/CWE-427). NVD's description: "GitPython before 3.1.60 fails to properly validate the git directory location, allowing attackers to impersonate the git directory using tracked files like gitdir, commondir, and HEAD. Attackers can execute arbitrary code by placing a malicious pre-commit hook in the tracked hooks directory that executes when a victim calls index.commit() on a cloned or opened repository." The vendor advisory flags CI, scanners and AI code-review/agent tools as the relevant consumers, and notes the same confusion enables config-based file disclosure.

This is a different bug from the 09-12 entry above (CVE-2026-78676, the write_section() read-then-rewrite injection, fixed 3.1.59): that one needed the agent to write config; this one fires on an ordinary commit against a repository whose tracked content is shaped like a .git directory. An agent that clones an untrusted repo, makes a change and commits — the default loop for every "fix this issue" workflow — is the victim. Fix is GitPython ≥ 3.1.60 (PyPI 2026-08-25; current 3.2.0). aider-chat 0.86.2 still pins gitpython==3.1.46 (PyPI metadata re-queried 2026-10-01), two fixes behind; until aider bumps it, pip install -U 'GitPython>=3.1.60' after installing aider, and treat an aider run against an unfamiliar repository as running that repository's hooks.

pip show GitPython 2>/dev/null | grep -E '^Version:'       # vulnerable if < 3.1.60 (and < 3.1.59 for CVE-2026-78676)
# Does a repo you are about to open carry git-directory-shaped tracked files at its root?
git -C <repo> ls-files | grep -E '^(gitdir|commondir|HEAD|hooks/)' 

Update 2026-10-04 — GitPython published six more advisories on 2026-09-30, all fixed in 3.2.0: a positional refspec to Remote.pull() bypasses the --upload-pack unsafe-option guard (GHSA-f9j4-qggq-h239, 9.8), a branch name in a cloned repo becomes --pathspec-from-file on Head.checkout() (7.5, incomplete fix of CVE-2026-78679), ls_remote accepts ext:: URLs (7.5), and three Moderates — the library under the aider pin now has eight advisories this quarter

The GitPython tab (walked 2026-10-04) carries six entries dated 2026-09-30, none with a CVE on its page, all "patched ≥ 3.2.0" (PyPI latest 3.2.0):

  • GHSA-f9j4-qggq-h239 — Critical 9.8 (AV:N/AC:L/PR:N/UI:N, reporter manus-pi): the guard that blocks dangerous git options "only inspects keyword arguments, leaving the positional refspec parameter unprotected," so Remote.pull("--upload-pack=<command>") executes on local-path or SSH transports. Affected ≥ 3.1.30. Workarounds: reject refspecs starting with -, never pass untrusted refspecs, prefer HTTPS remotes.
  • GHSA-23mf-xhv8-69c2 — High 7.5 (reporter 0xMax-Sec): Head.checkout() passes a positional branch name unvalidated, so a repository whose default branch is named --pathspec-from-file=/etc/passwd discloses that file when a victim application clones and checks it out. The advisory calls it an incomplete fix of CVE-2026-78679 and CVE-2026-76217. Affected ≤ 3.1.62 — every release before 3.2.0. This is the GitSpawn shape exactly: the repository's own metadata, not a config value, is the payload, and "open the repo" is the trigger.
  • GHSA-w8jc-g24h-crhw — High 7.5 (reporter wirsbf): Git.ls_remote forwards URLs without check_unsafe_protocols (so ext:: runs a command under permissive transport policy), and Repo.merge_base / IndexFile.move lack check_unsafe_options — "gaps in a multi-year hardening rollout."
  • Moderates: GHSA-fx3j-rwgx-fr94 (separate_git_dir leaks environment variables through a crafted .gitmodules submodule name), GHSA-gq48-pqfc-9p58 (Submodule.move() follows an attacker-committed intermediate symlink outside the worktree), GHSA-m64x-33q8-m5h7 (quadratic backtracking in actor/date parsing).

The aider note from 09-12 stands with a new floor: anything that pins GitPython<3.2 — aider's own pin at the time of that update, and most "git automation for agents" helpers — now carries a 9.8 whose trigger is a string the agent passes to pull() and a 7.5 whose trigger is the name of a branch in a repository the agent was asked to clone. Upgrade to GitPython ≥ 3.2.0; the earlier >=3.1.59 advice in the 09-12 update is superseded.

Update 2026-10-28 — three of GitPython's 2026-09-30 advisories reached the database on 10-27 (the branch-name file read now scored 7.1 on CVSS 4.0, a submodule-name environment leak 6.5, a quadratic-backtracking DoS 8.7); 3.2.1 is current

The database reviewed three of the six 2026-09-30 GitPython advisories on 2026-10-27, none with a CVE, all affected <= 3.1.62 and patched 3.2.0 (PyPI 2026-09-30; 3.2.1 followed on 2026-10-14). GHSA-23mf-xhv8-69c2, the Head.checkout() branch-name file read from the 10-04 update, is scored High 7.1 on CVSS 4.0 with PR:L on the database page, while the reporter's text asks for 3.1 7.5 with PR:N; the 10-04 update printed 7.5 from the vendor page, and both readings now stand. GHSA-fx3j-rwgx-fr94 (Moderate 6.5, CWE-200, reporter baeseungwon1010): Repo._clone() passed separate_git_dir through polish_url() without expand_vars=False, and a submodule name in .gitmodules feeds that value, so clone_from() followed by submodule_update(init=True, recursive=True) on a malicious repository expands environment-variable syntax from the name into a persistent directory name under .git/modules/ and, with debug logging, into a log line. GHSA-m64x-33q8-m5h7 (High 8.7, CWE-1333, reporter BrianWillows): the _re_actor_epoch regex behind parse_actor_and_date() backtracks quadratically on an author, committer or tagger line with no valid epoch or timezone, so a crafted commit in an untrusted repository costs seconds per Commit.author access; a residual of CVE-2026-87819. The shape is the one this file exists for: the repository's own metadata is the input, and "clone it and look" is the trigger. The floor stays GitPython ≥ 3.2.0; the aider pin note from 09-12 and 10-04 was not re-checked this run.

Sources