Next.js July + August 2026 Security Releases — 9 CVEs in July, then two critical unauthenticated RCEs in August (AVIF, Windows CVE-2026-75604)
TL;DR
Vercel shipped the first entry in Next.js's new formal Security Release Program: 9 CVEs (4 high, 5 medium) fixed in Next.js 16.2.11 (Active LTS) and 15.5.21 (Maintenance LTS), published 2026-07-20 (one day later than the originally announced 2026-07-20 target — the post itself was updated to say "now expected on July 21"). The headline issue, CVE-2026-64642, is a middleware/proxy bypass for App Router apps built with Turbopack and a single locale — any auth or security check your middleware performs is silently skipped. Also in the batch: an unauthenticated SSRF/open-redirect via attacker-controlled rewrite/redirect destination hostnames (CVE-2026-64645), an SSRF in Server Actions on custom servers (CVE-2026-64649), a Server Actions CPU-exhaustion DoS (CVE-2026-64641), and four cache-confusion / disclosure issues. Upgrade now — this is the first release under Vercel's new pre-announced monthly cadence (see advisories/2026-05-nextjs-react-security-release.md for the May 2026 predecessor rollup).
What happened
On 2026-07-13, Vercel announced it was moving Next.js to a formal, pre-announced monthly security release program — publishing severity counts (and only severity counts) a week ahead of the actual patch, so defenders get lead time without handing attackers a target list before a fix exists. The first release under this program landed 2026-07-20/21, fixing 9 issues:
CVE-2026-64642 — Middleware/Proxy bypass (Turbopack + single locale) — High
App Router applications built with Turbopack and exactly one entry in config.i18n.locales bypass middleware entirely. Any authentication or authorization check implemented in Next.js middleware is skipped for affected requests — the same "auth relies solely on middleware" failure mode this repo has flagged repeatedly (see the May 2026 rollup's CVE-2026-44574 middleware bypass, and the original CVE-2025-29927 middleware-auth-bypass class).
CVE-2026-64645 — SSRF/Open Redirect via rewrite/redirect destination hostname — High
A rewrites() or redirects() rule that builds its external destination hostname from request-controlled input can be redirected to an arbitrary hostname, regardless of the rule's intended hostname suffix. For rewrites() this is server-side request forgery (the Next.js server itself makes the outbound request); for redirects() it's an open redirect against the end user.
CVE-2026-64649 — SSRF in Server Actions on custom servers — High
When a Server Action forwards or redirects a request on a custom server deployment, an attacker who controls Host-associated request headers can steer the server's outbound request to an attacker-chosen host.
CVE-2026-64641 — Server Actions CPU-exhaustion DoS — High
Crafted requests against any App Router app with at least one Server Action cause excessive CPU usage that blocks the whole process from serving further requests — an unauthenticated denial-of-service, similar in shape to the CVE-2026-23869 Server Action DoS from the May 2026 rollup but a distinct code path.
Medium-severity cluster
- CVE-2026-64644 — Image Optimization API DoS via malicious remotely-hosted SVGs (only applies to self-hosted deployments with remote image loading configured — not on by default).
- CVE-2026-64646 — Unbounded Server Action payload causes memory exhaustion in the Edge runtime.
- CVE-2026-64643 — Server Action /
use cacheendpoint IDs can be globally disclosed to an unauthenticated caller, aiding reconnaissance for a broader attack chain. - CVE-2026-64648 and CVE-2026-64647 — Two variants of the same bug: a server-side
fetch(new Request(init), aDifferentInit)call can return a cached response body from a different request to the same URL, either for requests with different bodies (-64648) or specifically when the body contains invalid UTF-8 byte sequences (-64647) — a cache-confusion class that could leak one user's response to another.
Am I affected?
grep -E '"next":' package.json
npm ls next 2>/dev/null | head -3
- Using Turbopack (
next build --turbo/next dev --turbo) with App Router and exactly onei18n.localesentry? You're exposed to the middleware bypass (CVE-2026-64642) until patched — treat any middleware-enforced auth as currently bypassable. - Using
rewrites()/redirects()with a destination hostname built from request data (headers, query params, path segments)? Check for CVE-2026-64645 exposure. - Running on a custom server (not
next startalone) with Server Actions that forward/redirect requests? Check CVE-2026-64649. - Any App Router app with Server Actions enabled is potentially exposed to the CPU/memory DoS pair (CVE-2026-64641, CVE-2026-64646) regardless of hosting provider.
If you are affected
- Upgrade immediately:
npm install next@15.5.21(15.5.x LTS) ornpm install next@16.2.11(16.2.x LTS). The fixes are also in16.3.0-canary.92/16.3.0-preview.7ahead of the 16.3.0 stable release. - If you use Turbopack + single-locale i18n, re-verify that middleware-enforced auth actually returns 401/403 for protected routes after upgrading.
- Audit
rewrites()/redirects()configs for any destination hostname derived from request-controlled input; hardcode destinations where possible instead of deriving them dynamically. - No IOCs to check — these are unauthenticated logic/DoS bugs, not an active campaign; there's no indication of in-the-wild exploitation prior to this disclosure.
Why this matters for vibe coders
Next.js is the default framework behind a large fraction of Lovable, Bolt, v0, and Cursor/Claude Code-generated web apps. This is also the first release under Vercel's new monthly security-release cadence — expect a similar batch roughly every month going forward, each pre-announced a week ahead with only a severity count, then followed by the actual CVE details on release day. Bookmark nextjs.org/blog or subscribe to Vercel's changelog if you run Next.js in production; treat the pre-announcement as your signal to plan an upgrade window, not as something to act on before the patch exists.
Prevention
→ prevention/credential-hygiene.md — defense-in-depth even when your framework is patched.
→ Don't rely on middleware as your sole auth boundary; enforce authorization again in the route handler / Server Action itself.
→ Pin a Dependabot / Renovate auto-merge policy for next security releases now that they're on a predictable monthly cadence.
→ Avoid building rewrites()/redirects() destination hostnames from any request-controlled value (headers, query params, path segments).
Update — 2026-08-21: Vercel pre-announces an August 26 release fixing one critical vulnerability
On 2026-08-20, Vercel published the second pre-announcement under the same Security Release Program described above. Everything it discloses (fetched directly from the Next.js blog):
- Release date: 2026-08-26.
- Scope: one critical-severity vulnerability. No CVE id, no affected-version range, and no technical detail are disclosed yet — that is the program working as designed, since publishing a target list before a patch exists helps attackers more than defenders.
- Versions that will ship: 16.3.3 and 15.5.24, published alongside the full advisory.
What to do before 2026-08-26. There is nothing to patch yet and no way to tell whether your app is in scope, so the useful work is preparation rather than mitigation: confirm which Next.js line each of your apps is on, make sure you can cut an upgrade to 16.3.3 / 15.5.24 the same day rather than waiting for a sprint boundary, and note that this is the first critical-rated Next.js issue since the May 2026 13-CVE rollup — the July batch topped out at high. Given this repo's tracked history of Next.js middleware-auth bypasses (CVE-2025-29927, CVE-2026-44574, CVE-2026-64642 above), an app whose authorization lives only in middleware is worth reviewing now regardless of what the 26th turns out to bring.
This entry will be updated with the actual CVE detail once the release publishes.
Update — 2026-09-10: the August release shipped a day early (2026-08-25) with two critical unauthenticated RCEs, not one — patch self-hosted apps to 16.3.3 / 15.5.24
The pre-announced release was pulled forward to 2026-08-25 after Vercel "identified an additional critical severity vulnerability in one of our upstream dependencies" (its own words on the release post). Both issues are unauthenticated remote code execution, both fixed in Next.js 16.3.3 (Active LTS) and 15.5.24 (Maintenance LTS), and the severity of this advisory is bumped from high to critical accordingly.
Unauthenticated RCE in the Image Optimization API via AVIF — Critical, CVSS 4.0 9.5, no CVE
GHSA-2xp9-vwfh-vxw4 (Next.js) tracking GHSA-g89c-p67h-r497 in libheif, the HEIF/AVIF decoder that sharp uses under Next.js's next/image optimizer. When the optimizer processes an attacker-controlled AVIF image, a flaw in libheif can lead to code execution on the server. Affects Next.js ≥ 10.0.0 < 15.5.24 and all 16.x < 16.3.3. The patched releases disable AVIF optimization entirely until the upstream fix propagates — so if you rely on AVIF output, expect a format change, not just a security fix. The Hacker News' coverage narrows exposure to deployments that explicitly added image/avif to the images.formats configuration and credits rootxharsh (finder) and KarimPwnz (coordinator), with Vercel's changelog crediting the Hacktron team; the GHSA itself lists no credits.
Unauthenticated RCE on Windows-hosted servers — Critical, CVSS 3.1 9.0, CVE-2026-75604
GHSA-p293-qw3h-jr36. Applications that use both the Pages Router and App Router without Cache Components, served from a Windows filesystem, are vulnerable to a path-traversal (CWE-22) issue that escalates to remote code execution. Affects ≥ 13.4 < 15.5.24 and ≥ 16.0 < 16.3.3. Linux and macOS are not affected. Vercel's advisory: "There is no known workaround for affected windows-hosted applications. You should upgrade immediately if your server is hosted on Windows." Credited to evolutionstorm and B0RI.
Vercel-hosted apps are protected from both without upgrading (per The Hacker News' summary of the release post); everyone self-hosting — Docker, Node on a VM, a Windows IIS box, the "deploy anywhere" template a vibe-coding platform emitted — has to ship the version bump.
# Which line are you on, and are you below the fix?
node -e 'console.log(require("next/package.json").version)'
grep -n 'avif' next.config.* 2>/dev/null # AVIF exposure check
node -e 'console.log(process.platform)' # win32 = the CVE-2026-75604 case
npm install next@15.5.24 # 15.x line
npm install next@16.3.3 # 16.x line
Two program notes. First, this is the second consecutive release where the pre-announcement's count was lower than what shipped (July pre-announced 9 and shipped 9; August pre-announced 1 critical and shipped 2) — treat the pre-announced count as a floor. Second, the AVIF issue is the first Next.js critical whose root cause is a transitive native dependency (sharp → libheif), which npm audit on next alone would not have flagged; it is the same "the framework's image pipeline is a C library" exposure that the React2Shell / RSC cluster is not, and it will recur.
Update — 2026-09-14: it recurred — the same libheif bug is a CVSS 9.8 unauthenticated RCE in Astro < 7.2.8
GHSA-26w7-cxv4-gfx2 (Astro, published 2026-08-27, reviewed into the advisory database 2026-09-08, no CVE): "Remote code execution through AVIF image optimization." The root cause is the identical upstream libheif GHSA-g89c-p67h-r497, reached through Astro's default Sharp image service when it processes untrusted AVIF input. CVSS 3.1 9.8 (network, no privileges, no interaction; CWE-125/CWE-787). Affects all Astro < 7.2.8; fixed in 7.2.8 (npm 2026-08-26), which requires sharp ≥ 0.35.4. Astro is the other framework vibe-coding platforms emit for content sites, and it fixed the bug one day after Next.js's 08-25 release without a matching announcement of its own.
The generalisable point is the one flagged above: a native-dependency bug fans out across every framework that bundles the same library. When one framework ships a sharp/libheif fix, search the advisory database for the upstream id, not the framework name — and check anything else with an image-optimisation step (Nuxt Image, Gatsby, SvelteKit's @sveltejs/enhanced-img, and any hand-rolled sharp route) against sharp ≥ 0.35.4.
node -e 'console.log(require("astro/package.json").version)' 2>/dev/null # need >= 7.2.8
npm ls sharp 2>/dev/null # need >= 0.35.4 everywhere it resolves
Update — 2026-10-01: Empirical Security reports in-the-wild activity against the Windows RCE (CVE-2026-75604) from its own sensors since 2026-09-18 and a public Metasploit module; the scoping line "Linux and macOS are not affected" is how teams are closing it wrongly, and the Server Actions key should be rotated after patching — the advisory never says so
Empirical Security's "October 2026 CVE of the Month" (published around 09-30) picks CVE-2026-75604 and adds three things the vendor advisory does not. Exploitation: Empirical's sensor network first saw activity against the bug on 2026-09-18, with the most recent on 09-24; its exploitability model moved the CVE from the 14th to the 98th percentile of all scored CVEs, a public Metasploit module exists, and it is not on CISA KEV. Empirical is candid that this is one sensor source and that some activity may be testing — so this advisory keeps status: patched rather than promoting to active, and records the signal with its date. Preconditions, precisely: the exploit needs Windows hosting, both the Pages Router and the App Router with Cache Components off (the CVE text says "or"; Vercel's advisory and the Metasploit module require both), the default on-disk incremental cache (a custom cacheHandler to Redis/S3 should not reach the vulnerable path, though the advisory does not state that carve-out), and — for the public exploit — a dynamic ISR Pages route plus a dynamic cached App route, plus at least one Server Action that captures a form field in a closure. The traversal (..%5C in a route segment) reads server-reference-manifest.json, which holds the key Next.js uses to encrypt Server Action arguments; with it, forged Server Action calls run as the Node process. Remediation gap: the Next.js docs say a new Server Actions key is generated per build, but the key is cached in .next/cache/.rscinfo for up to 14 days and reused across rebuilds that keep that folder, and multi-server deployments pin it via NEXT_SERVER_ACTIONS_ENCRYPTION_KEY — a pinned key survives any upgrade. If an affected app ever ran on Windows, rotate the key after patching; upgrading alone may not change it. Also noted: the CVE was "reserved but public" for a week (advisory 08-25, CVE record 09-01) and reached the GitHub Advisory Database — Dependabot, npm audit, OSV — only on 09-08, so intake keyed on database entries was two weeks behind the vendor post.
# Close "not affected" on evidence, not on the package version:
# - any Windows runtime for this app (IIS + HttpPlatformHandler/iisnode/ARR, node.exe running `next start`, Windows App Service plans, Windows containers)?
# - both routers present, Cache Components off, default filesystem cache?
ls app pages 2>/dev/null; grep -n 'cacheComponents\|cacheHandler' next.config.* 2>/dev/null
# If yes and the app was ever below 15.5.24 / 16.3.3: rotate the Server Actions key
rm -rf .next/cache/.rscinfo && unset NEXT_SERVER_ACTIONS_ENCRYPTION_KEY # then set a NEW pinned key for multi-server deployments and rebuild
# Edge/WAF stopgap until every app is upgraded: block %5C / %255C (any case) or a literal backslash in the request PATH (not query), raw and once-decoded
Sources
- Next.js — Security Release and Our Next Patch Release (announcement, 2026-07-13)
- Next.js — July 2026 Security Release (full CVE list, published 2026-07-20)
- GitHub Security Advisories — vercel/next.js (GHSA-6gpp-xcg3-4w24, GHSA-p9j2-gv94-2wf4, GHSA-89xv-2m56-2m9x, GHSA-m99w-x7hq-7vfj, GHSA-4c39-4ccg-62r3, GHSA-68g3-v927-f742, GHSA-4633-3j49-mh5q, GHSA-q8wf-6r8g-63ch, GHSA-955p-x3mx-jcvp)
- Cybersecurity News — Next.js Launches Monthly Security Release Program as First Update Patches 9 Vulnerabilities
- GBHackers — Next.js Announces July Security Release to Fix 4 High-Severity and 5 Medium Flaws
- Next.js — Upcoming Next.js August Security Release (pre-announcement, published 2026-08-20) — added 2026-08-21: the 2026-08-26 date, the single critical-severity count, and the 16.3.3 / 15.5.24 target versions.
- Next.js — August 2026 Security Release (published 2026-08-25) — fetched 2026-09-10 for the 2026-09-10 update: the pulled-forward date, both vulnerabilities, the AVIF-disabled mitigation, "no known workaround" for Windows, the 16.3.3 / 15.5.24 versions.
- GitHub Security Advisory — GHSA-p293-qw3h-jr36: Unauthenticated Remote Code Execution on windows-hosted servers (CVE-2026-75604) — fetched 2026-09-10: CVSS 9.0, CWE-22, affected ranges ≥13.4 <15.5.24 and ≥16.0 <16.3.3, reporter credits, published 2026-08-25.
- GitHub Security Advisory — GHSA-2xp9-vwfh-vxw4: Unauthenticated Remote Code Execution in Image Optimization API when AVIF files are used — fetched 2026-09-10: CVSS 4.0 9.5, no CVE, affected ranges ≥10.0.0 <15.5.24 and <16.3.3, libheif GHSA-g89c-p67h-r497 reference.
- The Hacker News — Next.js Patches Critical AVIF and Windows Flaws Enabling Unauthenticated RCE — fetched 2026-09-10; published 2026-08-27: the
image/avif-in-formatsexposure condition, researcher credits, and the "Vercel-hosted applications are protected … and require no upgrade" statement. - GitHub Advisory Database — GHSA-26w7-cxv4-gfx2: Astro remote code execution through AVIF image optimization — fetched 2026-09-14 for the 2026-09-14 update: CVSS 9.8, affected < 7.2.8 / fixed 7.2.8,
sharp≥ 0.35.4 requirement, upstream libheif GHSA-g89c-p67h-r497 reference, published 2026-08-27 / reviewed 2026-09-08. - npm registry —
astro— queried 2026-09-14 (npm view astro time): 7.2.7 published 2026-08-25, 7.2.8 published 2026-08-26. - 2026-10-01 update sources — Empirical Security — October 2026 CVE of the Month: The Next.js RCE Behind "Not Affected" (CVE-2026-75604) (fetched 2026-10-01: sensor activity 2026-09-18 → 09-24, percentile history, Metasploit preconditions, the
.rscinfo14-day key cache andNEXT_SERVER_ACTIONS_ENCRYPTION_KEYrotation advice, the RBP timeline and 09-08 database date, the WAF rule, Tenable plugin 342568 and Fastly virtual patch); NVD API — CVE-2026-75604 (CNA GitHub, published 2026-09-01, CVSS 3.1 9.0; re-queried 2026-10-01); CISA KEV JSON (checked 2026-10-01: not listed).