PhantomRaven, revisited — CrowdStrike attributes the 126-package npm stealer (remote dynamic dependencies, slopsquatted names, CI/CD secret theft) to a self-described bug-bounty hunter who likely had an LLM write the malware and uses stolen developer data to find bounty targets rather than selling it
TL;DR
PhantomRaven was the October 2025 Koi Security find: 126 npm packages, ~86,000 installs, each advertising "zero dependencies" while listing a dependency as an HTTP URL on an attacker server — npm fetches the tarball at install time, scanners that only read the registry never see it, and a preinstall hook steals npm tokens, GitHub credentials and CI/CD environment variables. Package names were chosen to match what LLMs hallucinate when asked for a package (slopsquatting). On 2026-09-18 CrowdStrike Counter Adversary Operations published the actor profile: a financially-motivated operator active since November 2022 who claims to be a bug-bounty hunter with payouts from at least nine companies via Bugcrowd, Intigriti, YesWeHack, HackenProof and HackerOne; CrowdStrike assesses "with high confidence" that the stealer was LLM-generated (verbose per-line comments, placeholder code such as a hardcoded wss://yourserver.com/socket, redundant GET-and-POST exfil, statistical token patterns); and none of the stolen data has surfaced in stealer-log shops, suggesting it is used to find "vulnerabilities" to submit as bounties. Two more packages and eight npm handles (jpd*, npmhell, jpdhackerone11…) are attributed. The technique still works against any pipeline that lets npm install resolve URL dependencies with lifecycle scripts on.
What happened
The 2025 campaign. Koi Security (Oren Yomtov, 2025-10-30) named PhantomRaven after finding packages that declared a dependency as "pkg": "http://<attacker-host>/npm/<name>" instead of a registry reference. npm resolves it, downloads the tarball from the attacker, and runs its preinstall. "Security scanners don't fetch them. Dependency analysis tools ignore them." The payload collected email addresses from Git/npm config, CI environment, GitHub tokens and system fingerprints. Names were typosquats and slopsquats — "PhantomRaven created those non-existent packages" that Copilot/ChatGPT tend to suggest. The Hacker News (2025-10-30) put the count at 126 packages and 86,000+ installs. This repo's ongoing slopsquatting entry covers the naming tactic; PhantomRaven itself was not previously written up here.
What CrowdStrike adds (2026-09-18).
- Mechanism, restated: "The threat actor distributes the malware via typosquatted npm packages that contain minimal, non-malicious code; typically, a simple Hello, world! script. However, the packages also specify a dependency via an HTTP URL rather than a standard npm package reference." Two attributed packages: transform-jsbi-to-bigint (publisher jpdhellonpm1) and sort-imports-es6-autofix (publisher jpd15); both accounts now inaccessible. Related handles: jpd12, jpd13, npmhell, npmpackagejpd, npmtestdharsh, jpdhackerone11, packagedharsh.
- What it steals, precisely: CI variables GITHUB_ACTION, GITHUB_ACTIONS, GITHUB_ACTOR, GITHUB_REPOSITORY, GITHUB_RUN_ID, GITHUB_WORKFLOW, GITLAB_CI, CI_PROJECT_ID, CI_PROJECT_NAME, CI_SERVER_NAME, JENKINS_URL, JOB_NAME, CIRCLE_BUILD_URL, CIRCLE_PROJECT_REPONAME, CIRCLE_USERNAME; npm registry config; package name/version; PATH; OS, architecture, hostname, IPs, PID, Node version, argv, username, Git/npm email, timestamps. The point is fingerprinting which organisation's pipeline installed the package.
- LLM authorship: "This assessment is made with high confidence based on statistical token-analysis patterns as well as verbose comments and placeholder code, which indicate the text is highly consistent with a generated LLM token stream." Examples: a comment before every variable ("Function to detect user email from various sources"), a placeholder WebSocket exfil URL left in production, duplicate HTTP GET and POST exfiltration.
- Actor: active as a bounty hunter since November 2022; in August 2025 claimed to have found an RCE via a malicious npm package; November 2025 initial contact with a potential victim; a GitHub account identified December 2025; a PyPI upload-failure issue filed under the same identity. CrowdStrike: no stolen data on underground markets, "suggesting sole use for identifying bounty opportunities."
- Registry response: npm 12 (June 2026) restricts preinstall scripts, which blunts the execution leg; URL dependencies still resolve.
Why it belongs here. Three of this repo's standing themes meet in one actor: slopsquatting (names an assistant will suggest), install-time execution outside the registry's view, and CI credential theft — with the new wrinkle that the malware itself was, in CrowdStrike's assessment, vibe-coded. The "bounty hunter" framing does not change the impact: an unauthorised preinstall that reads your CI secrets is a compromise whatever the operator intends to do with the results.
Two-source note. Koi's 2025 research (via The Hacker News, 2025-10-30) and CrowdStrike's 2026 analysis are independent; SecurityWeek's 2026-09-18 roundup links CrowdStrike's post. Koi's original blog URL now redirects to a Palo Alto Networks product page (Koi was acquired), so the 2025 figures are cited through THN. Download counts are the 2025 figures; CrowdStrike gives none.
Am I affected?
# URL-valued dependencies anywhere in the tree — the PhantomRaven signature
grep -rhoE '"[^"]+":\s*"https?://[^"]+"' package.json package-lock.json 2>/dev/null | grep -v '"resolved"' | sort -u
jq -r '.packages | to_entries[] | select(.value.resolved != null and (.value.resolved | startswith("https://registry.npmjs.org/") | not)) | "\(.key) -> \(.value.resolved)"' package-lock.json 2>/dev/null
# Were the attributed packages ever installed?
grep -E 'transform-jsbi-to-bigint|sort-imports-es6-autofix' package-lock.json yarn.lock pnpm-lock.yaml 2>/dev/null
# Did an AI assistant suggest a package you never verified exists? Check before install:
npm view <name> time --json 2>/dev/null | head -5
If you are affected
- Treat the runner's
GITHUB_TOKEN, npm token and any secrets exposed as environment variables as stolen:playbooks/if-you-installed-a-bad-npm-package.md,playbooks/if-your-npm-token-leaked.md,playbooks/if-your-github-pat-leaked.md. - Remove the package and rebuild the lockfile from a clean registry-only resolution.
Prevention
npm config set ignore-scripts truefor CI and dev; upgrade to npm 12; block non-registryresolvedURLs in lockfile review.prevention/npm-hardening.md,prevention/ci-cd-hardening.md.- Verify every package an assistant names before installing it —
prevention/package-vetting-checklist.md,ongoing-slopsquatting.md.
Sources
- CrowdStrike — PhantomRaven: LLM-Generated Information Stealer for Bug Bounty Hunting — primary for the 2026 attribution; the RDD mechanism quote, the CI variable list, the LLM-authorship assessment, actor timeline, npm handles. Fetched 2026-09-18.
- The Hacker News — Claimed Bug Bounty Hunter Likely Used LLM to Build PhantomRaven npm Stealer — 2026-09-18; independent summary of CrowdStrike's report, the "over 100 packages" figure, Koi/DCODX prior credit. Fetched 2026-09-18.
- SecurityWeek — In Other News (2026-09-18) — "LLM-generated information stealer distributed through typosquatted npm packages targeting CI/CD environment variables." Fetched 2026-09-18.
- The Hacker News — PhantomRaven Malware Found in 126 npm Packages Stealing GitHub Tokens From Devs — 2025-10-30; the original Koi Security figures (126 packages, 86,000+ installs), Oren Yomtov's "scanners don't fetch them" quote, slopsquatting angle. Fetched 2026-09-18.