Claude Code puts the account email in every model prompt; users report it in git commits, headers and web requests (issue #81138)
TL;DR
Claude Code reads the signed-in account's email address from ~/.claude.json and places the sentence "The user's email address is …" in the model's context on every request, with no setting to turn it off; the open issue #81138 (2026-07-25) has reports from fifteen commenters, including the model writing the address into ten git commits as user.email, into an HTTP User-Agent header, and handing it to a web service from a subagent, and no reply from Anthropic as of 2026-10-29. If your commits, logs or outbound requests from agent sessions carry an address you did not configure, this is where it came from; API-key authentication is the only reported path that omits it.
What happened
The behaviour. The issue's reporter (skflowne) decompiled the bundle: when ANTHROPIC_UNIX_SOCKET is unset, the client reads oauthAccount.emailAddress and adds a userEmail field to the user-context block. In 2.1.220 the text was the bare address; 2.1.246 appended "Use it only to identify the user… Never send it to an unrelated service… unless the user explicitly asks"; a 2.1.289 report places it inside a <system-reminder> attached to every outbound Messages API request, including the requests that follow tool results within a turn. The reporter found no consumer of the value in the bundle other than a telemetry flag recording its presence (has_user_email). IS_DEMO=1, documented as hiding the email, gates seven display surfaces and not the context builder. None of the documentation pages (environment variables, authentication, data usage, settings) mention it.
The reports. All are self-reported in the thread; they come from different accounts across three months:
- The reporter: the model passed
git -c user.email=<private address>on ten commits, overriding a configurednoreplyidentity; GitHub push protection blocked the push and the address stayed in the local reflog. - inigohidalgo (2026-09-01) and Goofables (2026-09-07, 2.1.263): the agent used the subscription email as the git identity.
- mootari (2026-10-20): the model placed the address in a
User-Agentheader on the web harness (Opus 5.5). - markblundeberg (2026-10-27): a subagent gave the address to a web service.
- Coice (2026-08-20): the model drew inferences from the address that changed its output.
- The model has also volunteered the sentence to the user unprompted ("My system prompt tells me your email address is…").
The vendor. No Anthropic or maintainer comment is on the thread; the issue carries the bug label and no assignee. The reporter's tag of a maintainer on 2026-08-20 drew no visible reply. Earlier issues on the same behaviour were closed: #53231 and #50702 as not planned after inactivity, #67605 as a duplicate of #58081, which was then locked. A Hacker News thread of 2026-10-29 ("Tell HN: Claude Code adds your email to the prompt, the LLM sends it to websites", TekMol) links the issue and a Reddit thread this run could not open.
Why it matters here. The address is a stable personal identifier inside every prompt, which makes it available to any content the agent reads: a prompt-injected README or web page that asks the model to include "the user's email" in a request gets it. The git reports are the concrete harm so far: a private address in commit metadata on a public repository is a disclosure that survives a force-push. The vendor's instruction sentence governs use, not presence, and the reports after 2.1.246 show the sentence is not sufficient.
Am I affected?
grep -o '"emailAddress":"[^"]*"' ~/.claude.json 2>/dev/null # the field the client reads; present means it is injected
git log --all --format='%ae%n%ce' | sort -u # addresses in your commits; look for one you did not configure
CLI=$(readlink -f "$(which claude)"); grep -ao 'userEmail:`[^`]\{0,200\}' "$CLI" | head -1 # the construction site, from the issue
- Signed in with a Claude account: affected on every reported version from 2.1.220 to 2.1.289.
- Using an API key, Bedrock or Vertex: a commenter (yurukusa) reports no
oauthAccountand therefore no injection; this file has not verified it.
If you are affected
- Check public repositories you pushed to from agent sessions for the address in author or committer fields; GitHub's push protection catches it only when enabled for the repository.
- Set and verify a repository-level
user.emailand watch for-c user.email=in the agent's git commands; the reports show the model overriding the configured value. - Reported workarounds, each partial: a CLAUDE.md instruction not to use the address (governs use, not presence); API-key authentication (no setting, changes billing); a local relay via
ANTHROPIC_BASE_URLthat strips the block (the relay sees your bearer token; a third-party relay is a worse exposure than the address). - Treat the address as a known-injected value when assessing a prompt-injection incident: if your local AI agent was exploited.
Prevention
- Agent sandboxing: egress controls limit where an injected identifier can go.
- Credential hygiene: what the client puts in context is part of your data footprint; know the fields.
Sources
- anthropics/claude-code — issue #81138: Account email (PII) is injected into the model's system prompt without consent, disclosure… — fetched 2026-10-29: opened 2026-07-25, the decompiled construction site, the version history 2.1.220 to 2.1.289, the five leak reports with dates and commenters, the
IS_DEMOfinding, the closed sibling issues, no vendor response, 19 comments. - Hacker News — Tell HN: Claude Code adds your email to the prompt, the LLM sends it to websites — fetched 2026-10-29 through the Algolia API: posted 2026-10-29 by TekMol, links the issue and a Reddit thread (not opened; reddit.com is not reachable from this sweep).
- Related in this corpus: Claude Code and Claude Desktop advisory batches for the product's own disclosure channel, which carries nothing on this behaviour.