TL;DR

Air Security (Or Nevo, Dor Granat, Niv Hoffman) found that the plugin systems of Claude Code, OpenAI Codex, GitHub Copilot and Gemini CLI all "pin" a marketplace plugin to a reviewed commit SHA and then run git checkout <sha> — but never check that HEAD actually resolved to that SHA. Git resolves a ref name before a raw object id, so on any host that permits a branch named with the 40-hex SHA (Bitbucket and self-hosted Git do; GitHub rejects the shape), the repository owner can point that branch at malicious code, and the agent installs it while reporting the pinned, reviewed version. Gemini CLI's three-step install (clone / fetch origin <sha> / checkout FETCH_HEAD) has a sibling flaw: a default branch literally named FETCH_HEAD wins the same way. Because the agents auto-update installed plugins in the background, the swap is zero-click for every developer who ever installed the plugin. Disclosed June 2026; Claude Code fixed in 2.1.179 (npm: 2026-06-16), Codex fixed in 0.146.0 (rust-v0.146.0, 2026-07-29, "Verify Git plugin SHA checkouts"), GitHub Copilot has shipped no fix (GitHub says its host-side branch-name block already prevents exploitation), and Google will not fix Gemini CLI, which it retired for consumer accounts on 2026-06-18 in favour of Antigravity CLI — while still publishing new versions for enterprise Code Assist customers. No CVE has been assigned as of 2026-09-18. Update Claude Code and Codex; on Copilot and Gemini CLI, only install plugins hosted on GitHub, and verify what actually got checked out.

What happened

The bug, in one line. Every one of the four agents "checks out the pinned commit without verifying the checkout landed there" (Air). A marketplace records <repo>@<sha>; the agent clones the repo and runs git checkout <sha>; and Git, given a 40-hex string, prefers a ref of that name over the object of that id. If the repository has a branch whose name is the pinned SHA, checkout lands on the branch tip, HEAD reports the branch, and the agent — which only checks that the command succeeded — records the install as the reviewed commit. Air's recommended fix is the one-liner the agents were missing: after checkout, test "$(git rev-parse HEAD)" = "<pinned-sha>" || abort.

Two variants. - Branch-named-as-SHA (Claude Code, Codex, GitHub Copilot): create a branch whose name is the exact 40-character pinned commit hash, set it as the default branch, put the payload on it. GitHub blocks branch names that look like commit hashes, so plugins hosted there are safe from this variant regardless of agent version; Bitbucket and self-hosted Git servers allow them, and Anthropic's own marketplace documentation lists both as supported plugin backends. - FETCH_HEAD override (Gemini CLI): the install sequence is git clone, git fetch origin <sha>, git checkout FETCH_HEAD. A default branch named FETCH_HEAD is resolved in place of the fetched commit.

Two attack paths (Air). 1. Benign-to-malicious pivot. Publish a clean plugin; pass marketplace review and get pinned; ship a routine update so the marketplace re-pins to a fresh commit; then create a branch named after that commit pointing at the payload. The marketplace still shows the reviewed hash, the agents' background auto-update fetches the branch, and "trusted plugin is silently swapped for a malicious one and auto-installed past the agent's SHA pinning." 2. Repository hijacking. Take over a plugin author's repository (Air's July 2026 SkillJacking work found 925 skills serving ~134,000 agents whose upstream GitHub account, package, domain or cloud-app slot could be claimed; they re-registered the deleted hexiaochun account behind seedance2-api, 11,483 installs on skills.sh, and gained "cloud credentials, their .env, their identity" without changing the listing) and use Plugin4Shell to push malicious code past the pin.

What the plugin gets. A coding-agent plugin runs with the agent's own permissions — the developer's files, shell, environment variables, MCP connections and whatever credentials the agent can reach. Air calls it "a first-of-its-kind AI supply-chain attack"; The Hacker News and Help Net Security both carry the zero-click framing. Air says it built working proofs of concept against all four agents in May 2026.

Vendor responses (Air's disclosure timeline, cross-checked against registries):

Agent Status Detail
Claude Code Fixed Anthropic confirmed the fix 2026-06-17 in 2.1.179. npm view @anthropic-ai/claude-code time shows 2.1.179 published 2026-06-16 (current release 2.1.276). No GitHub Security Advisory was published; the vendor advisory tab's newest entry is still 2026-06-25 and does not mention this.
OpenAI Codex Fixed 0.146.0 (npm 2026-07-29; GitHub tag rust-v0.146.0 release notes list "Verify Git plugin SHA checkouts" #34644). OpenAI's public fix description: "Git can interpret a requested commit SHA as a branch name," so a plugin source could "materialize a different commit than the one it pinned." Air verified the fix 2026-08-12.
GitHub Copilot No fix Air: Microsoft "has not shipped a fix, so users have no patch"; The Register reports Microsoft cited disclosure volume for its non-response and that GitHub's position is that SHA-shaped branch names are blocked on GitHub, which prevents exploitation for GitHub-hosted plugins. The agent-side check is still absent, so a Copilot plugin sourced from Bitbucket or a self-hosted server remains exposed.
Gemini CLI Will not fix Google confirmed on 2026-08-04 that it would not patch and advised migrating to Antigravity CLI. Google's developer blog announced the transition on 2026-05-19 with a 2026-06-18 cutover for AI Pro/Ultra and free Code Assist users; enterprise Code Assist customers keep the legacy CLI, and Google says it "will continue to support Gemini CLI." The npm package is not marked deprecated and shipped 0.60.0 on 2026-09-15 plus nightlies through 2026-09-18 — so "retired" means the consumer entitlement ended, not that vulnerable builds stopped being published.

Why the "marketplace can't fix it" point matters. The pin is resolved by the agent on the developer's machine, so only an agent-side check restores the guarantee. A marketplace can blunt the branch-name variant by accepting only hosts that reject SHA-shaped names, but that bans hosts the agents officially support and does nothing for the FETCH_HEAD variant.

Two-source note. Air's technical write-up (2026-09-17) is the primary; The Hacker News, The Register and Help Net Security (2026-09-17/18) each carry the vendor responses, and the Codex release notes independently confirm the fix commit. The version numbers above were checked against npm's time field this sweep.

Am I affected?

# Agent versions — fixed lines are Claude Code >= 2.1.179, Codex >= 0.146.0
claude --version 2>/dev/null; codex --version 2>/dev/null
npm ls -g @anthropic-ai/claude-code @openai/codex @github/copilot @google/gemini-cli 2>/dev/null

# Where do your installed plugins come from? Anything not on github.com is exposed on Copilot / Gemini CLI.
grep -rhoE 'https?://[^"/]+/[^"]+' ~/.claude/plugins/ ~/.codex/plugins/ ~/.copilot/ ~/.gemini/ 2>/dev/null | sort -u

# For each plugin checkout, does HEAD equal the pinned SHA the marketplace recorded?
for d in ~/.claude/plugins/*/ ~/.codex/plugins/*/ ~/.gemini/extensions/*/; do
  [ -d "$d/.git" ] || continue
  echo "$d $(git -C "$d" rev-parse HEAD) $(git -C "$d" symbolic-ref -q HEAD || echo detached)"
done
# A checkout that is NOT detached (i.e. HEAD is a branch, not a bare commit) is the signal to investigate:
# a correctly pinned install is a detached HEAD at the recorded SHA.

# Branches named like commit hashes in a plugin repo you control or review:
git -C <plugin-repo> branch -r | grep -E '/[0-9a-f]{40}$|/FETCH_HEAD$'

If you are affected

  • Update Claude Code (≥ 2.1.179) and Codex (≥ 0.146.0) — both are months old; if you pin an older version, unpin.
  • On GitHub Copilot and Gemini CLI: remove plugins sourced from Bitbucket or self-hosted Git until the agent verifies checkouts, or vendor the plugin at a commit you have read and disable auto-update. Gemini CLI consumer users should migrate to Antigravity CLI as Google directs; enterprise users should ask Google for a fix commitment, because the package is still being published.
  • If a plugin checkout shows a branch instead of a detached commit, treat the machine as compromised by an unknown plugin payload: playbooks/if-your-local-ai-agent-was-exploited.md, then rotate what the agent could reach — playbooks/rotating-cloud-credentials.md, playbooks/if-your-github-pat-leaked.md.
  • Plugin authors: audit whether your upstream dependencies (GitHub account, npm package, domain, Vercel/Railway app) are claimable — the SkillJacking classes — and protect the repository with 2FA and branch protection.

Prevention

Update — 2026-10-10: Anthropic publishes the Claude Code half as GHSA-pq7j-f95f-qfcv with CVE-2026-86063 (CVSS 4.0 7.7), 115 days after the fix shipped; the id is not yet in CVE Services

On 2026-10-09 the anthropics/claude-code advisory tab gained GHSA-pq7j-f95f-qfcv, "Plugin Commit SHA Pin Bypass Allows Installation of Attacker-Controlled Code", the first vendor advisory for this finding. It carries CVE-2026-86063, CVSS 4.0 7.7 (AV:N/AC:L/AT:P/PR:N/UI:P/VC:H/VI:H/VA:H/SC:N/SI:N/SA:N), CWE-494 and CWE-829, affected @anthropic-ai/claude-code < 2.1.179, patched 2.1.179, and credits Or Nevo Michrowski of Air Security. The description matches Air's write-up: the install flow "checked out a marketplace's pinned commit SHA using git checkout without verifying that the resulting HEAD matched the pinned SHA," so a branch named with the 40-character SHA resolved instead of the reviewed commit; exploitation "required a user to install a malicious plugin, pin to a safe hash, and for the plugin source to be hosted on a git host that permitted SHA-shaped branch names." Anthropic adds that it also affected Claude Desktop's plugin install flow, and that auto-update users already have the fix.

Three things to record. The advisory lands 115 days after the npm fix (2.1.179, 2026-06-16) and 22 days after Air's publication, so a reader who only watches the vendor tab or Dependabot learned of this in October. the CVE Services API returned no record for CVE-2026-86063 on 2026-10-10, the same shape as CVE-2026-103435 last week, a vendor advisory printing an id that CVE Services does not have yet (that one resolved in two days); cite the GHSA and re-check. The Codex, Copilot and Gemini CLI positions are unchanged by this: no new vendor statement for any of the three was found this sweep, so status stays mitigated.

Update — 2026-10-17: CVE-2026-86063 now resolves (GitHub CNA, 2026-10-13); the vendor page re-read prints 7.5 with UI:A where it printed 7.7 with UI:P a week ago

CVE Services now has the record: CVE-2026-86063, CNA GitHub, published 2026-10-13, affected claude-code < 2.1.179, CVSS 4.0 7.5 with vector AV:N/AC:L/AT:P/PR:N/UI:A/VC:H/VI:H/VA:H/SC:N/SI:N/SA:N, CWE-494 and CWE-829, referencing the vendor advisory and the v2.1.179 release. The GitHub Advisory Database row is dated 2026-10-15 (reviewed), and the claude listing carried it that day with the CVE attached. The vendor advisory page, re-read 2026-10-17, prints 7.5 and UI:A (active user interaction); on 2026-10-10 this file recorded 7.7 and UI:P from the same page. The description did not change; the user-interaction metric did, and the score moved with it. Both readings are kept here with their dates. Nothing changes for readers: fixed line 2.1.179, auto-update users already had it, Codex, Copilot and Gemini CLI positions unchanged, status mitigated.

Sources