TL;DR

Aider automatically loads a .aider.conf.yml file from the root of whatever git repository it's launched in. If that file sets test: true with a test-cmd, or a lint-cmd, aider runs the command through a shell (subprocess.Popen(..., shell=True)) — at startup for test-cmd, on first file edit for lint-cmd — with no confirmation prompt, no LLM interaction, and no API key required, and reportedly regardless of --yes. Cloning and running aider inside an attacker-supplied repository is enough to get arbitrary command execution on the developer's machine. Reported to the maintainers on GitHub 2026-06-12; two competing fix pull requests have sat open and unmerged since June; CVE-2026-85674 was published 2026-09-04 with no fixed version available.

What happened

GitHub user geo-chen opened Aider-AI/aider#5254 on 2026-06-12, titled "Opening an untrusted repository with aider executes arbitrary commands at startup via .aider.conf.yml test-cmd / lint-cmd (no confirmation)." Per the issue, aider's config loader (aider/main.py's default_config_files list) picks up .aider.conf.yml from the repository root the same way it would a user's own home-directory config, and a test-cmd/lint-cmd key in that file reaches coder.commands.cmd_test() → cmd_run() → run_cmd(), which executes the string through a shell. The reporter confirmed the command runs "with and without --yes." A companion vector: aider also auto-loads a repo-root .env file with override=True, which can override environment variables the same way.

Two independent fix attempts have been proposed and remain unmerged as of this advisory: #5280 (opened 2026-06-18 by Sarthak816) and #5365 (opened ~2026-06-30), both of which add a confirmation gate for test-cmd/lint-cmd/test/lint/auto-test/auto-lint keys sourced from a repo-local config, with #5280 explicitly designed so the check cannot be bypassed by --yes. As of this advisory neither PR has been merged and Aider-AI/aider/security/advisories lists no published GitHub Security Advisory.

CVE-2026-85674 was published 2026-09-04, describing the same mechanism and confirming it reproduces on 0.86.3.dev (current main at assignment time), with a CVSS 4.0 base score reported as 8.5 by the CVE record aggregator OffSeq (the GitHub issue itself states CVSS 7.8 in its own text) — treat the exact score as unsettled; the important fact both agree on is High severity and an unauthenticated, no-interaction exploitation path. No GHSA has been published for this CVE at the time of writing, so this advisory is marked unconfirmed: the GitHub issue is the primary technical source and the CVE record is a second, independent confirmation that the finding was validated for numbering, but neither is a vendor-published security advisory.

Update 2026-09-13 — a second, unrelated aider CVE with the same "fix PR open for months" shape. CVE-2026-10177 (published 2026-05-31, VulDB-sourced; CVSS 3.1 6.3 Medium, CVSS 4.0 2.1, CWE-918) is a server-side request forgery in aider's web scraper: requests.get in aider/scrape.py's API-docs path (api_docs.py in the record) fetches a URL with no private-network filtering, so a scrape target can be pointed at the AWS EC2 metadata endpoint or other internal addresses. Reported as Aider-AI/aider#5075; the fix, PR #5137 "Guard scraper against private network URLs" (pragnyanramtha, opened 2026-05-16 — blocks loopback/private/link-local/metadata/multicast ranges, revalidates redirects, and pins Playwright to literal IPs against DNS rebinding), has been open and unmerged since May. It affects 0.86.3.dev, the same development version CVE-2026-85674 above reproduces on. This is a different bug class (network-side SSRF, not local command execution) and lower severity, and is logged here rather than in its own file per this repo's same-product rule; the pattern it adds is that aider now has two open CVEs whose community fixes have waited three and four months respectively with no maintainer advisory for either. Status unchanged (unconfirmed, single vendor-unacknowledged finding each). The same reporter, geo-chen, also filed the SWE-agent trajectory-inspector path traversal — a second small agent framework with an unmerged fix and no advisory channel.

Am I affected?

pip show aider-chat   # any version through 0.86.3.dev (current main) is confirmed vulnerable; no fixed release exists yet

# Before running aider in a repo you didn't create yourself, check for the trigger keys:
cat .aider.conf.yml 2>/dev/null | grep -E 'test-cmd|lint-cmd|^test:|^lint:|auto-test|auto-lint'
cat .env 2>/dev/null

You are at risk if you clone and run aider inside any repository whose contents you have not reviewed — a coding challenge, a fork, a PR checkout, or a "try my project" link.

If you are affected

  1. Do not run aider inside an unreviewed repository until a fix ships; if you must, inspect .aider.conf.yml and .env at the repo root first, or run aider outside the repo directory (e.g. via --file) so the repo-root config is not auto-discovered.
  2. If you already ran aider inside an untrusted repository, treat the machine as potentially compromised: review shell history, check for unexpected cron/launchd persistence, and rotate any credentials that were present in the environment at the time.
  3. → playbooks/if-your-local-ai-agent-was-exploited.md
  4. Watch Aider-AI/aider#5254 and PRs #5280/#5365 for a merged fix.

Prevention

→ prevention/agent-sandboxing.md — a coding agent that auto-loads and executes repo-supplied configuration is exactly the "workspace config runs before trust is established" pattern this repo tracks across multiple tools; treat any such auto-loaded config as a code-execution primitive. → prevention/supply-chain-attack-surface.md

Sources