TL;DR

Remove any model loaded from the Hugging Face accounts hhzz667, dsxk4mr8tq, MENXIANGYU, wjsbg, soumikmahato, r1r13 or htt0118 (31 repositories named qwen2-tiny, qwen2-mini, qwen2-final, llama-tiny-x1019 and variants) from your Hugging Face cache and Xinference registrations, and remove the miner, watchdog, cron entry, startup-file lines and SSH key the loader leaves on the host. Rotate Hugging Face tokens, cloud credentials, passwords and SSH keys the process could reach; Pluto Security (2026-10-29) is the single firm reporting, Hugging Face removed the first two accounts, and five were still live on 2026-10-30.

Packages and versions

Ecosystem Name Bad versions Clean version or action Registry state (date checked) Record
Hugging Face model repositories (wave 1) hhzz667/qwen2-shell, qwen2-tiny, qwen2-mini, qwen2-nano, qwen2-legacy, qwen2-final; dsxk4mr8tq/qwen2-tiny, qwen2-tiny-gpt2, qwen2-tiny-lite, qwen2-tiny-pure, qwen2-tiny-real, qwen2-tiny-assets every revision (uploaded 2026-09-21 to 10-12, per Pluto) remove; the genuine Qwen2 checkpoints are under the Qwen organisation both accounts return 401 from the models API (removed) on 2026-10-30; Pluto says Hugging Face and ModelScope removed them after its report none (no OSV or database record for model repositories)
Hugging Face model repositories (wave 2) MENXIANGYU (13 repositories: qwen2-tiny and variants, qwen2-mini-c4, qwen2-mini-c5, qwen2-ezv, llama-tiny-x1019, zz_ext, qa-whl-1021); wjsbg/eagle-tiny, qwen2-tiny-zh21, qwen2-final; soumikmahato/qwen2-tiny-chat; r1r13/qwen-lora-text-v1; htt0118/qwen2-tiny every revision (wave 2 appeared within days of the wave 1 takedown; htt0118 created 2026-10-25) remove; do not load with trust_remote_code=True MENXIANGYU/qwen2-tiny, wjsbg/qwen2-final, soumikmahato/qwen2-tiny-chat, r1r13/qwen-lora-text-v1 and htt0118/qwen2-tiny return 200 (live) on 2026-10-30; Pluto says some were still live eight days after reporting none

The repositories carry Python files named in config.json's auto_map (Pluto lists modeling_evil.py, modeling_evil2.py, modeling_evil6.py, modeling_qtz.py, modeling_parasit.py, configuration_parasit.py, modeling_hl.py) and a binary syscore.bin; Transformers runs the named Python before any weights load when trust_remote_code=True is set, and no malicious weights are needed. Pluto counts over 32,000 downloads across the campaign and linked repositories, which is downloads, not infections. Pluto also lists linked accounts and repositories outside the 31; this file names only the 31. One firm, one post, no Hugging Face statement read, so status: unconfirmed; the wave 1 removals are the registry-side fact that corroborates the report.

Am I affected?

  • You called from_pretrained with trust_remote_code=True on any repository above, or registered one in Xinference, since 2026-09-21.
# cached copies of the named repositories
ls -d ~/.cache/huggingface/hub/models--{hhzz667,dsxk4mr8tq,MENXIANGYU,wjsbg,soumikmahato,r1r13,htt0118}--* 2>/dev/null
# remote-code files Pluto names
find ~/.cache/huggingface /root/.xinference 2>/dev/null \( -name 'modeling_evil*.py' -o -name 'modeling_qtz.py' -o -name 'modeling_parasit.py' -o -name 'modeling_hl.py' -o -name 'syscore.bin' \)
# host artifacts Pluto names
ls -la /tmp/.cch /tmp/.cchx /tmp/.kitsd /tmp/.c /tmp/.cache-hf /root/.hl /etc/cron.d/.sync-helper /tmp/.qa_pwned ~/qa_pwned 2>/dev/null
grep -n 'svc.py\|\.cch' /root/.bashrc /root/.profile ~/.bashrc 2>/dev/null
ps -eo pid,user,args | grep -E '\[kworker/u20:1\]' | grep -v grep     # a kernel-thread name with userspace arguments
xinference list 2>/dev/null | grep -E 'qwen2-tiny-|ezv-'              # registrations named qwen2-tiny-<base32> or ezv-<base32>
  • Any of these, or an unrecognised key in authorized_keys on a GPU host, means the loader ran. Pluto notes that no single missing indicator rules out compromise.

If you are affected

  1. Isolate the host and restrict outbound traffic; preserve processes, connections, logs, the model cache and startup files before deleting.
  2. Remove the loader files, the miner and watchdog, the cron entry, the startup-file lines, the Xinference registrations and any added SSH key; Pluto also says to review miners the loader deleted as competitors. Rebuild from a trusted image if host integrity cannot be established: if you ran a malicious postinstall covers the same clean-up order.
  3. Rotate Hugging Face tokens, cloud credentials, passwords and SSH keys the process could reach, and review their recent use: rotating cloud credentials.
  4. Require authentication on the Xinference API and limit who can reach it; Pluto describes registrations arriving through it.

Prevention

  • Do not set trust_remote_code=True for a repository you have not read; review every .py file auto_map points at, and pin the reviewed revision. The official checkpoints live under the Qwen organisation, not under a personal account with a -tiny or -final suffix.
  • Run model loading with limited privileges, no production secrets and restricted egress: agent sandboxing.
  • A model repository is a package: package vetting checklist, supply-chain attack surface.

Sources

  • Pluto Security — Load/Mine: a Hugging Face malware campaign — fetched 2026-10-30: 2026-10-29, Shaked Chen, Eitan Chassid and Yotam Perkal; the seven accounts and 31 repositories, the upload dates, the trust_remote_code loading condition, the file names, the host paths and process names, the Xinference registrations, the remediation list, the wave 1 takedown and wave 2 reappearance, the 32,000-download figure. Single firm.
  • Hugging Face models API (huggingface.co/api/models/<owner>/<name>), queried 2026-10-30: hhzz667/qwen2-tiny and dsxk4mr8tq/qwen2-tiny return 401; MENXIANGYU/qwen2-tiny, htt0118/qwen2-tiny, wjsbg/qwen2-final, soumikmahato/qwen2-tiny-chat and r1r13/qwen-lora-text-v1 return 200.
  • Hacker News item 50303651 ("Fake Qwen2 checkpoints on Hugging Face mine crypto via trust_remote_code"), read through the Algolia items API 2026-10-30: 2026-10-30 13:33 UTC, linking the Pluto post. No Hugging Face statement was found this run.