TL;DR

CVE-2026-62247 (GitHub CNA, published to NVD 2026-09-21, CVSS 3.1 6.5 Medium) is a Realtime Authorization bug in Supabase Realtime ≤ 2.111.1: the server "did not correctly honor per-extension RLS policies presence.read under specific conditions." A client on a private channel whose policy allowed presence.write but explicitly denied presence.read still received presence_diff messages, which "contain every other member's presence metadata" — whatever the app tracks in presence state: live location, who is online, "currently viewing" rosters, typing indicators tied to user ids. Confidentiality only; postgres_changes row data and broadcast are unaffected; apps where presence read and write are granted uniformly have no differential and are not exposed. Found by Cipher / Causal Security; fixed in 2.111.2 (released 2026-06-23, "ensure presence.read permission is respected"), vendor advisory published 2026-06-25. The CVE arrived three months later — if you self-host Realtime, check the image tag, not the news.

What happened

The mechanism. Supabase Realtime Authorization gates private channels with Row Level Security policies on the realtime.messages table, evaluated per extension — broadcast and presence — and per operation (a SELECT policy grants read, an INSERT policy grants write). The supported-but-uncommon shape is a channel where members may publish their own presence but only some members may see the roster: "members may chat, but only admins may see the roster," in the advisory's words. Before 2.111.2, a client authorised for presence.write and denied presence.read was still sent the presence_diff events the server emits when members join, leave or update their state, so the denied client received the full presence payload of every other member on the channel.

The vendor's framing (GHSA-rcr8-2525-4r7p). "Realtime Authorization did not correctly honor per-extension RLS policies presence.read under specific conditions." Impact: any presence metadata the application treats as restricted leaks "to every presence-write-authorized member of a private channel." The advisory is explicit about the boundary: no integrity or availability impact, postgres_changes unaffected, and no exposure "where presence.read is uniform." CWE-863 Incorrect Authorization; affected <= 2.111.1, patched >= 2.111.2; reporter credited as cipher-creator, "Found by Cipher / Causal Security."

The fix and the dates. Release v2.111.2 landed on 2026-06-23 with one line under Bug Fixes — "ensure presence.read permission is respected (#1969)" — two days before the advisory was published on the vendor repo (2026-06-25). The release note does not mention the advisory or a CVE; the link between them is the advisory's patched-version field. NVD's record (CVSS:3.1/AV:N/AC:L/PR:L/UI:N/S:U/C:H/I:N/A:N) is dated 2026-09-21, and the GitHub Advisory Database had not yet mirrored the vendor advisory when this was written (the github.com/advisories/GHSA-rcr8-2525-4r7p URL returned 404; the supabase/realtime repo URL resolves). The recurring shape: a CVE date is not a disclosure date, and the vendor tab is where the real one lives.

Who this reaches. Supabase's hosted platform runs Realtime on its own upgrade schedule and the advisory does not state when hosted projects moved past 2.111.1; the actionable population is self-hosters (the official docker-compose stack pins a supabase/realtime image tag) and anyone who forked the server. The at-risk design is common in exactly the apps this audience ships: a "live cursors / who's online" feature bolted onto a Supabase app where the roster is supposed to be admin-only, or presence state that carries a user's location or the document they are viewing.

Why it matters for vibe coders. Supabase is the default backend of the AI-scaffolded stack, and Realtime Presence is the feature an assistant reaches for when asked for "show who's online." Presence state is arbitrary JSON the client publishes — assistants routinely put user ids, display names, emails, current page, geolocation in it. RLS is the control everyone is told to rely on (Supabase MCP lethal trifecta, Supabase Auth OIDC bypass); this is a case where a correctly written policy was not enforced by the component that was supposed to apply it. Medium severity, narrow precondition, but the failure mode — "the policy said no and the server sent it anyway" — is the one that invalidates a whole class of "RLS protects it" reasoning until the server is patched.

Am I affected?

  • Affected if: you run Supabase Realtime ≤ 2.111.1 (self-hosted) and at least one private channel has a presence policy where write is allowed and read is denied for some members (differential presence visibility).
  • Not affected if: Realtime ≥ 2.111.2; presence read and write are granted to the same set of members; you only use public channels or only broadcast / postgres_changes.
# Self-hosted: which Realtime image is running?
grep -n "supabase/realtime" docker-compose.yml          # image tag < v2.111.2 = affected
docker ps --format '{{.Image}}' | grep realtime

# Do you have a differential presence policy? Look for presence policies on realtime.messages
# where a SELECT (read) policy is narrower than the INSERT (write) policy.
psql "$DATABASE_URL" -c "select policyname, cmd, qual, with_check from pg_policies where schemaname='realtime' and tablename='messages';"

# Grep the app for presence payloads that carry sensitive fields
grep -rn "\.track(" --include=*.ts --include=*.tsx --include=*.js . | grep -v node_modules

If you are affected

  1. Upgrade Realtime to ≥ 2.111.2 (bump the image tag, restart; hosted projects: confirm with Supabase support if you rely on differential presence policies).
  2. Assume that, for the window your deployment ran an affected version, every presence-write-authorised member of a differential channel could see every other member's presence state. If that state carried location, viewing activity or identifiers you treat as private, evaluate it as a disclosure (auditing-a-vibe-coded-repo.md covers the data-inventory step).
  3. Reduce what presence carries: publish a short opaque id and resolve names/locations server-side behind an authorised query, rather than pushing the sensitive fields into the presence payload itself.

Prevention

  • Keep presence payloads minimal. Presence state fans out to every reader by design; a policy bug (this one) or a design slip (uniform read) exposes all of it. Put identifiers in, keep PII out.
  • Track the vendor's advisory tab for every self-hosted Supabase component — supabase/realtime, supabase/auth, supabase/storage-api, supabase/postgrest — not only the supabase/supabase repo, whose tab is empty; the CVE for this bug lagged the fix by three months.
  • Pin and update self-hosted images on a schedule. The docker-compose stack pins tags; a pinned tag that never moves is a pinned vulnerability. prevention/ci-cd-hardening.md.
  • Test authorization negatively: for each private channel policy, join as a denied user and assert the events do not arrive — the advisory's bug is invisible to positive-path tests.

Update 2026-09-24 — a second, worse Realtime bug, published today with no patched version: any broadcaster can splice raw bytes into every other subscriber's JSON frame and forge postgres_changes events — on public channels with only the anon key (GHSA-9vjf-j9f7-j42c, CVSS 8.2)

On 2026-09-24 the supabase/realtime maintainers (published by edgurgel) opened GHSA-9vjf-j9f7-j42c — "Client-supplied bytes are spliced unvalidated into other subscribers' JSON frames, letting any broadcaster forge Realtime protocol events (including postgres_changes) to every other client on the channel." High, CVSS 3.1 8.2, CWE-20 / CWE-116, affected ≤ 2.137.14, patched versions: none listed, reporter Elias Hasas (@zer0d4y5). No CVE yet, and the GitHub releases page shows v2.137.15 through v2.138.1 on 2026-09-23 with no security note.

Mechanism, per the advisory. The binary broadcast path (decode_binary/1) accepts the client's payload without parsing it. When the server re-serialises the message for subscribers on the V1 serializer, it wraps those bytes in a Jason.Fragment, which the JSON encoder inserts verbatim into the outgoing envelope — so a broadcaster who sends a payload that closes the broadcast object and continues with attacker-chosen top-level fields rewrites the frame every other client receives. Because of Erlang map iteration order "all fields except topic can be overwritten." Consequences the advisory spells out: forged postgres_changes notifications "with attacker-controlled schema, table, operation, and record data — requiring no database write permissions"; forged phx_close messages that make subscribers "silently stop receiving channel events"; and unparseable JSON that throws in victim clients. V2-serializer subscribers are protected by length-prefixed binary framing. And the authorization boundary is the part that matters for this audience: "On a public channel no authorization of any kind is involved: the anon key is published in every client bundle by design, and public channels run with policies: nil" — so anyone who can read your bundle can broadcast, and anyone who can broadcast can make every connected client believe a row was inserted, updated or deleted.

What this means. A React/Next.js front end that subscribes to postgres_changes to update a cart, a dashboard, a chat thread or an order status — the standard Supabase pattern — will render attacker-fabricated rows, and an app that acts on those events (sends an email, marks an order shipped, updates local state that later gets written back) is driven by them. The bug is in the server, so it reaches Supabase-hosted projects as well as self-hosters; the advisory does not say whether hosted Realtime has been updated, and there is no version to check against because none is listed as fixed. This file's status moves to ongoing and severity to high on that basis; it will return to patched when a fixed release is named.

Until a fix ships: (1) do not let clients broadcast on channels where other clients consume postgres_changes — use separate channels for client broadcast and for database changes, and make the postgres_changes channels private with RLS policies that deny broadcast writes; (2) prefer the V2 serializer in clients where the SDK exposes it; (3) never let a postgres_changes event trigger a write or an external action without re-reading the row from the database; (4) self-hosters, watch supabase/realtime releases for the fix and pin to it the day it lands.

Update 2026-10-28 — a third Realtime advisory (2026-10-20): a tenant named <victim>-private shares the victim's private-channel topic, so multi-tenant self-hosters with client-chosen tenant IDs leak private channels (GHSA-2rcv-vpjw-5g6c, 7.6); fixed 2.146.0; the 09-24 splice bug still lists no fix

GHSA-2rcv-vpjw-5g6c — "Unsanitized delimiter injection enables cross-tenant access to private channels", published 2026-10-20, High, CVSS 4.0 7.6 (AV:N/AC:L/AT:P/PR:L/UI:N/VC:H/VI:H/VA:N), CWE-140, CWE-639 and CWE-653, reporter Snehil-Shah, remediation reviewed by edgurgel, no CVE. Realtime marks a private channel by appending -private to the tenant ID when it builds the PubSub topic, and tenant IDs are not format-validated, so a tenant whose ID is <victim_id>-private lands on the same topic as the victim's private channel; public channels skip RLS authorization, so the attacker's tenant reads and writes the victim's protected messages. Affected 2.29.7 before 2.146.0, fixed 2.146.0. The advisory says Supabase's own platform is not affected because its tenant IDs are fixed-format project refs; the exposure is any provider that runs Realtime for several tenants and lets clients choose tenant identities. The 09-24 splice-and-forge advisory (GHSA-9vjf-j9f7-j42c, 8.2) still prints "Patched versions: None" when read 2026-10-28, so this file stays ongoing.

Sources