TL;DR

An attacker abused a pull_request_target "pwn request" misconfiguration in the AsyncAPI generator repo's CI to steal the asyncapi-bot GitHub token, then used it to get a malicious commit onto the next branch and trigger the project's own legitimate, OIDC-signed release pipeline — publishing five trojanized packages (@asyncapi/generator, generator-helpers, generator-components, @asyncapi/specs) with a combined ~3M weekly downloads on 2026-07-14. The payload fires at import/require time, pulls a second stage from IPFS, and drops a 744-module RAT ("Miasma") with six C2 channels — including an Ethereum smart contract and BitTorrent DHT — that steals browser/SSH/cloud/npm/GitHub credentials and crypto wallets, and is reported to write persistence into AI-coding-tool config. No patched version has been announced as of this writing — treat any host that ran the affected versions as compromised.

What happened

@asyncapi/generator and its sibling packages are official code-generation tooling from the AsyncAPI Initiative (a CNCF-adjacent spec used to describe event-driven/async APIs), together pulling roughly 3 million downloads a week.

Initial access — a "pwn request." Wiz Research traced the entry point to a pull_request_target-triggered workflow (the repo's docs-preview/Netlify build) that ran with access to repository secrets but checked out the pull request's own code rather than the base branch — the classic "pwn request" GitHub Actions misconfiguration (the same root-cause class already tracked in this repo's Cordyceps advisory). The attacker buried a malicious PR (#2155) among 36 low-signal spam PRs on 2026-07-14 05:08 UTC; the vulnerable workflow ran at 05:16 UTC and exfiltrated the asyncapi-bot personal access token.

Publish — through the project's own trusted pipeline, not a stolen npm token. Socket's independent analysis of the published artifacts traces the actual publish to the repo's release-with-changesets.yml workflow, run under GitHub Actions <npm-oidc-no-reply@github.com> — i.e. the attacker never touched an npm publishing credential at all. A malicious commit landed on the next branch (authored as "Your Name <you@example.com>", GitHub user invalid-email-address) at 06:58 UTC, and the existing release automation did the rest, publishing with valid npm OIDC provenance. (Wiz and Socket describe the compromised-CI-token entry point and the publish-time mechanism from two different angles; both are consistent with a single chain — stolen PAT → malicious commit → the project's own trusted publish workflow fires — but neither source individually confirms every link, so treat the middle step as reported rather than independently re-verified by this advisory.)

Packages and versions:

Package Malicious version(s) Published (UTC)
@asyncapi/generator-helpers 1.1.1 07:10:42
@asyncapi/generator-components 0.7.1 07:10:44
@asyncapi/generator 3.3.1 07:10:48
@asyncapi/specs 6.11.2-alpha.1 08:06:20
@asyncapi/specs 6.11.2 08:30:09

Payload. The malicious code is a small, obfuscated statement injected at module load — it runs on import/require(), not on npm install, so it doesn't need a lifecycle hook at all. It spawns a detached, output-suppressed node -e child process that:

  1. Stage 1 fetches an encrypted blob from IPFS (ipfs.io/ipfs/QmQobZSp1wRPrpSEQ56qnyq7ecZh5Bg5k1fnjt4SUwwHb9, ~8.25 MB) and writes it to a path disguised as Node.js runtime state (~/.local/share/NodeJS/sync.js on Linux, ~/Library/Application Support/NodeJS/sync.js on macOS, %LOCALAPPDATA%\NodeJS\sync.js on Windows).
  2. Stage 2 decrypts that blob (HKDF-SHA256 → AES-256-GCM, with an extra ROT94 transform layer) into a ~3 MB payload that self-identifies internally as "miasma-train-p1" — a 744-module RAT framework.
  3. The framework installs persistence via a miasma-monitor systemd user service on Linux and opens six separate C2 channels: direct HTTP to 85.137.53.71 (ports 8080/8081/8091), Nostr relays, a second IPFS hash, an Ethereum smart contract (0x12c37A86a0Ed0beBe5d1d6a43E42f07860eAc710), BitTorrent DHT, and mDNS.
  4. Target data: browser passwords/cookies (Chrome, Brave, Firefox, Edge), SSH keys, npm/GitHub tokens, AWS credentials, macOS Keychain, and cryptocurrency wallets, plus a remote command channel for arbitrary file operations and exfiltration.

This is the same Miasma/Shai-Hulud lineage already tracked in this repo across several 2026 waves (LeoPlatform+Go, @immobiliarelabs Backstage, Wave 5 Microsoft Azure/mantine-datatable, @redhat-cloud-services) — but a new entry point: prior waves compromised an npm publishing token or a maintainer's GitHub account directly, whereas this wave got there via CI-token theft through a pull_request_target misconfiguration and rode the project's own OIDC-signed publish pipeline, defeating the "check for valid provenance" mitigation this repo has flagged before (see the caution on provenance-as-identity-not-integrity). Wiz's report additionally states the payload writes malicious entries into AI-coding-assistant configuration (.vscode/tasks.json, .claude/settings.json) as an auto-execution/persistence mechanism, consistent with the pattern documented in the Miasma Wave 5 and @immobiliarelabs advisories — flag this specifically for readers of this repo.

Am I affected?

# Check whether any of the compromised versions are in your dependency tree
npm ls @asyncapi/generator @asyncapi/generator-helpers @asyncapi/generator-components @asyncapi/specs --all 2>/dev/null
grep -E '"@asyncapi/(generator|generator-helpers|generator-components|specs)".*"(3\.3\.1|1\.1\.1|0\.7\.1|6\.11\.2(-alpha\.1)?)"' package-lock.json yarn.lock pnpm-lock.yaml 2>/dev/null

# Hunt for the dropped Stage 2 file
find ~/.local/share/NodeJS ~/Library/Application\ Support/NodeJS "$LOCALAPPDATA/NodeJS" -name 'sync.js' 2>/dev/null

# Hunt for the persistence service
systemctl --user list-units | grep -i miasma
ls -la ~/.config/.miasma 2>/dev/null

# Look for outbound connections to the C2 IP
sudo lsof -i | grep 85.137.53.71

IOCs

Type Value
Malicious versions @asyncapi/generator@3.3.1, @asyncapi/generator-helpers@1.1.1, @asyncapi/generator-components@0.7.1, @asyncapi/specs@6.11.2, @asyncapi/specs@6.11.2-alpha.1
Primary C2 85.137.53.71 (ports 8080, 8081, 8091)
IPFS payload hashes QmQobZSp1wRPrpSEQ56qnyq7ecZh5Bg5k1fnjt4SUwwHb9, Qmet4fhsAaWMBUxNDfREHwgiyDeSWy4YSYs9wiKUW5jGyf (react-sdk variant)
Ethereum C2 contracts 0x12c37A86a0Ed0beBe5d1d6a43E42f07860eAc710
Persistence miasma-monitor.service (systemd, Linux); .config/.miasma lock files
Compromise window 2026-07-14, 05:08–08:30 UTC

If any affected version ran on a dev machine or CI runner, treat the host as fully compromised: rotate browser-stored credentials, move crypto wallet funds to a fresh wallet on a clean device, and rotate every cloud/npm/GitHub credential resident in that environment — including any AI-coding-tool API keys or MCP tokens stored in .claude/, .cursor/, or similar config directories.

If you are affected

→ playbooks/if-you-installed-a-bad-npm-package.md → playbooks/rotating-cloud-credentials.md → playbooks/if-your-npm-token-leaked.md → playbooks/if-your-github-pat-leaked.md — this campaign's entry point was a stolen CI PAT, not a developer's own token, but the rotation steps are the same if your org's CI also uses pull_request_target with secrets.

Prevention

→ prevention/ci-cd-hardening.md — audit every pull_request_target workflow in your org for the "pwn request" pattern: it must never check out and execute PR-head code while holding access to secrets. → prevention/supply-chain-attack-surface.md — a green OIDC/provenance badge proves who published a package, not that the build inputs were trustworthy; it does not substitute for pinning and auditing. → prevention/npm-hardening.md — this payload fires on import, not install, so --ignore-scripts provides no protection here; pin dependency versions and diff node_modules on upgrade.

Why this matters for vibe coders

This is the first Miasma-lineage wave documented in this repo where the entry point is CI-token theft via a pull_request_target misconfiguration rather than a compromised npm account or maintainer GitHub credential — meaning the malicious release carried fully valid OIDC provenance from the project's own trusted pipeline. If your team relies on "verified provenance" as a supply-chain signal, this is a concrete example of why that's necessary but not sufficient. It's also the first entry in this Miasma lineage reported to specifically target AI-coding-tool config files as a persistence surface, alongside the already-documented crypto/cloud/browser credential harvesting.

Sources