TL;DR

OpenSourceMalware (Paul McCarty, Jenn Gile; 2026-09-17) found a small campaign of npm packages — The Hacker News lists 13, the primary report 14 (it includes swnwall) — published between 2026-09-12 and 2026-09-16 under names like process-tailwind (v1.1.99), engin1 (v1.3.99), process-lhpm, process-mite, id79-client and six scoped @biz44/id<NN>-client packages. Each runs on import, not on install: an initialize() call spawns a detached Node process that fetches a Base64 payload from an Npoint.io JSON dead-drop, decodes it and executes it via dynamic function instantiation, "ensuring the malicious code never touches disk." The stealer profiles the host and copies Chrome extension storage directories — where wallet extensions keep signing state — across Windows, macOS and Linux, with operator-gated clipboard logging and Windows keystroke capture; campaign ids 10/12/44/79/95/99 are baked into the package names. Gile: "a stripped down stealer that borrows several functions from DPRK's BeaverTail and OtterCookie, but is much smaller." OSM calls the DPRK link "a working investigative hypothesis, not a conclusion." All checked packages now return 404 from the npm registry (2026-09-18). Small blast radius, but two details matter for this audience: process-tailwind is a name an assistant could plausibly suggest, and an import-time payload defeats ignore-scripts.

What happened

Packages (OSM's list, versions where given): process-tailwind 1.1.99, engin1 1.3.99, swnwall 1.2.10, id79-client, process-lhpm, process-mite, @biz44/id10-client, @biz44/id12-client, @biz44/id44-client, @biz44/id79-client, @biz44/id95-client, @biz44/id99-client, @biz44/process-runtime-utils, @biz44/runtime-utils. Neither source gives download counts. This sweep queried the registry for eight of them; every one returned {"error":"Not found"} — removed rather than replaced with the usual 0.0.1-security holder, so no takedown timestamps are available.

Two-stage loader. THN's description: importing the package triggers loader.js, which "retrieves the primary payload from an Npoint dead drop for in-memory execution," and resolves its command server through a second Npoint URL. OSM: on import the package "automatically call[s] initialize()," launching a detached Node.js process that fetches Base64 from the dead-drop URLs, decodes it, and runs it through dynamic function instantiation. Six distinct Npoint resolver URLs and one C2 endpoint were recovered (an IP with a non-standard port; not reproduced here). The payload's SHA-256 is 7b15605f23b131b3eeea57e031ae7cb32fc4b78c7bbb2025aa7a561ea5ae5159.

What it takes. Chrome extension storage on all three desktop OSes ("wallet extension data and signing state"); host reconnaissance (hostname, OS, CPU, RAM, IPs, geolocation via public IP-lookup services); clipboard contents and Windows keystrokes when the operator enables them. OSM notes what is absent: "No wallet-draining code, no hardcoded wallet extension ID list" — it copies the storage wholesale and lets the operator sort it out, which also means credential-manager and session-holding extensions are in scope, not only wallets.

Lineage and attribution. Overlaps with BeaverTail/OtterCookie (the Contagious Interview toolset tracked in PolinRider): Node.js delivery, extension-storage theft, native clipboard and keylogging, and "use of lightweight external configuration to decouple the loader from C2 infrastructure." Divergences: no Socket.IO/WebSocket, no screenshots, no explicit wallet ids, no Python second stage. OSM rates the overlap "behavioral, not dispositive" and its DPRK attribution "low to moderate," resting on the Npoint.io dead-drop habit seen in prior DPRK samples, nested IP/geolocation lookups, and numeric campaign markers resembling the PolinRider cluster — "no exclusive infrastructure or shared code recovered."

Why it is here despite the size. Import-time execution is the rollup-polyfill lesson again: --ignore-scripts does nothing, the first require() does. And the names — process-tailwind, runtime-utils, process-runtime-utils — sit in the space where slopsquatting lives; a developer asking an assistant "what package handles Tailwind process config" could be handed one.

Am I affected?

grep -E 'process-tailwind|engin1|swnwall|id79-client|process-lhpm|process-mite|@biz44/' package-lock.json yarn.lock pnpm-lock.yaml package.json 2>/dev/null
ls node_modules/@biz44 node_modules/process-tailwind node_modules/engin1 2>/dev/null
# The second-stage hash, if you capture Node's in-memory payloads or have EDR file/script telemetry:
# 7b15605f23b131b3eeea57e031ae7cb32fc4b78c7bbb2025aa7a561ea5ae5159
# Outbound connections from node to npoint.io JSON endpoints from a build or dev host are the network signal.

If you are affected

Prevention

Sources